Skip to content

On-site generation

Every air permit in the public record for the data centers we track, project by project. Each permit states the backup generation that stands behind its site in its own terms: how many engines, of what kind, and sometimes the fleet's capacity in megawatts. The figures are printed exactly as the permit states them, with the permit named on the row.

Every data center runs on backup power, and the air permit is where the size of that backup becomes a public number: the permit names the engines that stand behind the site. We hold 237 air permits for 195 of the 1320 projects we track. 88 of those permits state how many generators stand behind the site, and 44 state the generator fleet's capacity in megawatts. This page lists every permit and prints each figure exactly as the permit states it. The figures are never added together: a project can hold several permits, and one fleet can be named under more than one of them. The other 1125 projects hold no air permit in any record we have found.

Meta Huntsville Data Center

Huntsville, Alabama · 2 air permits

  • City of Huntsville Natural Resources Division

    Status
    Under review
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • City of Huntsville Natural Resources Division

    Status
    Issued
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Microsoft San Jose data center (Alviso)

San Jose, California · 2 air permits

  • Bay Area Air Quality Management District, Air District Application #31953; Sources S-1 through S-140

    Status
    Issued · Decided April 3, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Bay Area Air Quality Management District, Air District Application 704043; 84 generators (document numbering: Sources S-7 through S-90)

    Status
    Issued · Decided August 18, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

EdgeConneX Denver Campus

Englewood, Colorado · 1 air permit

  • Colorado Department of Public Health and Environment, Air Pollution Control Division, 25DG0038 (Issuance 1)

    Status
    Issued · Decided February 23, 2026
    What the permit states
    Generators: 8 diesel-fueled internal combustion emergency engines (AIRS Point 001), MTU model 12V1600 DS550, design rating 822 horsepower eachGenerators: 1 diesel-fueled internal combustion emergency engine (AIRS Point 002), CAT model C18, design rating 900 horsepowerGenerators: 15 diesel-fueled internal combustion emergency engines with selective catalytic reduction controls (AIRS Point 004), CAT model 3516C, design rating 3,147 horsepower eachGenerators: 3 diesel-fueled internal combustion emergency engines (AIRS Point 003), CAT model 3516C, design rating 3,147 horsepower each

Microsoft FTY01 (Douglasville)

Douglasville, Georgia · 1 air permit

  • Georgia Environmental Protection Division, Air Protection Branch, Permit No. 7376-097-0097-S-01-0 (Application No. 28295; AIRS No. 04-13-097-00097)

    Status
    Issued · Decided October 13, 2022
    What the permit states
    Generator capacity: 60.5 MW

Google Council Bluffs data center campus

Council Bluffs, Iowa · 1 air permit

  • Iowa Department of Natural Resources, Air Quality Bureau, Title V Operating Permit 16-TV-002R1; Facility File (Plant) No. 78-01-121; EIQ No. 92-6982

    Status
    Issued · Decided September 7, 2021
    What the permit states
    Generators: 361 emergency diesel engines

Meta Altoona Data Center

Altoona, Iowa · 1 air permit

  • Iowa Department of Natural Resources, Air Quality Bureau, Title V Operating Permit 18-TV-007R1; Facility File No. 77-07-010; EIQ No. 92-6988

    Status
    Issued · Decided April 8, 2024
    What the permit states
    Generators: 112 emergency diesel generatorsGenerator capacity: 328 MW

Microsoft Project Ginger East (West Des Moines)

West Des Moines, Iowa · 1 air permit

  • Iowa Department of Natural Resources, 24-TV-005

    Status
    Issued · Decided December 9, 2024
    What the permit states
    Generators: 128 emergency diesel engines

Microsoft Project Ginger West (West Des Moines)

West Des Moines, Iowa · 1 air permit

  • Iowa Department of Natural Resources, 26-TV-003

    Status
    Issued · Decided April 10, 2026
    What the permit states
    Generators: 126 emergency diesel engines

Microsoft Project Osmium (West Des Moines)

West Des Moines, Iowa · 1 air permit

  • Iowa Department of Natural Resources, 24-TV-004

    Status
    Issued · Decided October 17, 2024
    What the permit states
    Generators: 104 emergency diesel engines

Meta Sarpy County Data Center

Springfield, Nebraska · 1 air permit

  • Nebraska Department of Environment and Energy, FID 108432

    Status
    Under review · Filed January 8, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Amazon Storey County Data Center (Peru Drive)

Sparks, Nevada · 1 air permit

  • Nevada Division of Environmental Protection, Bureau of Air Pollution Control, AP7374-4768 (FIN A2648)

    Status
    Under review
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Apple Reno data center

Sparks, Nevada · 1 air permit

  • Northern Nevada Public Health, Air Quality Management Division, AAIR16-0082

    Status
    Issued · Decided June 13, 2025
    What the permit states
    Generators: 40 enginesGenerator capacity: 137 MW

Colovore RNO01

Storey County, Nevada · 1 air permit

  • Nevada Division of Environmental Protection, Bureau of Air Pollution Control, AP7374-5002 (Facility ID A2675)

    Status
    Under review
    What the permit states
    Generators: 5 emergency standby generators (S2.001 through S2.005), Rolls-Royce Solutions America model 20V4000G94S, 3,490 kW each, manufactured 2024

EdgeCore Reno Campus

Storey County, Nevada · 1 air permit

  • Nevada Division of Environmental Protection, Bureau of Air Pollution Control, AP7374-4772 (FIN A2652)

    Status
    Under review
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Novva Tahoe Reno

Storey County, Nevada · 1 air permit

  • Nevada Division of Environmental Protection, Bureau of Air Pollution Control, AP7374-4667 (FIN A2569)

    Status
    Issued
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Switch Citadel Campus (TAHOE RENO)

Storey County, Nevada · 1 air permit

  • Nevada Division of Environmental Protection, Bureau of Air Pollution Control, Class I Operating Permit to Construct AP7375-3672; Facility ID No. A1896

    Status
    Issued · Decided December 30, 2015
    What the permit states
    Generators: 1 diesel-fired emergency generator (System 09, S2.003), Kohler/Rehlko model 350REOZJC Diesel, 538 hp, year 2025

Sentinel PN-DC1 South Brunswick

South Brunswick township, New Jersey · 1 air permit

  • New Jersey Department of Environmental Protection, Bureau of Stationary Sources, PCP250001 (Program Interest No. 19525)

    Status
    Under review · Filed August 20, 2026
    What the permit states
    Generators: 12 generatorsGenerator capacity: 43.44 MW

NTT Hillsboro data center campus

Hillsboro, Oregon · 2 air permits

  • Oregon Department of Environmental Quality, Northwest Region, Permit No. 34-0235-ST-01; Application No. 031135

    Status
    Expired · Filed January 29, 2020
    What the permit states
    Generators: 1 enginesGenerators: 44 enginesGenerator capacity: 144.5 MW
  • Oregon Department of Environmental Quality, Northwest Region, Addendum R-02 to Permit No. 34-0235-ST-01; Application No. 33100

    Status
    Expired · Decided May 13, 2021
    What the permit states
    This permit states no generator count or capacity in the record we hold.

QTS Hillsboro data center campus

Hillsboro, Oregon · 1 air permit

  • Oregon Department of Environmental Quality, Permit No. 34-0222-ST-01, Addendum No. 5 (Application No. 034858)

    Status
    Issued · Decided October 16, 2023
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Amazon data center campus (Falls Township)

Falls Township, Pennsylvania · 3 air permits

  • Pennsylvania Department of Environmental Protection, Plan Approval 09-0261

    Status
    Issued · Decided July 25, 2025
    What the permit states
    Generators: 72 diesel-fired critical emergency generator engines rated 2.75 MW each (CEG1 through CEG72)Generators: 4 diesel-fired house emergency generator engines (two at 1,000 kW and two at 750 kW)Generator capacity: 198 MW (72 engines at 2.75 MW each; backup generator capacity, not campus IT load)Generator capacity: 3.5 MW (2 x 1,000 kW plus 2 x 750 kW house emergency engines)
  • Pennsylvania Department of Environmental Protection, Minor Plan Approval Modification of 09-0261

    Status
    Issued · Decided November 24, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Pennsylvania Department of Environmental Protection, Proposed Plan Approval 09-0261A

    Status
    Under review · Filed April 2026
    What the permit states
    Generators: 280 natural gas-fired critical back-up generator engines rated 4,287 hp each (NGG1 through NGG280)Generators: 3 diesel-fired ancillary emergency generator engines (one 2,360 hp Tier 2, one 609 hp Tier 3, one 398 hp Tier 3)

CoreWeave data center (Lancaster)

Lancaster, Pennsylvania · 2 air permits

  • Pennsylvania Department of Environmental Protection, 36-05169A

    Status
    Issued · Decided December 29, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Pennsylvania Department of Environmental Protection, 36-05169B

    Status
    Under review · Filed June 22, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Homer City Energy Campus

Center Township, Pennsylvania · 2 air permits

  • Pennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office), 32-00457A

    Status
    Issued · Decided November 18, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Pennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office), 32-00055

    Status
    Issued · Decided March 14, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

xAI Colossus 2 (Memphis, Whitehaven)

Memphis, Tennessee · 1 air permit

  • Mississippi Department of Environmental Quality (Mississippi Environmental Quality Permit Board), PSD Permit to Construct No. 0680-00119 (Agency Interest No. 12592, PER20250001)

    Status
    Issued · Decided March 11, 2026
    What the permit states
    Generators: 8 ProEnergy 6000PE turbines at 50 MW eachGenerators: 41 simple-cycle natural gas turbinesGenerators: 17 Solar Titan PGM-130 turbines at 16.48 MW eachGenerators: 16 Solar Titan 350 turbines at 35 MW eachGenerator capacity: 1,240.16 MW

Crusoe Abilene AI factory campus for Microsoft

Abilene, Texas · 1 air permit

  • Texas Commission on Environmental Quality, 182126; PSDTX1688; GHGPSDTX263

    Status
    Under review · Decided August 5, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

CyrusOne Medina County campus (Sat14), near Castroville

Medina County, Texas · 1 air permit

  • Texas Commission on Environmental Quality, PBR Registration No. 184983; RN112507629; Project No. 413308

    Status
    Filed · Decided August 12, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

CyrusOne SAT1, San Antonio

San Antonio, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Permit No. O4793; RN102414737

    Status
    Issued · Decided March 11, 2026
    What the permit states
    Generators: 5 emergency critical generators (GRP-GENCRIT2: GEN A-2, GEN B-2, GEN C-2, GEN D-1, GEN D-2)Generators: 3 emergency critical generators (GRP-GENCRIT1: GEN A-1, GEN B-1, GEN C-1)Generators: 1 emergency house generator (GEN-HOUSE, ENG9-SAI)

CyrusOne SAT2-SAT4 campus, San Antonio

San Antonio, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Permit No. O4794; RN110660743

    Status
    Issued · Decided July 8, 2026
    What the permit states
    Generators: 1 emergency house generator at SATIV (GEN IV HOUSE, ENGH1 - SATIV)Generators: 1 emergency house generator at SATIII (GEN III HOUSE, ENGH1 - SATIII)Generators: 8 emergency critical generators at SATIV (GEN IV A1, A2, B1, B2, C1, C2, D1, D2)Generators: 1 emergency house generator at SATII (GEN II HOUSE, ENGH1 - SATII)Generators: 16 emergency critical generators at SATIII (GEN A01 through GEN D04)Generators: 8 emergency critical generators at SATII (GEN II A1, A2, B1, B2, C1, C2, D1, D2)

Google Goodnight campus (Armstrong County)

Claude, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Proposed Air Quality Permit Number 182880; PSD Permit PSDTX1698; GHG PSD Permit GHGPSDTX268

    Status
    Under review · Filed January 30, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Google Journey Data Center (Haskell County)

Haskell, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Permit by Rule Registration No. 182922; Project No. 404672; Regulated Entity RN112372271

    Status
    Filed · Filed February 5, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Google Midlothian data center

Midlothian, Texas · 2 air permits

  • Texas Commission on Environmental Quality, Federal Operating Permit (Title V) O4262; minor revision Project 38479; RN110495884

    Status
    Under review · Filed November 7, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Texas Commission on Environmental Quality, Permit by Rule Registration 153622 (30 TAC 106.511 and related rules); CN605692540, RN110495884

    Status
    Filed · Filed March 26, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Google Red Oak data center

Red Oak, Texas · 2 air permits

  • Texas Commission on Environmental Quality, Project 37459; Title V Permit O4709 application; RN110852753; CN605700061

    Status
    Filed · Decided January 24, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Texas Commission on Environmental Quality, Federal Operating Permit (Title V) O4709; RN110852753

    Status
    Issued · Decided March 27, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Lancium Clean Campus data centers (Crusoe)

Abilene, Texas · 3 air permits

  • Texas Commission on Environmental Quality, Standard Permit Registration No. 177263 (Project No. 387309)

    Status
    Approved · Decided January 22, 2025
    What the permit states
    Generator capacity: 360.5 MWGenerator capacity: 34.1 MW per GE LM2500 turbine (site-rated)Generator capacity: 38 MW per Titan 350 turbine (site-rated)
  • Texas Commission on Environmental Quality, Permit No. 182126 / PSDTX1688 / GHGPSDTX263

    Status
    Under review · Filed November 7, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Texas Commission on Environmental Quality, Permit No. 182126 / PSDTX1688 / GHGPSDTX263

    Status
    Under review · Decided August 5, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Meta Fort Worth Data Center

Fort Worth, Texas · 2 air permits

  • Texas Commission on Environmental Quality, Federal Operating Permit (Title V) O4280; RN108641507; CN604890723

    Status
    Issued · Decided August 4, 2021
    What the permit states
    This permit states no generator count or capacity in the record we hold.
  • Texas Commission on Environmental Quality, Title V renewal and revision application, Project 39681; Permit 4280

    Status
    Under review · Filed October 13, 2025
    What the permit states
    This permit states no generator count or capacity in the record we hold.

Microsoft San Antonio data centers

San Antonio, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Permit No. O4781

    Status
    Under review
    What the permit states
    Generators: 31 emergency enginesGenerators: 27 emergency enginesGenerators: 31 emergency engines

QTS Irving 1

Irving, Texas · 1 air permit

  • Texas Commission on Environmental Quality, O4771

    Status
    Under review
    What the permit states
    Generators: 4 diesel-fired house generators (DC3HSE, DC4HSE, DC5HSE, DC6HSE)Generators: 120 diesel-fired emergency generators (EGEN1 through EGEN120) at data center buildings DC1 through DC6

Vantage TX1 campus, San Antonio (TX11 and TX12)

San Antonio, Texas · 1 air permit

  • Texas Commission on Environmental Quality, Permit No. O4791; RN111852240

    Status
    Under review
    What the permit states
    Generators: 86 diesel emergency generators at full build-out

Meta Eagle Mountain Data Center

Eagle Mountain, Utah · 1 air permit

  • Utah Division of Air Quality, DAQE-NN163220001-26

    Status
    Under review · Filed August 30, 2026
    What the permit states
    This permit states no generator count or capacity in the record we hold.

How to read these figures

Each figure belongs to one permit, and a project can hold several permits: an original permit, an amendment, a renewal, a permit for one building among several. One fleet can be named under more than one permit for the same site. For both reasons the counts on this page are never added together, across permits or across projects.

A generator count prints with the permit's own words for what was counted: the engine type and fuel, and the rating of each unit where the permit states it, such as 2,750 ekW each. Those per-unit ratings are never multiplied by the count on this page. Where a permit states the fleet's capacity itself, in megawatts, that stated figure is printed as the capacity.

Generator capacity is not the data center's announced capacity. It states what the backup fleet can produce, not the load the building draws, and the two are never swapped: the ranking of projects by announced capacity leaves generator figures out.

Of the 237 permits listed, 88 state a generator count and 44 state a generator capacity; 146 state neither in the record we hold. 110 of the permits are entries on the Virginia Department of Environmental Quality's issued-permits index: the index names the site, the registration number, and the date, and publishes no per-permit document, and the department directs readers to its regional offices for individual permits. Those entries are marked on their rows, and there is no original document for us to read generator facts from.

A project with no permit here is a project whose air permit the public record we have found does not hold. Of the 1,320 projects we track, 195 hold at least one air permit.

The rest of the record for these projects

Backup power is one part of what a data center means for the place it lands in. Each project above has its own page, carrying the rest of its record from the same public sources: the jobs it committed to, the tax agreements it signed, and what officials and residents said about it. 24 of the 195 projects hold at least one tax agreement on record. 25 of them also carry an impact record covering property tax, tax breaks, electricity, water, jobs, community, neighbors, and voice.

This page sits under What it means for locals. The projects are ranked by the load they draw on largest projects by announced capacity, which leaves generator figures out on purpose. Grid load growth by state keeps the load figures utilities and grid operators state, measured water use keeps the water figures operators publish, and the record's rankings sit on lists from the record. Each project's own page lists its permits in full, with every fact they state.

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

    Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

    Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.

Questions people ask

How many backup generators does a data center have?
As many as the site is built to need, and the air permit is where the number becomes public. The largest single generator count a permit on this page states is 544 engine-generator sets, at QTS Richmond Data Center. Counts run from a single portable unit to fleets in the hundreds, and each count on this page is printed with the permit that states it.
Why do data centers keep so many generators?
The generators are the site's backup power. When the grid feed fails, the engines carry the building until power returns, so a large site permits a fleet rather than one machine: engines can be serviced in rotation, and the fleet covers the buildings in groups. The permits call them emergency generators, and they are permitted for that job, not for everyday power.
Is generator capacity the same as a data center's capacity?
No. Generator capacity states how much power the backup fleet can produce; announced capacity states the load the data center itself draws. The two measure different things, and this site never uses one for the other: the ranking of projects by announced capacity leaves generator figures out for exactly that reason. Where a permit states a fleet figure, it is printed here as the permit states it: the largest on this page is 1,240.16 MW, at xAI Colossus 2 (Memphis, Whitehaven). A capacity is never computed on this page by multiplying a generator count by a per-unit rating.
Why do so many permits state no generator count?
A permit appears here with the facts its document states, and many permits are written around emissions limits and run hours rather than the fleet itself: 146 of the 237 permits state neither a generator count nor a generator capacity in the record we hold. 110 of them are a different case: they are entries on the Virginia Department of Environmental Quality's issued-permits index, a table that names the site, the registration number, and the date but publishes no per-permit document. The department directs readers to its regional offices for individual permits, so there is no original document for us to read a generator count from. Those entries are marked on their rows.
Do the generators run all the time?
No. The permits class these engines as emergency generators: they run for testing and maintenance and when the grid feed fails. 9 of the permits on this page also state a cap on run hours in the record we hold, and each project's page prints the caps its permits state.

Sources

  1. 1
    Construction Permit 25DG0038 (Issuance 1), EdgeConneX, Inc., Denver Campus
    Colorado Department of Public Health and Environment
    Tier 1 · Open the source
  2. 2
    Air Quality Permit No. 7376-097-0097-S-01-0: Microsoft Corporation - FTY01 Facility, Douglasville, Douglas County
    Georgia Environmental Protection Division, Air Protection Branch
    Tier 1 · Open the source
  3. 3
    Title V Operating Permit 16-TV-002R1, Gable Corporation, 10420 Bunge Ave., Council Bluffs, IA 51503 (Iowa DNR Air Quality Bureau, issued September 7, 2021)
    Iowa Department of Natural Resources
    Tier 1 · Open the source
  4. 4
    Title V Operating Permit 18-TV-007R1, Siculus, Inc., 100 Share Way, Altoona, IA 50009 (Iowa DNR Air Quality Bureau)
    Iowa Department of Natural Resources
    Tier 1 · Open the source
  5. 5
    Iowa DNR Title V Operating Permit 24-TV-005, Willow Creek / Ginger East Data Centers (Microsoft), issued December 9, 2024
    Iowa Department of Natural Resources
    Tier 1 · Open the source
  6. 6
    Iowa DNR Title V Operating Permit 26-TV-003, Microsoft Ginger West Data Center, issued April 10, 2026
    Iowa Department of Natural Resources
    Tier 1 · Open the source
  7. 7
    Iowa DNR Title V Operating Permit 24-TV-004, Osmium Data Center (Microsoft), issued October 17, 2024
    Iowa Department of Natural Resources
    Tier 1 · Open the source
  8. 8
    Synthetic Minor Source Permit to Construct AAIR16-0082, Apple, Inc. (issued June 13, 2025)
    Northern Nevada Public Health, Air Quality Management Division
    Tier 1 · Open the source
  9. 9
    NDEP Class II Air Quality Operating Permit AP7374-5002, Colovore Reno 1 LLC (Facility ID A2675)
    Nevada Division of Environmental Protection
    Tier 1 · Open the source
  10. 10
    Class I Air Quality Operating Permit to Construct AP7375-3672, Facility ID A1896, issued to Switch, Ltd.
    Nevada Division of Environmental Protection, Bureau of Air Pollution Control
    Tier 1 · Open the source
  11. 11
    Draft Air Pollution Control Preconstruction Permit and Certificate to Operate, PN-DC 1, Permit Activity PCP250001, Program Interest 19525
    New Jersey Department of Environmental Protection, Bureau of Stationary Sources
    Tier 1 · Open the source
  12. 12
    Standard Air Contaminant Discharge Permit No. 34-0235-ST-01, NTT Global Data Centers HI, LLC, Hillsboro
    Oregon Department of Environmental Quality
    Tier 1 · Open the source
  13. 13
    Plan Approval 09-0261 (Phase 1), Amazon Data Services Inc, Falls Township
    Pennsylvania Department of Environmental Protection
    Tier 1 · Open the source
  14. 14
    Proposed Plan Approval 09-0261A (Phase 2)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Open the source
  15. 15
    Air Pollution Control Permit and Prevention of Significant Deterioration (PSD) Authority to Construct Air Emissions Equipment, Permit No. 0680-00119, MZX Tech LLC, issued March 11, 2026
    Mississippi Department of Environmental Quality
    Tier 1 · Open the source
  16. 16
    Response to Comments and Preliminary Determination, MZX Tech LLC, PSD Permit to Construct No. 0680-00119 (complete packet)
    Mississippi Department of Environmental Quality
    Tier 1 · Open the source
  17. 17
    Federal Operating Permit O4793, CyrusOne SAT1 (issued March 11, 2026)
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  18. 18
    Federal Operating Permit O4794, CyrusOne SAT2 SAT3 SAT4 (issued July 8, 2026)
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  19. 19
    Technical Review, Standard Permit Registration No. 177263 (Project No. 387309), Longhorn Data Center
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  20. 20
    Statement of Basis, Federal Operating Permit O4781, Microsoft SAT15 SAT16 SAT17
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  21. 21
    Statement of Basis, Federal Operating Permit O4771, QTS Irving (Quality Investment Properties Irving, LLC)
    Texas Commission on Environmental Quality
  22. 22
    Statement of Basis, Federal Operating Permit O4791, Vantage TX 11
    Texas Commission on Environmental Quality
    Tier 1 · Open the source

Back to What it means for locals

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "On-site generation." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/on-site-generation