QTS Irving 1

Irving,Dallas County,TexasExpandingLast checked Nov 12, 2026

QTSDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

QTS Irving 1 is an expanding data center project in Irving, Dallas County, Texas. QTS is named as operator. It was announced at 165 MW.

QTS Irving 1 is an expanding data center project in Irving, Dallas County, Texas. QTS is named as operator. It was announced at 165 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Irving, Dallas County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

165 MWAnnounced capacity
1Public records we have found
4Backup generators, diesel-fired house generators (DC3HSE, DC4HSE, DC5HSE, DC6HSE)

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of QTS Irving 1 in Irving, Dallas County, Texas, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Dallas County, Texas.See every project on the map

The land, to scale

One football field
56 acres, about 42 football fields. Drawn as a square for scale; the real shape is not known.

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has 165 MW announced on record, but its demand as the service measures it and its participation in another reliability or ancillary service are not on record.

    “The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))

    Rule checks: Project is in Texas; 165 MW on record (announced), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

  • Developer and operatorQTS

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Texas Commission on Environmental Quality, O4771

    Backup generators
    4 diesel-fired house generators (DC3HSE, DC4HSE, DC5HSE, DC6HSE)
    Backup generators
    120 diesel-fired emergency generators (EGEN1 through EGEN120) at data center buildings DC1 through DC6

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is QTS Irving 1?
QTS Irving 1 is a data center project in Irving, Dallas County, Texas.
Who operates QTS Irving 1?
QTS is named as the operator of QTS Irving 1.
How big is QTS Irving 1?
QTS Irving 1 was announced at 165 MW of capacity. The site covers 56 acres.
What stage is QTS Irving 1?
QTS Irving 1 is expanding.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Statement of Basis, Federal Operating Permit O4771, QTS Irving (Quality Investment Properties Irving, LLC)
    Texas Commission on Environmental Quality
    Tier 1 · Captured 2026-11-12 · Open the source · Archived copy
  2. 2
    QTS Data Center Locations: Texas
    QTS
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source