Project File · Public records
Every public record we have for Lancium Clean Campus data centers (Crusoe)
Abilene, Taylor County, TexasUnder constructionFirst public 2021Filing entity: LanciumLast checked Nov 13, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
3 of 37 records · showing environmental permits only ·
2026
Air permitUnder reviewAug 5, 2026Texas Commission on Environmental Quality
Texas Commission on Environmental Quality, Permit No. 182126 / PSDTX1688 / GHGPSDTX263
Executive director completed the technical review and prepared a draft permit (preliminary decision); final approval not yet issued
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
NAPD, Application and Preliminary Decision section; Notice Issuance Date: August 5, 2026
2025
Air permitUnder reviewNov 7, 2025Texas Commission on Environmental Quality
Texas Commission on Environmental Quality, Permit No. 182126 / PSDTX1688 / GHGPSDTX263
- Stated in the filing:
- 760.33 tons per year of nitrogen oxides (NOx), proposed emissions
- Stated in the filing:
- 451.1 tons per year of particulate matter, 10 microns or less (PM10), proposed emissions
- Stated in the filing:
- 313.2 tons per year of particulate matter, 2.5 microns or less (PM2.5), proposed emissions
- Stated in the filing:
- 815.59 tons per year of volatile organic compounds (VOC), proposed emissions
- Stated in the filing:
- 49.77 tons per year of hazardous air pollutants (HAPs), proposed emissions
- Stated in the filing:
- 233.9 tons per year of sulfur dioxide (SO2), proposed emissions
- Stated in the filing:
- 870.07 tons per year of carbon monoxide (CO), proposed emissions
- Buildings:
- 2 buildings (Buildings 9 and 10)
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
NORI (notice issued November 19, 2025): application by Crusoe Energy Systems LLC for Longhorn Data Center Buildings 9 and 10, 615 Farm-to-Market Road 2404, Abilene
Air permitApprovedJan 22, 2025Texas Commission on Environmental Quality
Texas Commission on Environmental Quality, Standard Permit Registration No. 177263 (Project No. 387309)
Revision authorized (January 2025 revision); standard permit expires August 21, 2034
- Permitted run hours:
- 8,760 hours per year per GE LM2500 turbine
- Generator capacity:
- 360.5 MW
- Generator capacity:
- 34.1 MW per GE LM2500 turbine (site-rated)
- Stated in the filing:
- 10 natural gas simple-cycle turbines (5 Titan 350 and 5 GE LM2500)
- Generator capacity:
- 38 MW per Titan 350 turbine (site-rated)
Draft research, not yet verifiedLast checked Nov 8, 2026Where it says this
Authorization letter and Technical Review, Electric Generating Units Air Quality Standard Permit, Abilene DC 1 LLC, Longhorn Data Center
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
Sources
- 1Technical Review, Standard Permit Registration No. 177263 (Project No. 387309), Longhorn Data Center
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 2Electric Generating Units Air Quality Standard Permit revision authorization letter, Registration No. 177263, Abilene DC 1 LLC (Longhorn Data Center)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 3Plain Language Summary for New Source Review, Initial Application for Air New Source Review Permit Numbers 182126, GHGPSDTX263 and PSDTX1688, Crusoe Energy Systems LLC (CN606257079), Longhorn Data Center (RN112029061)
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 4Notice of Receipt of Application and Intent to Obtain Air Permit (NORI), Permit 182126 / PSDTX1688 / GHGPSDTX263, Crusoe Energy Systems LLC, Longhorn Data Center Buildings 9 and 10
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 5Taxpayer Records (franchise tax, with Secretary of State file numbers and charter dates)
Texas Comptroller of Public Accounts (data.texas.gov)Tier 1 · Captured 2026-11-08 · Open the source - 6Notice of Application and Preliminary Decision for Air Quality Permits, Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263, Crusoe Technologies LLC, Abilene, Taylor County
Texas Commission on Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 7Commissioners Court Minutes, September 9, 2025
Taylor CountyTier 1 · Captured 2026-11-07 · Open the source - 8Taylor County commissioners approve tax abatement for Lancium, Abilene Reporter-News, December 21, 2021
Abilene Reporter-NewsTier 3 · Captured 2026-11-07 · Open the source - 9Commissioners Court meeting record, December 21, 2021
Taylor CountyTier 1 · Captured 2026-11-07 · Open the source - 10
- 11Commissioners Court Minutes, December 16, 2025
Taylor CountyTier 1 · Captured 2026-11-09 · Open the source - 12DCOA Board Meeting Packet, August 5, 2025
Development Corporation of AbileneTier 1 · Captured 2026-11-07 · Open the source - 13Second Tax Abatement Agreement (Phase 10), City of Abilene, Texas, Lancium LLC and Abilene DC 10, LLC
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 14Resolution No. 171-2025, City of Abilene, approving Tax Abatement Agreements and Second Tax Abatement Agreements with Lancium, LLC and Abilene DC 1, 3, 4, 5, 6, 7 and 8, LLC (Phases 1-8)
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 15Second Tax Abatement Agreement (Phase 5), City of Abilene, Texas, Lancium LLC and Abilene DC 5, LLC
City of AbileneTier 1 · Captured 2026-11-09 · Open the source - 16Abilene Ordinance 100-2025, 3rd Amendment to Planned Development District 181
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 17Abilene Ordinance 56-2025, PDD-181 buffer exhibit amendment
City of Abilene (Municode MuniDocs)Tier 1 · Captured 2026-11-08 · Open the source - 18Abilene Land Development Code, Section 4.2.9.2, Performance Standards Regulating Noise (Table 4-3)
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 19Abilene Code of Ordinances, Section 20-1, Noise control generally
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 20Abilene Land Development Code, Section 2.3.4.5, Planned Development (PD) District
City of Abilene (Municode)Tier 1 · Captured 2026-11-08 · Open the source - 21Proposal for Publication of Amendments to 25.192 and 25.193 and New 25.252, Project No. 58000, Item 8
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 22Texas Register, Proposed Rules, Title 16 (July 24, 2026 issue)
Texas Secretary of StateTier 1 · Captured 2026-11-07 · Open the source - 23SB 6 Rulemakings Chart
Public Utility Commission of TexasTier 1 · Captured 2026-11-07 · Open the source - 24Senate Bill 6 enrolled bill analysis
Texas Senate Research CenterTier 1 · Captured 2026-11-07 · Open the source - 25Large Load Update, presentation to the House State Affairs Committee
ERCOTTier 1 · Captured 2026-11-07 · Open the source - 26PUCT sets financial commitments for data center interconnection as governor pauses permit approvals
White and Case LLPTier 2 · Captured 2026-11-07 · Open the source - 27PUCT Adopts 16 TAC 25.194: Texas Large Load Financial Security Replaces the Interconnection Fee
SiteBraidTier 3 · Captured 2026-11-07 · Open the source - 28PUCT Interchange filing index, Project or Docket No. 59943
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 29PUCT Interchange filing index, Project or Docket No. 58317
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 30PUCT Interchange filing index, Project or Docket No. 59115
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 31The Development Corporation of Abilene City of Abilene and Taylor County Announce Expanded Development within Lancium's Clean Campus through Crusoe's 998000 Square Foot Data Center Project
Development Corporation of AbileneTier 1 · Captured 2026-11-07 · Open the source - 32Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts
Crusoe (via GlobeNewswire, on Lancium's site)Tier 4 · Captured 2026-11-07 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page