city Card
Data centers in Aurora, Illinois
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 3 data center projects in Aurora, Illinois as of November 2026: 2 operating and 1 under construction, totaling about 136 MW announced where a figure is published.
Aurora has 3 tracked data centers. Their announced capacity totals about 136 MW where a figure is published. Of those, 2 operating and 1 under construction. The projects here are CyrusOne Aurora Bilter Road Campus, CyrusOne Aurora Campus (CHI1-CHI3), and Edged Chicago Campus (ORD01). Every figure comes from the public record linked on this page.
Data center projects in Aurora
- CyrusOne Aurora Bilter Road Campus
Under constructionAurora40 MW announced
- CyrusOne Aurora Campus (CHI1-CHI3)
OperatingAurora
- Edged Chicago Campus (ORD01)
OperatingAurora96 MW announced
Who serves this place
- Not collected yet.
More places in DuPage County
Aurora is part of DuPage County.
Tax breaks and payments
2022 · CyrusOne Aurora Campus (CHI1-CHI3)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for CyrusOne Aurora Campus (CHI1-CHI3)2024 · CyrusOne Aurora Campus (CHI1-CHI3)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for CyrusOne Aurora Campus (CHI1-CHI3)
Court cases and commission dockets in Illinois (3)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 4004 · In committee · May 22, 2026Would create the Data Center Water Transparency and Aquifer Protection Act
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
- SB 3830 · In committee · May 22, 2026Would establish the data center self-direct program and related data center provisions
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Aurora?
- Data Center Fact Check tracks 3 data center projects in Aurora as of November 2026. Of those, 2 operating and 1 under construction.
- What is the biggest data center in Aurora?
- By announced capacity, the biggest data center in Aurora is Edged Chicago Campus (ORD01), announced at 96 MW. It is operating.
- How much power do data centers in Aurora use?
- The 3 projects tracked in Aurora have announced about 136 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Aurora." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-aurora
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page