Project File
Galaxy Helios campus
Dickens County,TexasExpandingLast checked Nov 13, 2026
GalaxyDeveloper and operatorAEP TexasElectric utilityCoreWeaveEnd user
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Still to confirm: City or address
- Still to confirm: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Galaxy Helios campus is an expanding data center project in Dickens County, Texas. Galaxy is named as operator. It was announced at 1,600 MW.
Galaxy Helios campus is an expanding data center project in Dickens County, Texas. Galaxy is named as operator. It was announced at 1,600 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Dickens County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has 1,600 MW announced on record, but its demand as the service measures it and its participation in another reliability or ancillary service are not on record.
“The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))
Rule checks: Project is in Texas; 1,600 MW on record (announced), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
Public records
10 records found so far. 7 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Decided · Oct 15, 2026Joint Application of West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · Pending before the commission · Oct 8, 2026Joint Application of Willow Springs Wind Farm, LLC and Haskell DC Owner LLC for Approval of a Net Metering Arrangement
- Utility commission · Pending before the commission · Sep 22, 2026SB 6 Implementation
- Utility commission · Decided · Sep 18, 2026Rulemaking to Implement Large Load Interconnection Standards Under PURA 37.0561
- Utility commission · Proposed · Jul 24, 2026Rulemaking to Update Wholesale and IOU Retail Transmission Cost Recovery in the ERCOT Region
- Utility commission · Decided · Mar 26, 2026Rulemaking for Net Metering Arrangements Involving a Large Load Co-Located with an Existing Generation Resource Under PURA 39.169
- Utility commission · Decided · Feb 6, 2026Rulemaking to Establish Large Load Forecasting Criteria Under PURA 37.0561
- Utility commission · Pending before the commission · Jun 20, 2025Large Load Demand Management Service
Questions people ask
- Where is Galaxy Helios campus?
- Galaxy Helios campus is a data center project in Dickens County, Texas.
- Who operates Galaxy Helios campus?
- Galaxy is named as the operator of Galaxy Helios campus.
- How big is Galaxy Helios campus?
- Galaxy Helios campus was announced at 1,600 MW of capacity.
- What stage is Galaxy Helios campus?
- Galaxy Helios campus is expanding.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Chapter 312 Tax Abatement Agreements detail file (registry download), last updated 2026-10-10
Texas Comptroller of Public AccountsTier 1 · Captured 2026-11-09 · Open the source - 2Proposal for Publication of Amendments to 25.192 and 25.193 and New 25.252, Project No. 58000, Item 8
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 3Texas Register, Proposed Rules, Title 16 (July 24, 2026 issue)
Texas Secretary of StateTier 1 · Captured 2026-11-07 · Open the source - 4SB 6 Rulemakings Chart
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 5Senate Bill 6 enrolled bill analysis
Texas Senate Research CenterTier 1 · Captured 2026-11-07 · Open the source - 6Large Load Update, presentation to the House State Affairs Committee
ERCOTTier 1 · Captured 2026-11-07 · Open the source - 7PUCT sets financial commitments for data center interconnection as governor pauses permit approvals
White and Case LLPTier 2 · Captured 2026-11-07 · Open the source - 8PUCT Adopts 16 TAC 25.194: Texas Large Load Financial Security Replaces the Interconnection Fee
SiteBraidTier 3 · Captured 2026-11-07 · Open the source - 9PUCT Interchange filing index, Project or Docket No. 59943
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 10PUCT Interchange filing index, Project or Docket No. 58317
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 11PUCT Interchange filing index, Project or Docket No. 59115
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 12Galaxy Digital Form 8-K: Helios Campus ERCOT Approval for Additional 830 MW
Galaxy Digital Inc. (SEC Form 8-K)Tier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page