city Card
Data centers in Las Vegas, Nevada
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Las Vegas, Nevada as of November 2026: 2 operating, 1 under construction and 1 expanding, totaling about 994 MW announced where a figure is published.
Las Vegas has 4 tracked data centers. Their announced capacity totals about 994 MW where a figure is published. Of those, 2 operating, 1 under construction and 1 expanding. Every figure comes from the public record linked on this page.
Data center projects in Las Vegas
- DataBank LAS1 (Las Vegas)
OperatingLas Vegas4 MW announced
- Switch Las Vegas AI factories (Jones Boulevard)
Under constructionLas Vegas
- Switch Las Vegas Core Campus
ExpandingLas Vegas495 MW announced
- Switch Switch LAS VEGAS (Las Vegas)
OperatingLas Vegas495 MW announced
Who serves this place
- Not collected yet.
More places in Clark County
Las Vegas is part of Clark County.
Nearby places
- North Las Vegas3 data center projects tracked
- Henderson1 data center project tracked
Court cases and commission dockets in Nevada (18)
Bills and laws in Nevada
- EO 2026-005 · In effect · Sep 18, 2026Sets state standards data centers must meet for tax abatements
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Las Vegas?
- Data Center Fact Check tracks 4 data center projects in Las Vegas as of November 2026. Of those, 2 operating, 1 under construction and 1 expanding.
- What is the biggest data center in Las Vegas?
- By announced capacity, the biggest data center in Las Vegas is Switch Las Vegas Core Campus, announced at 495 MW. It is expanding.
- How much power do data centers in Las Vegas use?
- The 4 projects tracked in Las Vegas have announced about 994 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Las Vegas." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-nv-las-vegas
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page