Skip to content

Project File · Public records

Every public record we have for Switch Citadel Campus (TAHOE RENO)

Storey County, NevadaOperatingFirst public 2015Filing entity: Switch, Ltd.Last checked Nov 8, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

1 of 23 records · showing water supply and use only ·

No date in the record(rules in force and undated records)

  • Water agreementUnder reviewNo date in the recordNevada Division of Environmental Protection

    Nevada Division of Environmental Protection, Groundwater Discharge Permit NS2000502 (TRI-GID Wastewater Treatment Plant)

    Draft permit and major modification for the TRI-GID wastewater treatment plant at 145 Britain Way, McCarran; treated effluent goes to a reservoir about 1.3 miles southeast for reclaimed use including cooling water at industrial center facilities

    Reclaimed water outfall:
    External Outfall 011 named SWITCH; reclaimed water from the TRI-GID reservoir is usable for irrigation, dust control, or cooling water at multiple facilities within the industrial center
    Reclaimed water flow terms:
    Monitor and report only: continuous meter, reported monthly, in million gallons per day; no numeric flow limit or volume is stated for Switch
    Draft research, not yet verified
    Where it says this

    Draft permit text: permit effective December 1, 2023, major modification effective November 1, 2026, expires November 30, 2028; outfall table entry '011 External Outfall SWITCH'; Re-use Discharge Limitations Tables for Sample Location 011 (Switch)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    GOED Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
    Nevada Governor's Office of Economic Development
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Draft Groundwater Discharge Permit NS2000502, TRI-GID Wastewater Treatment Plant, 145 Britain Way, McCarran, Nevada
    Nevada Division of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Class I Air Quality Operating Permit to Construct AP7375-3672, Facility ID A1896, issued to Switch, Ltd.
    Nevada Division of Environmental Protection, Bureau of Air Pollution Control
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Director's Review and Preliminary Determination of Permit Issuance for Switch, Ltd., Storey County, Nevada
    Nevada Division of Environmental Protection, Bureau of Air Pollution Control
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Interim Finance Committee resolution approving the Storey County economic development financing proposal for the TMWRF-to-TRIC effluent pipeline
    Nevada Legislature, Interim Finance Committee
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Sparks City Council meeting May 8, 2017, General Business Item 9.4: TRI GID proposal for use of reclaimed water from the Truckee Meadows Water Reclamation Facility
    City of Sparks, Nevada
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
    Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)
    Tier 2 · Captured 2026-11-09 · Open the source
  9. 9
    The PUCN Connection newsletter, April 2026 edition
    Public Utilities Commission of Nevada
    Tier 1 · Captured 2026-11-08 · Open the source
  10. 10
    2026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
    NV Energy
    Tier 2 · Captured 2026-11-08 · Open the source
  11. 11
    2026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
    NV Energy
    Tier 1 · Captured 2026-11-09 · Open the source
  12. 12
    Storey County Board of County Commissioners minutes, July 21, 2026 (as published in the September 1, 2026 meeting packet)
    Storey County
    Tier 1 · Captured 2026-11-09 · Open the source
  13. 13
    Switch filings reveal diesel expansion before NDEP's listed dates (Nevada DEP air permit applications, facility A1896A, October 2026)
    W4 News (reporting on NDEP public filings)
    Tier 3 · Captured 2026-11-08 · Open the source
  14. 14
    Switch Citadel Campus (Tahoe Reno) - announced vs energized capacity ledger
    DEPLOY registry
    Tier 3 · Captured 2026-11-08 · Open the source
  15. 15
    First Solar, NV Energy and Switch Partner on New 100 Percent Green, Renewable Energy Program (July 14, 2015)
    NV Energy (company newsroom)
    Tier 4 · Captured 2026-11-09 · Open the source
  16. 16
    The Citadel Campus, Tahoe Reno (Switch locations page)
    Switch
    Tier 4 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page