Every public record we have for Switch Citadel Campus (TAHOE RENO)

Storey County, NevadaOperatingFirst public 2015Filing entity: Switch, Ltd.Last checked Nov 8, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

23 of 23 records

2026

  • Utility proceedingDecidedSep 3, 2026Public Utilities Commission of Nevada

    Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate

    Interim order (October 7, 2026) approving a gross-up of the CIAC rate for Sierra Pacific Power: new large loads, including data centers, reimburse NV Energy's tax cost on customer-funded construction contributions. The Q5 WG2 sweep recorded an interim gross-up rate of about 25.16 percent per testimony and a final gross-up rate of 23.6482 percent from secondary reporting of the order; the signed order's text was not opened in either sweep, so the rate figures are reported, not verified.

    26-09005

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.

  • Recorded voteJul 21, 2026Storey County Board of County Commissioners

    Approval of Special Use Permit 2026-018, natural gas fueled electrical generating facility at 2300 Peru Drive, McCarran (Fleet Data Centers)

    3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Item 17, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)

  • Recorded voteJul 21, 2026Storey County Board of County Commissioners

    Approval of the County Manager's letter of acknowledgment for Colovore Reno 1 LLC's GOED data center tax abatement application

    3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Item 25, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)

  • Recorded voteJul 21, 2026Storey County Board of County Commissioners

    Approval of Special Use Permit 2026-017, natural gas fueled electrical generating facility at 8990 USA Parkway, McCarran (Fleet Data Centers)

    3 yes. Clay Mitchell (Commissioner): yes; Donald Gilman (Commissioner): yes; Jay Carmona (Commissioner): yes.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Item 16, July 21, 2026 minutes (motion by Commissioner Mitchell, seconded by Commissioner Gilman; Aye 3, Nay 0, Abstain 0, Absent 0, Recused 0; Voted For: Mitchell-Clay, Gilman-Donald, Carmona-Jay)

  • Utility proceedingPending before the commissionMay 29, 2026Public Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    NV Energy seeks PUCN approval of its large-load service agreement with Amazon Data Services for the Storey County campus; a prehearing conference was set for July 14, 2026. Agreement terms are in the docket filing (not read this pass).

    26-05026

    Draft research, not yet verifiedLast checked Nov 11, 2026
    Where it says this

    PUCN docket information list, Docket 26-05026 caption and filing date 05/29/2026; PUCN Connection calendar (July 2026) lists the prehearing conference for July 14, 2026.

  • Utility proceedingPending before the commissionMay 6, 2026Public Utilities Commission of Nevada

    Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement

    The 2026 Joint IRP (filed May 6, 2026; 41 volumes) builds its large load planning framework on the Large Load Electric Service Agreement (LLESA), the standard agreement for customer loads of 25 MW or greater. Under the framework, large load additions pay for the infrastructure needed to serve them through customer-specific charges that operate as contributions in aid of construction toward generation and transmission additions, minimum demand and energy charges, security requirements, and termination payments; NV Energy plans on a Base Load Forecast and a reduced Base Minus forecast to isolate the costs that would not be incurred but for large load requests. The Commission's statutory decision deadline runs to December 2, 2026. Approval of the LLESA framework is requested in this docket; each signed LLESA is also filed in its own approval docket.

    26-05007

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Volume 1 (transmittal letter dated May 6, 2026; joint application for the 2027-2046 IRP) and Volume 2, Narrative (planning framework anchored by the LLESA; customer-specific charges as CIAC, minimum demand and energy charges, security requirements, termination payments; LLESA applies to loads of at least 25 MW; statutory resolution date December 2, 2026). Both volumes re-read firsthand in this pass.

  • Utility proceedingPending before the commissionMar 5, 2026Public Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests

    Companion Rule 9 (line extension) revisions to the LLESA framework, filed March 5, 2026: customer-specific charges for Rule 9 (contract-required) generation additions, return of unused contract-required generation amounts, and security requirements when the interconnection study begins. The proposed security is a letter of credit or cash equal to the greater of 50 percent of forecasted 24-month bills at full load or $10 million, with a readiness milestone schedule.

    26-03009

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.

2025

  • Public decisionUnder reviewDec 23, 2025Nevada Division of Environmental Protection, Bureau of Air Pollution Control

    Nevada Division of Environmental Protection, Bureau of Air Pollution Control, Director's Review and Preliminary Determination, revised Class I OPTC AP7375-3672 (FIN A1896A)

    Preliminary determination to issue the revised permit adding System 08 fire pump engines (S2.001, S2.002) and System 09 emergency generator (S2.003)

    Facility wide nox potential to emit:
    172.6 tons per year
    Units added by pending revision:
    S2.001 and S2.002: Clarke JU6H-UFADN0 emergency diesel fire pump engines, 197 hp each, year 2025; S2.003: Kohler/Rehlko 350REOZJC diesel emergency generator, 538 hp, year 2025
    Facility wide ghg potential to emit:
    22,951.6 tons per year CO2e
    Draft research, not yet verified
    Where it says this

    Director's Review dated December 23, 2025, pages 1-2 (project description and facility-wide potential-to-emit table)

  • Public decisionFiledMay 1, 2025Public Utilities Commission of Nevada

    Public Utilities Commission of Nevada, Docket No. 25-05001 (UEPA)

    Amended application of Switch Ltd. under UEPA for a permit to construct five 345 kV transmission lines totaling 11.90 miles, a substation, and associated facilities on private land in Storey County

    Draft research, not yet verified
    Where it says this

    PUCN docket information list, caption and filing date for Docket No. 25-05001, read firsthand 2026-11-09

2024

  • Utility proceedingDecidedMay 28, 2024Public Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers

    The Contract Tariff Template lets a large customer self-supply part of its load from third-party generation and storage while NV Energy balances and delivers it, under a 10-year minimum term (no more than 20 years). Approval came by stipulation: the Commission voted to accept the stipulation on March 11, 2025 (the stipulation was filed January 24, 2025 and signed by Regulatory Operations Staff, the Bureau of Consumer Protection, Microsoft, Google, and Switch). Tariff sheets filed April 16 and 18, 2025 state that the customer remains responsible for all costs and risks as if NV Energy supplied the full bundled requirement. The customer class overlaps NV Energy's data center load: Microsoft, Google, and Switch are parties, and the Rule 30 style Schedule CTT is the template the WECC peers cite.

    24-05022

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. CTT terms and the March 11, 2025 stipulation vote also per the Commission's April 2026 newsletter (Tariff Corner), staged as nv-pucn-newsletter-2026-04 and read firsthand by the Q5 WG2 sweep.

2023

  • Public decisionIssuedJan 17, 2023Nevada Governor's Office of Economic Development

    Nevada Governor's Office of Economic Development, Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)

    Approved employees:
    50 employees
    Approved average wage:
    $29 per hour
    Approved capital investment:
    $1.39 billion
    Audit capital investment:
    $1.8 million
    Audit capital investment:
    $179.9 million
    Audit jobs found:
    111 jobs
    Audit jobs found:
    22 jobs
    Approved personal property tax abatement:
    $4.9 million
    Approved sales use tax abatement:
    $75.7 million
    Approved sales use tax abatement:
    $7.6 million
    Approved average wage:
    $31 per hour
    Approved employees:
    10 employees
    Approved capital investment:
    $136.1 million
    Approved personal property tax abatement:
    $32.1 million
    Draft research, not yet verified
    Where it says this

    Report dated January 17, 2023: FY2016 approval tables for NRS 360.750 (row 4) and NRS 360.754 (row 1), and the FY2016 audit results table (rows 4 and 16)

2020

  • Public decisionFiledJan 21, 2020Public Utilities Commission of Nevada

    Public Utilities Commission of Nevada, Docket No. 20-01024 (UEPA)

    Application of CEI Switch Citadel OpCo, LLC under UEPA for a permit to construct the Citadel Solar Project: a 250 MW alternating current photovoltaic solar generating facility, two 120 kV generation-tie lines, and associated facilities, about 10 miles east of Reno in Storey County

    Draft research, not yet verified
    Where it says this

    PUCN docket information list, caption and filing date for Docket No. 20-01024, read firsthand 2026-11-09

2017

  • Public decisionFiledMay 8, 2017City of Sparks City Council

    City of Sparks City Council, General Business Item 9.4, meeting of May 8, 2017

    Consideration, discussion and potential direction on TRI GID's proposal to use up to 4,000 acre-feet of reclaimed water annually from the Truckee Meadows Water Reclamation Facility for the Tahoe Reno Industrial Center

    Proposed reclaimed water supply:
    4,000 acre_feet per year
    Draft research, not yet verified
    Where it says this

    Item 9.4 staff report, Agenda Item Brief and preliminary agreement terms

2016

  • Utility proceedingDecidedSep 30, 2016Public Utilities Commission of Nevada

    Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)

    The Commission's December 28, 2016 order approved a settlement of Switch's second 704B application. For the new Tahoe Reno load at issue for this campus, the settlement carried no impact fee, because Switch had given notice it would not take permanent service at that location; the staff agreement is dated December 8, 2016, and describes the Tahoe Reno operations at 6.2 million square feet.

    16-09023

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (caption and filing date, read firsthand 2026-11-09); AWEC Opening Comments in Oregon PUC Docket UM 2024, page 15 (approval through settlement) citing Docket No. 16-09023 Order (Dec. 28, 2016)

2015

  • Air permitIssuedDec 30, 2015Nevada Division of Environmental Protection, Bureau of Air Pollution Control

    Nevada Division of Environmental Protection, Bureau of Air Pollution Control, Class I Operating Permit to Construct AP7375-3672; Facility ID No. A1896

    Class I OPTC issued to Switch, Ltd. for the facility at 1 Superloop Circle, McCarran, NV 89434

    Facility location:
    Sections 10, 11, 13-16, 21-24, 26, 27, T 19 N, R 22 E, MDB&M; HA 83, Tracy Segment of Truckee River Basin, Storey County
    Physical address:
    1 Superloop Circle, McCarran, NV 89434
    System01 unit fuel cap:
    186 gallons per hour per unit
    Facility utm coordinates:
    UTM Zone 11, NAD 83: East 286,947 m, North 4,377,021 m
    System01 combined hours cap:
    7,879 hours per 12-month rolling period
    Backup generators:
    1 diesel-fired emergency generator (System 09, S2.003), Kohler/Rehlko model 350REOZJC Diesel, 538 hp, year 2025
    Draft research, not yet verified
    Where it says this

    Permit header and Part 1 (Facility ID No. A1896; Permit No. AP7375-3672; Issued to: Switch, Ltd.); Section VIII amendment history (new issuance December 30, 2015, Air Case 8482; revisions October 16, 2017, November 27, 2018, February 13, 2025)

  • Utility proceedingDecidedNov 30, 2015Public Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.

    Sierra Pacific, the NV Energy utility serving Storey County, sought Commission approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc. This is the record that grounds Sierra Pacific Power as the serving utility for the Citadel campus: the northern utility, not Nevada Power, contracted with Switch for renewable energy supply in the north.

    15-11025

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (caption and filing date, read firsthand 2026-11-09)

  • Tax agreementJul 2015Storey County

    Partial tax abatement for data centers (NRS 360.754)

    GOED's published approval (July 2015, FY2016 table) for Switch, LTD #2 in Storey County under the data center program: approved partial sales and use tax abatement of $75,720,025 over a 20-year sales and use term, and a personal property tax abatement of $32,095,728, against a stated capital investment of $1,386,677,024, 50 projected employees, and a $28.98 average wage. GOED's audit results: the 2-year audit (2017-12-31) and 5-year audit (2020-12-31) both found the company compliant; audit findings were 111 jobs, a $50.97 average wage, and $179,943,184 of capital investment. Data center abatement under NRS 360.754 as published in GOED's biennial report; the executed agreement was not retrieved, so no further conditions are stated.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    GOED Biennial Report FY2010-FY2022 (January 17, 2023): FY2016 approved NRS 360.754 table, row 1; FY2016 audit results table, Switch, LTD #2

  • Tax agreementJul 2015Storey County

    Partial tax abatement (NRS 360.750)

    GOED's published approval (July 2015, FY2016 table) for Switch, LTD #1 in Storey County: approved partial sales and use tax abatement of $7,621,000 and an approved partial 10-year personal property tax abatement of $4,943,500, against a stated capital investment of $136,089,982, 10 projected employees, and a $31.45 average wage. GOED's audit results: the 2-year audit (2017-07-08) and 5-year audit (2020-07-08) both found the company compliant; audit findings were 22 jobs, a $50.97 average wage, and $1,799,432 of capital investment. Standard NRS 360.750 approval as published in GOED's biennial report; the executed agreement was not retrieved, so no further conditions are stated.

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    GOED Biennial Report FY2010-FY2022 (January 17, 2023): FY2016 approved NRS 360.750 table, row 4; FY2016 audit results table, Switch, LTD #1

No date in the record(rules in force and undated records)

  • Water agreementUnder reviewNo date in the recordNevada Division of Environmental Protection

    Nevada Division of Environmental Protection, Groundwater Discharge Permit NS2000502 (TRI-GID Wastewater Treatment Plant)

    Draft permit and major modification for the TRI-GID wastewater treatment plant at 145 Britain Way, McCarran; treated effluent goes to a reservoir about 1.3 miles southeast for reclaimed use including cooling water at industrial center facilities

    Reclaimed water outfall:
    External Outfall 011 named SWITCH; reclaimed water from the TRI-GID reservoir is usable for irrigation, dust control, or cooling water at multiple facilities within the industrial center
    Reclaimed water flow terms:
    Monitor and report only: continuous meter, reported monthly, in million gallons per day; no numeric flow limit or volume is stated for Switch
    Draft research, not yet verified
    Where it says this

    Draft permit text: permit effective December 1, 2023, major modification effective November 1, 2026, expires November 30, 2028; outfall table entry '011 External Outfall SWITCH'; Re-use Discharge Limitations Tables for Sample Location 011 (Switch)

  • Public decisionApprovedNo date in the recordNevada Legislature, Interim Finance Committee

    Nevada Legislature, Interim Finance Committee, Resolution approving Storey County's economic development financing proposal (Storey County Resolution No. 18-501)

    Approves state general obligation bonds (NRS 360.991) to purchase Storey County special assessment bonds of not more than $35,000,000 for the pipeline carrying treated effluent from the Truckee Meadows Water Reclamation Facility to the Tahoe Reno Industrial Center, repaid by special assessments on the benefited parcels

    Special assessment bond cap:
    $35 million
    Draft research, not yet verified
    Where it says this

    Resolution text, recitals (Storey County Resolution No. 18-501 adopted August 7, 2018; Board of Economic Development approval August 14, 2018) and numbered financing terms 1-4

  • Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers

    Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.

    26-05028

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.

  • Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.

    26-05026

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.

  • Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)

    Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.

    26-05027

    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Land and zoning rules

    Zoning, setbacks, height limits, rezonings, development agreements. Usually held by: City or county planning department.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    GOED Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2022 (NRS 231.0685)
    Nevada Governor's Office of Economic Development
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Draft Groundwater Discharge Permit NS2000502, TRI-GID Wastewater Treatment Plant, 145 Britain Way, McCarran, Nevada
    Nevada Division of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Class I Air Quality Operating Permit to Construct AP7375-3672, Facility ID A1896, issued to Switch, Ltd.
    Nevada Division of Environmental Protection, Bureau of Air Pollution Control
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Director's Review and Preliminary Determination of Permit Issuance for Switch, Ltd., Storey County, Nevada
    Nevada Division of Environmental Protection, Bureau of Air Pollution Control
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Interim Finance Committee resolution approving the Storey County economic development financing proposal for the TMWRF-to-TRIC effluent pipeline
    Nevada Legislature, Interim Finance Committee
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Sparks City Council meeting May 8, 2017, General Business Item 9.4: TRI GID proposal for use of reclaimed water from the Truckee Meadows Water Reclamation Facility
    City of Sparks, Nevada
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
    Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)
    Tier 2 · Captured 2026-11-09 · Open the source
  9. 9
    The PUCN Connection newsletter, April 2026 edition
    Public Utilities Commission of Nevada
    Tier 1 · Captured 2026-11-08 · Open the source
  10. 10
    2026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
    NV Energy
    Tier 2 · Captured 2026-11-08 · Open the source
  11. 11
    2026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
    NV Energy
    Tier 1 · Captured 2026-11-09 · Open the source
  12. 12
    Storey County Board of County Commissioners minutes, July 21, 2026 (as published in the September 1, 2026 meeting packet)
    Storey County
    Tier 1 · Captured 2026-11-09 · Open the source
  13. 13
    Switch filings reveal diesel expansion before NDEP's listed dates (Nevada DEP air permit applications, facility A1896A, October 2026)
    W4 News (reporting on NDEP public filings)
    Tier 3 · Captured 2026-11-08 · Open the source
  14. 14
    Switch Citadel Campus (Tahoe Reno) - announced vs energized capacity ledger
    DEPLOY registry
    Tier 3 · Captured 2026-11-08 · Open the source
  15. 15
    First Solar, NV Energy and Switch Partner on New 100 Percent Green, Renewable Energy Program (July 14, 2015)
    NV Energy (company newsroom)
    Tier 4 · Captured 2026-11-09 · Open the source
  16. 16
    The Citadel Campus, Tahoe Reno (Switch locations page)
    Switch
    Tier 4 · Captured 2026-11-09 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page