Vantage TX1 campus, San Antonio (TX11 and TX12)

San Antonio,Bexar County,TexasUnder constructionFirst public 2023Filing entity: Vantage Data Centers TX1 LLCLast checked Nov 10, 2026

Vantage Data CentersDeveloper and operatorMicrosoftEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Vantage TX1 campus, San Antonio (TX11 and TX12) is a under-construction data center project in San Antonio, Bexar County, Texas. Vantage Data Centers is named as operator. It was first public in 2023. No site capacity figure is published for this project.

Vantage TX1 campus, San Antonio (TX11 and TX12) is an under-construction data center project in San Antonio, Bexar County, Texas. Vantage Data Centers is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in San Antonio, Bexar County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

3Public records we have found
86Backup generators, diesel emergency generators at full build-out
242,667Floor area, sq ft

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Vantage TX1 campus, San Antonio (TX11 and TX12) (Vantage Data Centers) in San Antonio, Bexar County, Texas, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Bexar County, Texas.See every project on the map

Timeline

  1. · FilingFiled with Texas Department of Licensing and Regulation for Vantage TX1 campus, San Antonio (TX11 and TX12)TABS2026001234
  2. · FilingFiled with Texas Department of Licensing and Regulation for Vantage TX1 campus, San Antonio (TX11 and TX12)TABS2024007561
  3. · New projectFirst public record of Vantage TX1 campus, San Antonio (TX11 and TX12)Under construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The standards must apply only to customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 96 MW on record (IT load), but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record.

    “The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))

    Rule checks: Project is in Texas; 96 MW on record (it load), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 32 MW · TX11 buildingDec 2023 · it_load
  • 96 MW · TX12 buildingSep 2025 · it_load

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Texas Department of Licensing and Regulation, TABS2026001234

    Floor area
    432,800 sq ft
    Stated in the filing
    $276.9 million
  • Texas Department of Licensing and Regulation, TABS2024007561

    Floor area
    242,667 sq ft
    Stated in the filing
    $95.8 million
  • Texas Commission on Environmental Quality, Permit No. O4791; RN111852240

    Backup generators
    86 diesel emergency generators at full build-out

Public records

3 records found so far. 7 kinds of record are still being collected.

See every record

Questions people ask

Where is Vantage TX1 campus, San Antonio (TX11 and TX12)?
Vantage TX1 campus, San Antonio (TX11 and TX12) is a data center project in San Antonio, Bexar County, Texas.
Who operates Vantage TX1 campus, San Antonio (TX11 and TX12)?
Vantage Data Centers is named as the operator of Vantage TX1 campus, San Antonio (TX11 and TX12).
What stage is Vantage TX1 campus, San Antonio (TX11 and TX12)?
Vantage TX1 campus, San Antonio (TX11 and TX12) is under construction. It was first public in 2023.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    TABS project record: VANTAGE DATA CENTER (TX12), 17420 Omicron Dr, San Antonio
    Texas Department of Licensing and Regulation
    Tier 1 · Captured 2026-11-10 · Open the source
  2. 2
    TABS project record: Data Center Building TX11 (14720 Omicron Dr, San Antonio)
    Texas Department of Licensing and Regulation
    Tier 1 · Captured 2026-11-10 · Open the source
  3. 3
    Statement of Basis, Federal Operating Permit O4791, Vantage TX 11
    Texas Commission on Environmental Quality
    Tier 1 · Captured 2026-11-10 · Open the source
  4. 4
    Draft Federal Operating Permit O4791, Vantage TX 11 (issuance date blank as published)
    Texas Commission on Environmental Quality
    Tier 1 · Captured 2026-11-10 · Open the source
  5. 5
    Data Centers in Texas: lists of all registered Qualifying Data Centers and Qualifying Large Data Center Projects
    Texas Comptroller of Public Accounts
    Tier 1 · Captured 2026-11-09 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page