Project File

Homer City Energy Campus

Center Township,Indiana County,PennsylvaniaUnder constructionFirst public 2025Filing entity: Homer City Generation LPLast checked Nov 9, 2026

Homer City RedevelopmentDeveloperKiewitBuilder

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Homer City Energy Campus is a under-construction data center project in Center Township, Indiana County, Pennsylvania. Homer City Redevelopment is named as developer. It was first public in 2025. No site capacity figure is published for this project.

Homer City Energy Campus is an under-construction data center project in Center Township, Indiana County, Pennsylvania. Homer City Redevelopment is named as developer. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Center Township, Indiana County, Pennsylvania. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

7Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Homer City Energy Campus (Homer City Redevelopment) in Center Township, Indiana County, Pennsylvania, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Indiana County, Pennsylvania.See every project on the map

The land, to scale

One football field
3,200 acres, about 2,420 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · FilingFiled with Pennsylvania Department of Environmental Protection (Clean Water Program, Northwest Regional Office): water agreement for Homer City Energy CampusPA0005037
  2. · DecisionPennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office): Title V Operating Permit modified and renewed: memorializes the cessation of coal-fired generation as of June 30, 2023, removes the retired coal sources, enters the emission reduction credits gen...32-00055
  3. · DecisionPennsylvania Department of Environmental Protection (Waterways and Wetlands Program, Northwest Regional Office): Issued: authorizes temporary impact to 0.86 acre of PEM wetland, permanent impact to 1.6 acres of PEM/PFO wetlands and impact to 162.35 linear feet of an unnamed tributary to Cherry Ru...E3206225-004
  4. · Court caseCourt case filed: Katherine McIntosh et al. v. Commonwealth of Pennsylvania, Department of Environmental Protection; Homer City Generation, LP, permitteePennsylvania Environmental Hearing Board
  5. · Court caseCourt case filed: Clean Air Council, Citizens for Pennsylvania's Future, and Sierra Club v. Commonwealth of Pennsylvania, Department of Environmental Protection; Homer City Generation, LP, permitteePennsylvania Environmental Hearing Board
  6. · DecisionPennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office): Issued: authorizes Homer City Generation LP to construct and initially operate a new natural gas-fired generating station at the former Homer City Generating Station: seven GE Vernova 7HA.02 comb...32-00457A
  7. · FilingFiled with Pennsylvania Department of Environmental Protection (Waterways and Wetlands Program, Northwest Regional Office): wetland permit for Homer City Energy CampusE3206225-004
  8. · FilingFiled with Pennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office): air permit for Homer City Energy Campus32-00457A
All 9 events for this project

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 1834: Regulates commercial data centers and their energy use

    The act covers commercial data centers in Pennsylvania, facilities used for processing, storing, retrieving, or transmitting data with a peak demand of 25 megawatts or greater that are interconnected to a public utility; this project is a under_construction data center in Indiana County on record, but the project's peak demand is not on record.

    “A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following: (1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data. (2) Has a peak demand of 25 megawatts or greater. (3) Is interconnected to a public utility at a single point of interconnection or multiple points of interconnection or is interconnected to multiple public utilities within this Commonwealth through multiple points of interconnection.” (Section 2, definition of commercial data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 2650: Requires state certification for data center tax benefits

    The act covers computer data centers in Pennsylvania, facilities predominantly used to house working servers or similar data storage systems, when an owner or operator seeks GRID certification and its tax benefits; this project is a under_construction data center in Indiana County on record, but whether its owner or operator has applied for or holds GRID certification is not on record.

    “All or part of a facility that may be composed of one or more businesses, owners or tenants, that is or will be predominantly used to house working servers or similar data storage systems and that may have uninterruptible energy supply or generator backup power, or both closed-loop cooling systems, towers and other temperature control infrastructure.” (Section 2902-D.1, definition of computer data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

Bills and laws in Pennsylvania

All 12 in Bill Watch

Who's involved

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Pennsylvania Department of Environmental Protection (Waterways and Wetlands Program, Northwest Regional Office), E3206225-004

    Stated in the filing
    0.86 acres
    Stated in the filing
    1.6 acres
    Stated in the filing
    162.35 linear feet
  • Pennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office), 32-00457A

    Stated in the filing
    7 turbines
    Stated in the filing
    -889 tpy
    Stated in the filing
    $50,000
    Stated in the filing
    369.035 tons
    Stated in the filing
    10 turbines
    Stated in the filing
    141.04 tpy per turbine
    Stated in the filing
    -2,991.7 tpy
    Stated in the filing
    13.3 tpy per turbine
  • Pennsylvania Department of Environmental Protection (Air Quality Program, Northwest Regional Office), 32-00055

    Stated in the filing
    220.1 tpy
    Stated in the filing
    11.3 tpy
    Stated in the filing
    2,031.8 tpy

Public records

7 records found so far. 5 kinds of record are still being collected.

See every record

Questions people ask

Where is Homer City Energy Campus?
Homer City Energy Campus is a data center project in Center Township, Indiana County, Pennsylvania.
Who is developing Homer City Energy Campus?
Homer City Redevelopment is named as the developer of Homer City Energy Campus.
How big is Homer City Energy Campus?
The site covers 3,200 acres.
What stage is Homer City Energy Campus?
Homer City Energy Campus is under construction. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Chapter 105 Water Obstruction and Encroachment Permit and Section 401 Water Quality Certification, E3206225-004, Homer City Generation LP
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Permit Review Summary, Homer City Generation LP, E3206225-004 (application received October 31, 2025; review completed March 2026)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Homer City Generating Station NPDES Permit Renewal Application, Permit No. PA0005037 (May 2026)
    Pennsylvania Department of Environmental Protection (filed application; prepared by GAI Consultants for Homer City Generation LP)
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Technical Review Memo, Plan Approval No. 32-00457A, Homer City Generation LP
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-08 · Open the source
  5. 5
    Summary of Air Quality Analyses for Prevention of Significant Deterioration, Homer City Generation, L.P., Application for Plan Approval 32-00457A (November 17, 2025)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Plan Approval No. 32-00457A, Homer City Generation LP, Comment Response Document (November 18, 2025)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Pennsylvania Bulletin, 56 Pa.B. 1440 (March 14, 2026): Actions on Applications, Title V Operating Permit 32-00055, Homer City Generation LP Station, modification and renewal
    Pennsylvania Bulletin (Legislative Reference Bureau)
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Motion for Consolidation, Homer City Generation, LP, EHB Docket No. 2025-136-B (filed February 26, 2026)
    Pennsylvania Environmental Hearing Board (filing by permittee Homer City Generation, LP; republished copy hosted by Our Children's Trust)
    Tier 4 · Captured 2026-11-09 · Open the source
  9. 9
    Pennsylvania case page: Katherine McIntosh et al. v. Commonwealth of Pennsylvania (Homer City Generation Project appeal)
    Our Children's Trust (appellants' counsel)
    Tier 4 · Captured 2026-11-09 · Open the source
  10. 10
    Notice of Appeal, Clean Air Council, Citizens for Pennsylvania's Future and Sierra Club v. Department of Environmental Protection; Homer City Generation, LP, permittee (appeal of Plan Approval No. 32-00457A)
    Pennsylvania Environmental Hearing Board (filing; republished copy hosted by appellant Citizens for Pennsylvania's Future)
    Tier 4 · Captured 2026-11-09 · Open the source
  11. 11
    Environmental and community groups appeal DEP approval of Homer City gas plant air permit (December 18, 2025)
    Clean Air Council (appellant)
    Tier 4 · Captured 2026-11-09 · Open the source
  12. 12
    Commissioners' Meeting Minutes, Indiana County (PIT100 Masterplan item)
    Indiana County Board of Commissioners
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    Homer City Redevelopment and Kiewit announce country's largest natural gas-powered data center campus to support AI and HPC demand
    Homer City Redevelopment / Kiewit Power Constructors (release carried on GE Vernova newsroom)