Project File

Vantage Lighthouse campus (Stargate Port Washington)

Port Washington,Ozaukee County,WisconsinUnder constructionFirst public 2025Filing entity: Vantage Data CentersLast checked Nov 8, 2026

Vantage Data CentersDeveloper and operatorWEC Energy GroupElectric utilityOracleEnd userOpenAIEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Vantage Lighthouse campus (Stargate Port Washington) is a under-construction data center project in Port Washington, Ozaukee County, Wisconsin. Vantage Data Centers is named as operator. It was first public in 2025. No site capacity figure is published for this project.

Vantage Lighthouse campus (Stargate Port Washington) is an under-construction data center project in Port Washington, Ozaukee County, Wisconsin. Vantage Data Centers is named as operator. No site capacity figure is published for this project. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Port Washington, Ozaukee County, Wisconsin. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Ozaukee County, Wisconsin.See every project on the map

The land, to scale

One football field
672 acres, about 508 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Vantage Lighthouse campus (Stargate Port Washington)Under construction

Bills and laws in Wisconsin

All 11 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 902 MW · Full campusDec 2025 · it_load

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Court cases and commission dockets

Questions people ask

Where is Vantage Lighthouse campus (Stargate Port Washington)?
Vantage Lighthouse campus (Stargate Port Washington) is a data center project in Port Washington, Ozaukee County, Wisconsin.
Who operates Vantage Lighthouse campus (Stargate Port Washington)?
Vantage Data Centers is named as the operator of Vantage Lighthouse campus (Stargate Port Washington).
How big is Vantage Lighthouse campus (Stargate Port Washington)?
The site covers 672 acres.
What stage is Vantage Lighthouse campus (Stargate Port Washington)?
Vantage Lighthouse campus (Stargate Port Washington) is under construction. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    PSC Overhauls We Energies' Data Center Tariff, Makes Improvements (press release)
    Public Service Commission of Wisconsin
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Final Decision, Docket 6630-TE-113 (Wisconsin Electric Power Company, Very Large Customer and Bespoke Resources Tariffs), PSC REF# 591873
    Public Service Commission of Wisconsin
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    OpenAI, Oracle, and Vantage plan Stargate Wisconsin data center, expected to be 'close to a gigawatt'
    DataCenterDynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  4. 4
    Vantage Breaks Ground on $15B Stargate Campus in Wisconsin
    Data Center Knowledge
    Tier 3 · Captured 2026-11-08 · Open the source