Project File
Google data center campus, Project Mica (Kansas City)
Kansas City,Clay County,MissouriUnder constructionFirst public 2023Last checked Nov 10, 2026
Diode VenturesDeveloperGoogleDeveloper and operatorEvergyElectric utilityPort KCPublic partner
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Google data center campus, Project Mica (Kansas City) is a under-construction data center project in Kansas City, Clay County, Missouri. Google is named as operator. It was first public in 2023. It was announced at 700 MW.
Google data center campus, Project Mica (Kansas City) is an under-construction data center project in Kansas City, Clay County, Missouri. Google is named as operator. It was announced at 700 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Kansas City, Clay County, Missouri. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Google data center campus, Project Mica (Kansas City)Under construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Missouri SB 4: Utility law requiring large load customers to cover their costs
The act covers customers of an electrical corporation serving more than two hundred fifty thousand customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more; this project has 700 MW on record (not stated), but the project's projected annual peak demand and the customer count of its serving electrical corporation is not on record.
“Each electrical corporation providing electric service to more than two hundred fifty thousand customers shall develop and submit to the commission schedules to include in the electrical corporation's service tariff applicable to customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more. The schedules should reasonably ensure such customers' rates will reflect the customers' representative share of the costs incurred to serve the customers and prevent other customer classes' rates from reflecting any unjust or unreasonable costs arising from service to such customers.” (Section 393.130, subsection 7, TAFP text (p. 40))
Rule checks: Project is in Missouri; 700 MW on record (not stated), threshold 100 MW (Section 393.130, subsection 7, TAFP text (p. 40)). Still to check: who it covers: not checked
Bills and laws in Missouri
- HB 3369 · Died or failed · May 15, 2026One year ban on data center permits in St. Louis
- HB 3362 · Died or failed · May 15, 2026New rules for industrial utility customers
- HB 3390 · Died or failed · May 15, 2026State siting board for hyperscale data centers
- HB 2239 · Died or failed · May 15, 2026AI data center environmental accountability act
- HB 3364 · Died or failed · May 15, 2026New rules for industrial utility customers
- SB 4 · Signed into law · Apr 9, 2025Utility law requiring large load customers to cover their costs
Who's involved
- DeveloperDiode Ventures
- Developer and operatorGoogle
- Electric utilityEvergy
- Public partnerPort KC
Power
Capacity, as announced or filed
- 700 MW · Full build-outFeb 2026 · what the figure measures is not stated
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Port Authority of Kansas City, Missouri (Port KC)
- Stated in the filing
- 500 acres
- Stated in the filing
- 1,560,000 sq ft
- Stated in the filing
- $1.8 million
- Stated in the filing
- 25-year, 75% exemption on property taxes; 100% exemptions on local and state sales taxes for construction materials and equipment; up to $10 billion in taxable revenue bonds authorized
- Stated in the filing
- 700 MW
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Google data center campus, Project Mica (Kansas City)?
- Google data center campus, Project Mica (Kansas City) is a data center project in Kansas City, Clay County, Missouri.
- Who operates Google data center campus, Project Mica (Kansas City)?
- Google is named as the operator of Google data center campus, Project Mica (Kansas City).
- How big is Google data center campus, Project Mica (Kansas City)?
- Google data center campus, Project Mica (Kansas City) was announced at 700 MW of capacity. The site covers 500 acres.
- What stage is Google data center campus, Project Mica (Kansas City)?
- Google data center campus, Project Mica (Kansas City) is under construction. It was first public in 2023.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1
- 2Construction begins at Google's second data center campus in Kansas City, Missouri
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source