village Card
Data centers in Lombard, Illinois
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Lombard, Illinois as of November 2026, totaling about 12 MW announced where a figure is published.
Lombard has 1 tracked data center project. Their announced capacity totals about 12 MW where a figure is published. The project here is CyrusOne Lombard (CHI5), operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Lombard
- CyrusOne Lombard (CHI5)
OperatingLombard12 MW announced
Who serves this place
- Not collected yet.
More places in DuPage County
Lombard is part of DuPage County.
Court cases and commission dockets in Illinois (3)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 4004 · In committee · May 22, 2026Would create the Data Center Water Transparency and Aquifer Protection Act
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
- SB 3830 · In committee · May 22, 2026Would establish the data center self-direct program and related data center provisions
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Lombard?
- Data Center Fact Check tracks 1 data center project in Lombard as of November 2026.
- What is the biggest data center in Lombard?
- By announced capacity, the biggest data center in Lombard is CyrusOne Lombard (CHI5), announced at 12 MW. It is operating.
- How much power do data centers in Lombard use?
- The 1 projects tracked in Lombard have announced about 12 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Lombard." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-lombard
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page