Skip to content

Project File

Fermi Project Matador (Advanced Energy and Intelligence Campus)

Carson County,TexasUnder constructionFirst public 2025Last checked Nov 12, 2026

Fermi AmericaDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
  • Still to confirm: City or address
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Fermi Project Matador (Advanced Energy and Intelligence Campus) is a under-construction data center project in Carson County, Texas. Fermi America is named as operator. It was first public in 2025. It was announced at 11,000 MW.

Fermi Project Matador (Advanced Energy and Intelligence Campus) is an under-construction data center project in Carson County, Texas. Fermi America is named as operator. It was announced at 11,000 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Carson County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

11,000 MWAnnounced capacity
2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Carson County, Texas.See every project on the map

The land, to scale

One football field
5,769 acres, about 4,363 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · DecisionU.S. Nuclear Regulatory Commission: Parts 1 and 2 accepted for docketing; acceptance review complete for Fermi Project Matador (Advanced Energy and Intelligence Campus)Combined License Application, dockets 05200051, 05200052, 05200053, 05200054; Project No. 999-02146
  2. · New projectFirst public record of Fermi Project Matador (Advanced Energy and Intelligence Campus)Under construction
  3. · FilingFiled with U.S. Nuclear Regulatory Commission for Fermi Project Matador (Advanced Energy and Intelligence Campus)Combined License Application, dockets 05200051, 05200052, 05200053, 05200054; Project No. 999-02146

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has 11,000 MW announced on record, but its demand as the service measures it and its participation in another reliability or ancillary service are not on record.

    “The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))

    Rule checks: Project is in Texas; 11,000 MW on record (not stated), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 11,000 MW · Full build (announced total)Jun 2025 · what the figure measures is not stated

Public records

2 records found so far. 7 kinds of record are still being collected.

See every record

Court cases and commission dockets

Questions people ask

Where is Fermi Project Matador (Advanced Energy and Intelligence Campus)?
Fermi Project Matador (Advanced Energy and Intelligence Campus) is a data center project in Carson County, Texas.
Who operates Fermi Project Matador (Advanced Energy and Intelligence Campus)?
Fermi America is named as the operator of Fermi Project Matador (Advanced Energy and Intelligence Campus).
How big is Fermi Project Matador (Advanced Energy and Intelligence Campus)?
Fermi Project Matador (Advanced Energy and Intelligence Campus) was announced at 11,000 MW of capacity. The site covers 5,769 acres.
What stage is Fermi Project Matador (Advanced Energy and Intelligence Campus)?
Fermi Project Matador (Advanced Energy and Intelligence Campus) is under construction. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Fermi America Project Matador Advanced Energy and Intelligence Campus AP1000 Units 1-4, Combined License Application
    U.S. Nuclear Regulatory Commission
    Tier 1 · Captured 2026-11-12 · Open the source · Archived copy
  2. 2
    PUCT Interchange filing index, Project or Docket No. 60332
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Fermi America and the Texas Tech University System First to Answer President Trump's Call for Global Energy and AI Dominance
    Fermi America (PR Newswire release on company site)
    Tier 4 · Captured 2026-11-08 · Open the source
  4. 4
    TTU System and Fermi America Announce Partnership (Advanced Energy and Intelligence Campus)
    Texas Tech University System
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page