2026
Utility proceedingPending before the commissionOct 2, 2026Pennsylvania Public Utility Commission
Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation (formal complaint on large load and data center costs)
The Office of Consumer Advocate alleges existing customers are paying new and higher costs caused by data center additions on PPL’s system and in PJM, and are receiving service frequently interrupted or curtailed because of data center interconnection. It says Rate Schedule LP-6 does not protect enough and asks the Commission to make its model tariff guidelines mandatory for PPL: mandatory interruptible rates for data centers; pre-emergency and emergency load shed plans; classification of computational loads as critical or non-critical; affordability protections including ongoing contributions to the Universal Service Program; classification by end use (computational load) instead of only by connection above 69 kV; binding generator commitments or matching capacity from computational customers; a battery storage network for peaks; a definition of but-for costs for transmission and distribution upgrades; and a test of whether capacity and transmission rate design, including Reliability Backstop Procurement and Interim Resource Adequacy Service costs, protects other customers. The model tariff threshold is 50 MW for a single load or 100 MW in aggregate. Governor Shapiro intervened on October 16, 2026; Amazon Data Services and the Data Center Coalition intervened on November 3, 2026.
C-2026-3065756
Draft research, not yet verifiedLast checked Nov 11, 2026Where it says this
PUC docket page, Case Summary (docket, Active, Date Filed 10/2/2026) and Daily Actions, 11/10/2026 (consolidated Scheduling Order); PPLICA Petition to Intervene, filed 2026-10-22, complaint summary at pages 1-2 and relief at pages 3-4 and 77-79
Utility proceedingPending before the commissionSep 14, 2026Pennsylvania Public Utility Commission
Petition of PPL Electric Utilities Corporation for Approval of Its Non-Bypassable Customer Protection Transmission Rider, Elimination of Its Transmission Service Charge, Changes to Its Generation Supply Charges, Changes to Its Retail Tariff, and Changes to Its Electric Generation Supplier Coordination Tariff
PPL proposes a non-bypassable Customer Protection Transmission Rider recovering NITS and certain other transmission costs, elimination of its Transmission Service Charge, and moving the remaining transmission costs into Generation Supply Charges. Certain network upgrade costs are allocated to Rate LP-6 large load customers, and the petition creates a mechanism for future Reliability Backstop Procurement and Interim Resource Adequacy Service charges or credits ultimately assigned to PPL and properly attributable to LP-6 customers. It changes how transmission costs are allocated, recovered and billed for shopping and default service customers.
P-2026-3065185
Draft research, not yet verifiedLast checked Nov 11, 2026Where it says this
PUC docket page, Case Summary (Date Filed 9/14/2026, full case description) and Daily Actions, 11/10/2026 (consolidated Scheduling Order); RESA Prehearing Memorandum, 2026-10-30, Section I Background
Public decisionApprovedJul 14, 2026City of Lancaster (City Council)
City of Lancaster (City Council), Ordinance No. 07-2026 (Administration Bill No. 10-2025)
Adopted
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Ordinance No. 07-2026: caption (introduced October 14, 2025; adopted by Council July 14, 2026); Section 6.B (pending applications); Section 7 (effective 20 days after adoption)
Air permitUnder reviewJun 22, 2026Pennsylvania Department of Environmental Protection
Pennsylvania Department of Environmental Protection, 36-05169B
- Potential emissions nox:
- 99.03 tons per year (potential emissions, both phases with Phase 2 as modified in 36-05169B)
- Phase 2 emergency generators proposed:
- 84 Caterpillar Model C175-20 generators at 3,500 ekW each (Phase 2 as proposed)
- Emergency generators proposed total:
- 156 diesel-fired emergency generators (facility total with Phase 2 as proposed: 72 under 36-05169A plus 84)
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Pennsylvania Bulletin, Vol. 56, No. 39 (September 26, 2026), pp. 6399-6400, Southcentral Region notice of intent to issue Plan Approval 36-05169B
2025
Air permitIssuedDec 29, 2025Pennsylvania Department of Environmental Protection
Pennsylvania Department of Environmental Protection, 36-05169A
Issued
- Potential emissions nox:
- 82.75 tons per year (potential emissions, both phases as approved)
- Emergency generators:
- 176 diesel-fired emergency generators (facility total, both phases)
- Phase 2 emergency generators:
- 104 Rolls Royce model 4P9.1-2700 generators at 3,250 kW each (Building #2)
- Emergency generator capacity:
- 572 MW (computed: 176 generators at 3.25 MW each)
- Phase 1 emergency generators:
- 72 Rolls Royce model 4P9.1-2700 generators at 3,250 kW each (Building #1)
- Generator operating limit:
- 100 hours per year per engine, including emergency and non-emergency use
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Plan Approval 36-05169A, cover page and Plan Approval Description (p. 31 of the issued document); Pennsylvania Bulletin, Vol. 56, No. 3, p. 420 (application received May 14, 2025; issued December 29, 2025)
Public decisionIssuedFeb 18, 2025City of Lancaster (Zoning Officer)
City of Lancaster (Zoning Officer)
Advisory opinions: development of the Lancaster AI Hub is a permitted use under the existing Zoning Ordinance
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Executed CBA, Section 12.1 (two separate advisory opinions issued on or about February 18, 2025); City FAQ, Zoning section (a data center use deemed consistent with the Suburban Manufacturing district)
No date in the record(rules in force and undated records)
Development agreementApprovedNo date in the recordCity of Lancaster
City of Lancaster
Executed: Community Benefits Agreement among LPE 01 Propco LLC, Greenfield Road Owner, LLC, Harrisburg Place Owner, LLC, and the City of Lancaster
- Building floor area:
- 1,000,000 square feet (DC Building, Lancaster AI Hub West, targeted construction start November 2026)
- Building floor area:
- 400,000 square feet (initial DC Building, Lancaster AI Hub East, targeted construction start January 2026)
- Community foundation contribution:
- $10 million total Section 8.1 contributions to the Lancaster County Community Foundation: $2,500,000 at construction financing and $2,500,000 within 30 days of operations, for each of LPE Unit 1 and LPE Unit 2
- Article 8 letter of credit:
- $20 million letter of credit, or a corporate guarantee from an entity with net worth of $100 million or more, securing the Article 8 contribution obligations
- Planning contribution:
- $250,000 contribution to the Lancaster County Community Foundation within 30 days of the Effective Date, for the strategic planning process; credited against Section 8.1.1
- Municipal water cap:
- 20,000 gallons per day at either Campus (covenant maximum on municipal water use)
- Data center buildings:
- 3 DC Buildings across the two campuses
- Campus acres:
- 75 acres per campus (approximate, as recited)
- Contingent clean energy letter of credit:
- $10 million letter of credit for the Contingent Clean Energy Fund, delivered for the first DC Building; reduced $2,500,000 per DC Building that commences operations in compliance with Section 3.3.2, floor $5,000,000 until all three buildings comply
- Building floor area:
- 650,000 square feet (second DC Building, Lancaster AI Hub East, targeted construction start August 2026)
- Expected jobs:
- 150 people per Campus (expected employment to operate the facilities, as recited)
- Clean energy fund contribution:
- $10 million total Section 8.2 contributions to the City’s Sustainable Development and Clean Energy Fund: $2,500,000 at construction financing and $2,500,000 within 30 days of operations, for each of LPE Unit 1 and LPE Unit 2
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Executed CBA: Preamble and Background (parties, campuses, buildings); Article 3 (performance commitments); Article 8 (financial contributions); Section 10.1 (20-year term); Section 12.1 (zoning opinions)
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Tax breaks and payments
Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Plan Approval 36-05169A, Greenfield Rd Owner LLC/Lancaster (issued December 29, 2025)
Pennsylvania Department of Environmental ProtectionTier 1 · Captured 2026-11-09 · Open the source - 2Pennsylvania Bulletin, Vol. 56, No. 3 (January 17, 2026)
Commonwealth of PennsylvaniaTier 1 · Captured 2026-11-09 · Open the source - 3Community Benefits Agreement (executed November 2025): LPE 01 Propco LLC, Greenfield Road Owner, LLC, Harrisburg Place Owner, LLC, and the City of Lancaster
City of Lancaster, PATier 1 · Captured 2026-11-09 · Open the source - 4Data Center Frequently Asked Questions
City of Lancaster, PATier 1 · Captured 2026-11-09 · Open the source - 5Pennsylvania Bulletin, Vol. 56, No. 39 (September 26, 2026)
Commonwealth of PennsylvaniaTier 1 · Captured 2026-11-09 · Open the source - 6Administrative Ordinance No. 07-2026 (Administration Bill No. 10-2025): Amending Chapter 300 of the Code of the City of Lancaster to regulate data centers
City of Lancaster, PATier 1 · Captured 2026-11-09 · Open the source - 7Data Center Community Benefits Agreement
City of Lancaster, PATier 1 · Captured 2026-11-09 · Open the source - 8PUC docket page, P-2026-3065185 (PPL Customer Protection Transmission Rider petition)
Pennsylvania Public Utility CommissionTier 1 · Captured 2026-11-11 · Open the source - 9RESA Prehearing Memorandum, P-2026-3065185
Pennsylvania Public Utility CommissionTier 1 · Captured 2026-11-11 · Open the source · Archived copy - 10PUC docket page, C-2026-3065756 (Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation)
Pennsylvania Public Utility CommissionTier 1 · Captured 2026-11-11 · Open the source · Archived copy - 11PPLICA Petition to Intervene, C-2026-3065756
Pennsylvania Public Utility CommissionTier 1 · Captured 2026-11-11 · Open the source · Archived copy - 12CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania
CoreWeave, Inc. (via Business Wire)Tier 4 · Captured 2026-11-08 · Open the source - 13U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page