NTT Chicago Campus (Itasca)

Itasca,DuPage County,IllinoisOperatingFirst public 2021Last checked Nov 8, 2026

NTTDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

NTT Chicago Campus (Itasca) is an operating data center project in Itasca, DuPage County, Illinois. NTT is named as operator. It was first public in 2021. It was announced at 104 MW.

NTT Chicago Campus (Itasca) is an operating data center project in Itasca, DuPage County, Illinois. NTT is named as operator. It was announced at 104 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Itasca, DuPage County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

NTT Chicago Itasca video · 2 min 11 sec

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

104 MWAnnounced capacity
1Public records we have found
1Tax agreement on record

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Aerial view of NTT Chicago Campus (Itasca) in Itasca, DuPage County, Illinois, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside DuPage County, Illinois.See every project on the map

Timeline

  1. · New projectFirst public record of NTT Chicago Campus (Itasca)Operating
  2. · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for NTT Global Data CentersState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

  • Developer and operatorNTT

Power

Capacity, as announced or filed

  • 72 MW · Dec 2021 · it_load
  • 36 MW · CH1Jan 2023 · it_load
  • 104 MW · Sep 2026 · it_load

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is NTT Chicago Campus (Itasca)?
NTT Chicago Campus (Itasca) is a data center project in Itasca, DuPage County, Illinois.
Who operates NTT Chicago Campus (Itasca)?
NTT is named as the operator of NTT Chicago Campus (Itasca).
How big is NTT Chicago Campus (Itasca)?
NTT Chicago Campus (Itasca) was announced at 104 MW of capacity.
What stage is NTT Chicago Campus (Itasca)?
NTT Chicago Campus (Itasca) is operating. It was first public in 2021.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Factsheet: Chicago CH1 Data Center
    NTT Global Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    NTT: A worldwide expansion
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  4. 4
    Tokyo Century invests in NTT's Chicago data center campus
    SDxCentral
    Tier 3 · Captured 2026-11-08 · Open the source
  5. 5
    NTT acquires office buildings in Chicago, plans to demolish for data centers
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  6. 6
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page