Utility commission
Application of El Paso Electric Company for an Economic Development Rate Rider for a New Data Center to be Located in El Paso, Texas
Where it stands: Decided as of Jul 31, 2025
Draft research, not yet verified. Open a source to check any detail.
What it is
Single customer economic development rate rider for the new Wurldwide data center in El Paso, approved by stipulation and final order (July 31, 2025); a clean copy of the approved rider was filed August 5, 2025. The rider document itself was filed confidential in the public index, so the rider’s term, minimum billing, and collateral figures are not public in this record and are not stated here. The approved schedule is later referenced (in the Docket No. 59611 filing) as Rate Schedule 33A.
The facts
- Regulator
- Public Utility Commission of Texas
- Docket number
- Docket No. 56903
- Type
- Large load tariff
- Utility
- El Paso Electric Co
- State
- Texas
- Filed
- Aug 1, 2024
- Status date
- Jul 31, 2025
- Large-load rules
- Yes
Related cases and proceedings
- Utility commission · DecidedApplication of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · DecidedApplication of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
- Utility commission · DecidedRulemaking for Net Metering Arrangements Involving a Large Load Co-Located with an Existing Generation Resource Under PURA 39.169
- Utility commission · DecidedRulemaking to Establish Large Load Forecasting Criteria Under PURA 37.0561
- Utility commission · Pending before the commissionEvaluation of Transmission Cost Recovery
- Utility commission · Pending before the commissionLarge Load Demand Management Service
In the record
- Utility case, Aug 1, 2024. Utility case filed: Application of El Paso Electric Company for an Economic Development Rate Rider for a New Data Center to be Located in El Paso, Texas Public Utility Commission of Texas, Docket No. 56903
Sources
- 1PUCT Interchange filing index, Project or Docket No. 56903
Public Utility Commission of TexasTier 1 · Index of filings: application of August 1, 2024; stipulation and final order (July 31, 2025); clean tariff copy filed August 5, 2025; Docket No. 59611 application (Schedule 33A reference) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of El Paso Electric Company for an Economic Development Rate Rider for a New Data Center to be Located in El Paso, Texas." Last activity 2025-07-31. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-el-paso-electric-data-center-rider-56903