Aurora,Kendall County,IllinoisOperatingFirst public 2023Last checked Nov 8, 2026

EdgedDeveloper and operatorSeefried Industrial PropertiesDeveloperFCL BuildersBuilder

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Edged Chicago Campus (ORD01) is an operating data center project in Aurora, Kendall County, Illinois. Edged is named as operator. It was first public in 2023. It was announced at 96 MW.

Edged Chicago Campus (ORD01) is an operating data center project in Aurora, Kendall County, Illinois. Edged is named as operator. It was announced at 96 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Aurora, Kendall County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

96 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Kendall County, Illinois.See every project on the map

The land, to scale

One football field
65 acres, about 49 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Edged Chicago Campus (ORD01)Operating

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 100 MW · May 2023 · what the figure measures is not stated
  • 72 MW · ORD01-2Feb 2025 · what the figure measures is not stated
  • 24 MW · ORD01-1Feb 2025 · what the figure measures is not stated
  • 96 MW · Feb 2025 · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Edged Chicago Campus (ORD01)?
    Edged Chicago Campus (ORD01) is a data center project in Aurora, Kendall County, Illinois.
    Who operates Edged Chicago Campus (ORD01)?
    Edged is named as the operator of Edged Chicago Campus (ORD01).
    How big is Edged Chicago Campus (ORD01)?
    Edged Chicago Campus (ORD01) was announced at 96 MW of capacity. The site covers 65 acres.
    What stage is Edged Chicago Campus (ORD01)?
    Edged Chicago Campus (ORD01) is operating. It was first public in 2023.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Edged Opens New Data Center to Power Chicago's AI Boom
      Edged
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Chicago Data Center Campus (ORD01)
      Edged
      Tier 4 · Captured 2026-11-08 · Open the source
    3. 3
      Edged Energy breaks ground on data center outside Chicago, Illinois
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source
    4. 4
      Edged launches first phase of 96MW Chicago data center campus
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page