Project File
Switch Citadel Campus (TAHOE RENO)
Storey County,NevadaOperatingFirst public 2015Filing entity: Switch, Ltd.Last checked Nov 8, 2026
SwitchDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: City or address
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Switch Citadel Campus (TAHOE RENO) is an operating data center project in Storey County, Nevada. Switch is named as operator. It was first public in 2015. No site capacity figure is published for this project.
Switch Citadel Campus (TAHOE RENO) is an operating data center project in Storey County, Nevada. Switch is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Storey County, Nevada. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
- Property tax
State audits found Switch compliant on both 2015 Storey County abatements, with 22 and 111 jobs found against projections of 10 and 50.
Comes to the community - Tax breaks
Nevada approved two Switch abatements in July 2015: sales and use tax relief of $7,621,000 and $75,720,025, plus personal property relief.
Comes from the community - Money for schools and services
Switch agreed to help bond and build the effluent pipeline serving the industrial center, at no cost to the cities of Reno and Sparks.
Comes to the community - Electricity bill
Sierra Pacific Power serves this campus; Switch's first bid to buy power elsewhere was denied in 2015, its second approved by settlement in 2016.
Comes from the community - Water
TRI GID supplies water and sewer service at the industrial center, and its treatment plant's discharge permit names a reclaimed water outfall for Switch.
Comes from the community - Jobs
GOED's five year audits of Switch's 2015 abatements found 111 jobs at a $50.97 average wage, against projections of 50 jobs at $28.98.
Comes to the community - Next door: height, setbacks, noise
The state air permit limits Switch's backup generators to daytime testing hours, 6 a.m. to 7 p.m., with caps on combined operating hours.
Local rule - Your say
Nevada's economic development board approved this campus's tax abatements in July 2015; the Sparks council took up its reclaimed water pipeline in 2017.
How to take part
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · FilingFiled with Nevada Division of Environmental Protection, Bureau of Air Pollution Control for Switch Citadel Campus (TAHOE RENO)Director's Review and Preliminary Determination, revised Class I OPTC AP7375-3672 (FIN A1896A)
- · FilingFiled with Public Utilities Commission of Nevada for Switch Citadel Campus (TAHOE RENO)Docket No. 25-05001 (UEPA)
- · FilingFiled with Nevada Governor's Office of Economic Development for Switch Citadel Campus (TAHOE RENO)Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
- · FilingFiled with Public Utilities Commission of Nevada for Switch Citadel Campus (TAHOE RENO)Docket No. 20-01024 (UEPA)
- · FilingFiled with City of Sparks City Council for Switch Citadel Campus (TAHOE RENO)General Business Item 9.4, meeting of May 8, 2017
- · DecisionNevada Division of Environmental Protection, Bureau of Air Pollution Control: Class I OPTC issued to Switch, Ltd. for the facility at 1 Superloop Circle, McCarran, NV 89434 (air permit) for Switch Citadel Campus (TAHOE RENO)Class I Operating Permit to Construct AP7375-3672; Facility ID No. A1896
- · Tax dealTax agreement approved: Partial tax abatement (nrs 360.750) for Switch, LTDGOED's published approval (July 2015, FY2016 table) for Switch, LTD #1 in Storey County: approved partial sales and use tax abatement of $7,621,000 and an approved partial 10-year personal property tax abatement of $4,943,500, against a ...
- · Tax dealTax agreement approved: Partial tax abatement for data centers (nrs 360.754) for Switch, LTDGOED's published approval (July 2015, FY2016 table) for Switch, LTD #2 in Storey County under the data center program: approved partial sales and use tax abatement of $75,720,025 over a 20-year sales and use term, and a personal property...
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Nevada EO 2026-005: Sets state standards data centers must meet for tax abatements
The act covers data centers seeking a partial tax abatement, whose applications may not go before the GOED Board unless the developer agrees to pay the Local School Support Tax in full and executes a binding Community Support Commitment; this project has 650 MW on record (not stated), but whether this project seeks a partial tax abatement is not on record.
“data center applications seeking a partial tax abatement cannot be brought before the GOED Board unless the developer agrees to pay the Local School Support Tax in full and executes a binding Community Support Commitment.” (Governor's announcement of Executive Order 2026-005)
Rule checks: Project is in Nevada. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Nevada
- EO 2026-005 · In effect · Sep 18, 2026Sets state standards data centers must meet for tax abatements
Who's involved
- Developer and operatorSwitch
Power
Capacity, as announced or filed
- 650 MW · Campus total (design)Feb 2017 · what the figure measures is not stated
- 130 MW · TAHOE RENO 1 (first building)Feb 2017 · what the figure measures is not stated
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Nevada Governor's Office of Economic Development, Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
- Stated in the filing
- 50 employees
- Stated in the filing
- $29 per hour
- Stated in the filing
- $1.39 billion
- Stated in the filing
- $1.8 million
- Stated in the filing
- $179.9 million
- Stated in the filing
- 111 jobs
- Stated in the filing
- 22 jobs
- Stated in the filing
- $4.9 million
- Stated in the filing
- $75.7 million
- Stated in the filing
- $7.6 million
- Stated in the filing
- $31 per hour
- Stated in the filing
- 10 employees
- Stated in the filing
- $136.1 million
- Stated in the filing
- $32.1 million
Nevada Division of Environmental Protection, Groundwater Discharge Permit NS2000502 (TRI-GID Wastewater Treatment Plant)
- Stated in the filing
- External Outfall 011 named SWITCH; reclaimed water from the TRI-GID reservoir is usable for irrigation, dust control, or cooling water at multiple facilities within the industrial center
- Stated in the filing
- Monitor and report only: continuous meter, reported monthly, in million gallons per day; no numeric flow limit or volume is stated for Switch
Nevada Division of Environmental Protection, Bureau of Air Pollution Control, Class I Operating Permit to Construct AP7375-3672; Facility ID No. A1896
- Stated in the filing
- Sections 10, 11, 13-16, 21-24, 26, 27, T 19 N, R 22 E, MDB&M; HA 83, Tracy Segment of Truckee River Basin, Storey County
- Stated in the filing
- 1 Superloop Circle, McCarran, NV 89434
- Stated in the filing
- 186 gallons per hour per unit
- Stated in the filing
- UTM Zone 11, NAD 83: East 286,947 m, North 4,377,021 m
- Stated in the filing
- 7,879 hours per 12-month rolling period
- Backup generators
- 1 diesel-fired emergency generator (System 09, S2.003), Kohler/Rehlko model 350REOZJC Diesel, 538 hp, year 2025
Nevada Legislature, Interim Finance Committee, Resolution approving Storey County's economic development financing proposal (Storey County Resolution No. 18-501)
- Stated in the filing
- $35 million
Nevada Division of Environmental Protection, Bureau of Air Pollution Control, Director's Review and Preliminary Determination, revised Class I OPTC AP7375-3672 (FIN A1896A)
- Stated in the filing
- 172.6 tons per year
- Stated in the filing
- S2.001 and S2.002: Clarke JU6H-UFADN0 emergency diesel fire pump engines, 197 hp each, year 2025; S2.003: Kohler/Rehlko 350REOZJC diesel emergency generator, 538 hp, year 2025
- Stated in the filing
- 22,951.6 tons per year CO2e
City of Sparks City Council, General Business Item 9.4, meeting of May 8, 2017
- Stated in the filing
- 4,000 acre_feet per year
Public records
23 records found so far. 4 kinds of record are still being collected.
- Environmental permits1
- Water supply and use1
- Power and utility10
- Tax breaks and payments3
- Votes and minutes8
Court cases and commission dockets
- Utility commission · Pending before the commission · Nov 8, 2026Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
- Utility commission · Pending before the commission · Nov 8, 2026Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
- Utility commission · Pending before the commission · Nov 8, 2026Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commission · Nov 8, 2026Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
- Utility commission · Decided · Oct 7, 2026Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
- Utility commission · Pending before the commission · Jul 14, 2026Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commission · May 6, 2026Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
- Utility commission · Decided · Mar 11, 2025Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
Questions people ask
- Where is Switch Citadel Campus (TAHOE RENO)?
- Switch Citadel Campus (TAHOE RENO) is a data center project in Storey County, Nevada.
- Who operates Switch Citadel Campus (TAHOE RENO)?
- Switch is named as the operator of Switch Citadel Campus (TAHOE RENO).
- What stage is Switch Citadel Campus (TAHOE RENO)?
- Switch Citadel Campus (TAHOE RENO) is operating. It was first public in 2015.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1GOED Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 2PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 3Draft Groundwater Discharge Permit NS2000502, TRI-GID Wastewater Treatment Plant, 145 Britain Way, McCarran, Nevada
Nevada Division of Environmental ProtectionTier 1 · Captured 2026-11-09 · Open the source - 4Class I Air Quality Operating Permit to Construct AP7375-3672, Facility ID A1896, issued to Switch, Ltd.
Nevada Division of Environmental Protection, Bureau of Air Pollution ControlTier 1 · Captured 2026-11-09 · Open the source - 5Director's Review and Preliminary Determination of Permit Issuance for Switch, Ltd., Storey County, Nevada
Nevada Division of Environmental Protection, Bureau of Air Pollution ControlTier 1 · Captured 2026-11-09 · Open the source - 6Interim Finance Committee resolution approving the Storey County economic development financing proposal for the TMWRF-to-TRIC effluent pipeline
Nevada Legislature, Interim Finance CommitteeTier 1 · Captured 2026-11-09 · Open the source - 7Sparks City Council meeting May 8, 2017, General Business Item 9.4: TRI GID proposal for use of reclaimed water from the Truckee Meadows Water Reclamation Facility
City of Sparks, NevadaTier 1 · Captured 2026-11-09 · Open the source - 8Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Captured 2026-11-09 · Open the source - 9The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 102026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
NV EnergyTier 2 · Captured 2026-11-08 · Open the source - 112026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
NV EnergyTier 1 · Captured 2026-11-09 · Open the source - 12Storey County Board of County Commissioners minutes, July 21, 2026 (as published in the September 1, 2026 meeting packet)
Storey CountyTier 1 · Captured 2026-11-09 · Open the source - 13Switch filings reveal diesel expansion before NDEP's listed dates (Nevada DEP air permit applications, facility A1896A, October 2026)
W4 News (reporting on NDEP public filings)Tier 3 · Captured 2026-11-08 · Open the source - 14Switch Citadel Campus (Tahoe Reno) - announced vs energized capacity ledger
DEPLOY registryTier 3 · Captured 2026-11-08 · Open the source - 15First Solar, NV Energy and Switch Partner on New 100 Percent Green, Renewable Energy Program (July 14, 2015)
NV Energy (company newsroom)Tier 4 · Captured 2026-11-09 · Open the source - 16The Citadel Campus, Tahoe Reno (Switch locations page)
SwitchTier 4 · Captured 2026-11-09 · Open the source - 17Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World
SwitchTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page