Skip to content

Project File

Chesapeake Data Campus

Charles County,MarylandAnnouncedFirst public 2026Filing entity: TeraWulf Inc.Last checked Nov 13, 2026

TeraWulfDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
  • Still to confirm: City or address
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Chesapeake Data Campus is an announced data center project in Charles County, Maryland. TeraWulf is named as developer. It was first public in 2026. It was announced at 1,000 MW.

Chesapeake Data Campus is an announced data center project in Charles County, Maryland. TeraWulf is named as developer. It was announced at 1,000 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Charles County, Maryland. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1,000 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Charles County, Maryland.See every project on the map

Timeline

  1. · New projectFirst public record of Chesapeake Data CampusAnnounced

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Maryland SB 116: Requires a state study of data center impacts

    The act covers data center development in Maryland, whose environmental, energy, and economic impacts state agencies must analyze; this project has 1,000 MW on record (not stated), but any project-level condition; the act directs state agencies to conduct a study and sets no size, date, or facility condition a project record could establish is not on record.

    “Requiring the Department of the Environment, the Maryland Energy Administration, and the University of Maryland School of Business, in coordination with the Department of Legislative Services, to conduct an analysis of the likely environmental, energy, and economic impacts of data center development in the State” (mgaleg SB 116 page, Synopsis)

    Rule checks: Project is in Maryland. Still to check: who it covers: not checked

Bills and laws in Maryland

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 1,000 MW · Full buildoutAug 2026 · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Chesapeake Data Campus?
    Chesapeake Data Campus is a data center project in Charles County, Maryland.
    Who is developing Chesapeake Data Campus?
    TeraWulf is named as the developer of Chesapeake Data Campus.
    How big is Chesapeake Data Campus?
    Chesapeake Data Campus was announced at 1,000 MW of capacity.
    What stage is Chesapeake Data Campus?
    Chesapeake Data Campus is announced. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      TeraWulf Reports Second Quarter 2026 Results
      TeraWulf Inc. (GlobeNewswire)
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Utility Bills, a $3 Billion Gap and Persistent Outmigration: What Is Driving Maryland's Statewide Races
      Maryland Bay News
      Tier 3 · Captured 2026-11-08 · Open the source
    3. 3
      EIA Form 861, Service Territory file, 2025 (final)
      U.S. Energy Information Administration
      Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page