Lancaster,Lancaster County,PennsylvaniaUnder constructionFirst public 2025Filing entity: Greenfield Road Owner, LLCLast checked Nov 9, 2026

Machine Investment GroupDeveloperChirisa Technology ParksDeveloperCoreWeaveEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

CoreWeave data center (Lancaster) is a under-construction data center project in Lancaster, Lancaster County, Pennsylvania. Machine Investment Group is named as developer. It was first public in 2025. It was announced at 100 MW.

CoreWeave data center (Lancaster) is an under-construction data center project in Lancaster, Lancaster County, Pennsylvania. Machine Investment Group is named as developer. It was announced at 100 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Lancaster, Lancaster County, Pennsylvania. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

CoreWeave Lancaster video · 2 min 19 sec

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

100 MWAnnounced capacity
7Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Aerial view of CoreWeave data center (Lancaster) (Machine Investment Group) in Lancaster, Lancaster County, Pennsylvania, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Lancaster County, Pennsylvania.See every project on the map

Timeline

  1. · DecisionCity of Lancaster (City Council): Adopted for CoreWeave data center (Lancaster)Ordinance No. 07-2026 (Administration Bill No. 10-2025)
  2. · FilingFiled with Pennsylvania Department of Environmental Protection: air permit for CoreWeave data center (Lancaster)36-05169B
  3. · DecisionPennsylvania Department of Environmental Protection: Issued (air permit) for CoreWeave data center (Lancaster)36-05169A
  4. · FilingFiled with City of Lancaster (City Council) for CoreWeave data center (Lancaster)Ordinance No. 07-2026 (Administration Bill No. 10-2025)
  5. · FilingFiled with Pennsylvania Department of Environmental Protection: air permit for CoreWeave data center (Lancaster)36-05169A
  6. · DecisionCity of Lancaster (Zoning Officer): Advisory opinions: development of the Lancaster AI Hub is a permitted use under the existing Zoning Ordinance for CoreWeave data center (Lancaster)
  7. · FilingFiled with City of Lancaster (Zoning Officer) for CoreWeave data center (Lancaster)
  8. · New projectFirst public record of CoreWeave data center (Lancaster)Under construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 1834: Regulates commercial data centers and their energy use

    The act covers commercial data centers in Pennsylvania, facilities used for processing, storing, retrieving, or transmitting data with a peak demand of 25 megawatts or greater that are interconnected to a public utility; this project has 100 MW announced on record, but the project's peak demand is not on record.

    “A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following: (1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data. (2) Has a peak demand of 25 megawatts or greater. (3) Is interconnected to a public utility at a single point of interconnection or multiple points of interconnection or is interconnected to multiple public utilities within this Commonwealth through multiple points of interconnection.” (Section 2, definition of commercial data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 2650: Requires state certification for data center tax benefits

    The act covers computer data centers in Pennsylvania, facilities predominantly used to house working servers or similar data storage systems, when an owner or operator seeks GRID certification and its tax benefits; this project has 100 MW announced on record, but whether its owner or operator has applied for or holds GRID certification is not on record.

    “All or part of a facility that may be composed of one or more businesses, owners or tenants, that is or will be predominantly used to house working servers or similar data storage systems and that may have uninterruptible energy supply or generator backup power, or both closed-loop cooling systems, towers and other temperature control infrastructure.” (Section 2902-D.1, definition of computer data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

Bills and laws in Pennsylvania

All 12 in Bill Watch

Who's involved

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Pennsylvania Department of Environmental Protection, 36-05169A

    Stated in the filing
    82.75 tons per year (potential emissions, both phases as approved)
    Stated in the filing
    176 diesel-fired emergency generators (facility total, both phases)
    Stated in the filing
    104 Rolls Royce model 4P9.1-2700 generators at 3,250 kW each (Building #2)
    Stated in the filing
    572 MW (computed: 176 generators at 3.25 MW each)
    Stated in the filing
    72 Rolls Royce model 4P9.1-2700 generators at 3,250 kW each (Building #1)
    Stated in the filing
    100 hours per year per engine, including emergency and non-emergency use
  • Pennsylvania Department of Environmental Protection, 36-05169B

    Stated in the filing
    99.03 tons per year (potential emissions, both phases with Phase 2 as modified in 36-05169B)
    Stated in the filing
    84 Caterpillar Model C175-20 generators at 3,500 ekW each (Phase 2 as proposed)
    Stated in the filing
    156 diesel-fired emergency generators (facility total with Phase 2 as proposed: 72 under 36-05169A plus 84)
  • City of Lancaster

    Stated in the filing
    1,000,000 square feet (DC Building, Lancaster AI Hub West, targeted construction start November 2026)
    Stated in the filing
    400,000 square feet (initial DC Building, Lancaster AI Hub East, targeted construction start January 2026)
    Stated in the filing
    $10 million total Section 8.1 contributions to the Lancaster County Community Foundation: $2,500,000 at construction financing and $2,500,000 within 30 days of operations, for each of LPE Unit 1 and LPE Unit 2
    Stated in the filing
    $20 million letter of credit, or a corporate guarantee from an entity with net worth of $100 million or more, securing the Article 8 contribution obligations
    Stated in the filing
    $250,000 contribution to the Lancaster County Community Foundation within 30 days of the Effective Date, for the strategic planning process; credited against Section 8.1.1
    Stated in the filing
    20,000 gallons per day at either Campus (covenant maximum on municipal water use)
    Stated in the filing
    3 DC Buildings across the two campuses
    Stated in the filing
    75 acres per campus (approximate, as recited)
    Stated in the filing
    $10 million letter of credit for the Contingent Clean Energy Fund, delivered for the first DC Building; reduced $2,500,000 per DC Building that commences operations in compliance with Section 3.3.2, floor $5,000,000 until all three buildings comply
    Stated in the filing
    650,000 square feet (second DC Building, Lancaster AI Hub East, targeted construction start August 2026)
    Stated in the filing
    150 people per Campus (expected employment to operate the facilities, as recited)
    Stated in the filing
    $10 million total Section 8.2 contributions to the City’s Sustainable Development and Clean Energy Fund: $2,500,000 at construction financing and $2,500,000 within 30 days of operations, for each of LPE Unit 1 and LPE Unit 2

Public records

7 records found so far. 5 kinds of record are still being collected.

See every record

Questions people ask

Where is CoreWeave data center (Lancaster)?
CoreWeave data center (Lancaster) is a data center project in Lancaster, Lancaster County, Pennsylvania.
Who is developing CoreWeave data center (Lancaster)?
Machine Investment Group is named as the developer of CoreWeave data center (Lancaster).
How big is CoreWeave data center (Lancaster)?
CoreWeave data center (Lancaster) was announced at 100 MW of capacity.
What stage is CoreWeave data center (Lancaster)?
CoreWeave data center (Lancaster) is under construction. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Plan Approval 36-05169A, Greenfield Rd Owner LLC/Lancaster (issued December 29, 2025)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Pennsylvania Bulletin, Vol. 56, No. 3 (January 17, 2026)
    Commonwealth of Pennsylvania
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Community Benefits Agreement (executed November 2025): LPE 01 Propco LLC, Greenfield Road Owner, LLC, Harrisburg Place Owner, LLC, and the City of Lancaster
    City of Lancaster, PA
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Data Center Frequently Asked Questions
    City of Lancaster, PA
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Pennsylvania Bulletin, Vol. 56, No. 39 (September 26, 2026)
    Commonwealth of Pennsylvania
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Administrative Ordinance No. 07-2026 (Administration Bill No. 10-2025): Amending Chapter 300 of the Code of the City of Lancaster to regulate data centers
    City of Lancaster, PA
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Data Center Community Benefits Agreement
    City of Lancaster, PA
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    PUC docket page, P-2026-3065185 (PPL Customer Protection Transmission Rider petition)
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source
  9. 9
    RESA Prehearing Memorandum, P-2026-3065185
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  10. 10
    PUC docket page, C-2026-3065756 (Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation)
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  11. 11
    PPLICA Petition to Intervene, C-2026-3065756
    Pennsylvania Public Utility Commission
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  12. 12
    CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania
    CoreWeave, Inc. (via Business Wire)
    Tier 4 · Captured 2026-11-08 · Open the source
  13. 13
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page