Amazon data center campus (Falls Township)

Falls Township,Bucks County,PennsylvaniaUnder constructionFirst public 2025Filing entity: Amazon Data Services, Inc.Last checked Nov 9, 2026

AmazonDeveloper and operatorNorthPoint DevelopmentDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Amazon data center campus (Falls Township) is a under-construction data center project in Falls Township, Bucks County, Pennsylvania. Amazon is named as operator. It was first public in 2025. Its permitted standby generators total 198 MW.

Amazon data center campus (Falls Township) is an under-construction data center project in Falls Township, Bucks County, Pennsylvania. Amazon is named as operator. Its permitted standby generators total 198 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Falls Township, Bucks County, Pennsylvania. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

10Public records we have found
1Tax agreement on record
72Backup generators, diesel-fired critical emergency generator engines rated 2.75 MW each (CEG1 through CEG72)
198Generator capacity, MW (72 engines at 2.75 MW each; backup generator capacity, not campus IT load)

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Bucks County, Pennsylvania.See every project on the map

Timeline

  1. · FilingFiled with Pennsylvania Department of Environmental Protection: air permit for Amazon data center campus (Falls Township)Proposed Plan Approval 09-0261A
  2. · DecisionPennsylvania Department of Environmental Protection: Minor modification revising the minimum SCR catalyst bed temperature required prior to planned startup of any engine listed in Source ID 101 from 572 degrees Fahrenheit to 430 degrees Fahrenheit (air permit) for Amazon data center campus (Falls...Minor Plan Approval Modification of 09-0261
  3. · DecisionPennsylvania Department of Environmental Protection: Amendment No. 2 to the individual NPDES permit for discharges of stormwater associated with construction activities, authorizing NP Falls Township Ind LLC to discharge from the facility known as Keystone Trade Center-Area 3 Development Part A.3...NPDES Permit PAD090088 A-3 (Amendment No. 2)
  4. · DecisionPennsylvania Department of Environmental Protection: Issued to Amazon Data Services Inc for the installation and operation of seventy-two (72) 2.75-megawatt (MW) diesel-fired critical emergency generator engines, two (2) 1,000-kilowatt (kW) diesel-fired house emergency generator engines, and two ...Plan Approval 09-0261
  5. · New projectFirst public record of Amazon data center campus (Falls Township)Under construction
  6. · DecisionFalls Township Board of Supervisors: Approval of NP Falls Township Industrial, LLC, Phase 2, Building 6, amended final land development, 1 Ben Fairless Drive, TMP 13-051-001: the previously approved 1,035,000 sq. ft. distribution facility is redesigned for data center use for Amazon data center c...Resolution 2025-12
  7. · DecisionFalls Township Board of Supervisors: Approval of NP Falls Township Industrial, LLC, Phase 3 preliminary and final land development, 700 S Port Road, TMP 13-051-001: a reconceptualized plan replacing four distribution facilities on approximately 247 acres with ten principal structures of 112,000 t...Resolution 2025-11

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 1834: Regulates commercial data centers and their energy use

    The act covers commercial data centers in Pennsylvania, facilities used for processing, storing, retrieving, or transmitting data with a peak demand of 25 megawatts or greater that are interconnected to a public utility; this project is a under_construction data center in Bucks County on record, but the project's peak demand is not on record.

    “A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following: (1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data. (2) Has a peak demand of 25 megawatts or greater. (3) Is interconnected to a public utility at a single point of interconnection or multiple points of interconnection or is interconnected to multiple public utilities within this Commonwealth through multiple points of interconnection.” (Section 2, definition of commercial data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Pennsylvania HB 2650: Requires state certification for data center tax benefits

    The act covers computer data centers in Pennsylvania, facilities predominantly used to house working servers or similar data storage systems, when an owner or operator seeks GRID certification and its tax benefits; this project is a under_construction data center in Bucks County on record, but whether its owner or operator has applied for or holds GRID certification is not on record.

    “All or part of a facility that may be composed of one or more businesses, owners or tenants, that is or will be predominantly used to house working servers or similar data storage systems and that may have uninterruptible energy supply or generator backup power, or both closed-loop cooling systems, towers and other temperature control infrastructure.” (Section 2902-D.1, definition of computer data center)

    Rule checks: Project is in Pennsylvania. Still to check: who it covers: not checked

Bills and laws in Pennsylvania

All 12 in Bill Watch

Who's involved

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Pennsylvania Department of Environmental Protection, Minor Plan Approval Modification of 09-0261

    Stated in the filing
    430 degrees Fahrenheit (minimum SCR catalyst bed temperature required before planned startup of any Source ID 101 engine, revised down from 572 degrees Fahrenheit)
  • Pennsylvania Department of Environmental Protection, Plan Approval 09-0261

    Generator capacity
    198 MW (72 engines at 2.75 MW each; backup generator capacity, not campus IT load)
    Backup generators
    72 diesel-fired critical emergency generator engines rated 2.75 MW each (CEG1 through CEG72)
    Backup generators
    4 diesel-fired house emergency generator engines (two at 1,000 kW and two at 750 kW)
    Generator capacity
    3.5 MW (2 x 1,000 kW plus 2 x 750 kW house emergency engines)
  • Pennsylvania Department of Environmental Protection, Proposed Plan Approval 09-0261A

    Backup generators
    3 diesel-fired ancillary emergency generator engines (one 2,360 hp Tier 2, one 609 hp Tier 3, one 398 hp Tier 3)
    Backup generators
    280 natural gas-fired critical back-up generator engines rated 4,287 hp each (NGG1 through NGG280)
  • Falls Township Board of Supervisors, Resolution 2025-12

    Floor area
    1,035,000 sq. ft. (Building 6 facility previously approved for distribution use, converted to data center use)
  • Falls Township Board of Supervisors, Resolution 2025-11

    Buildings
    10 principal structures proposed for the digital infrastructure campus (112,000 to 217,000 sq. ft. each, one or two stories)
    Stated in the filing
    247 acres (Phase 3 site area, approximate)

Public records

10 records found so far. 4 kinds of record are still being collected.

See every record

Questions people ask

Where is Amazon data center campus (Falls Township)?
Amazon data center campus (Falls Township) is a data center project in Falls Township, Bucks County, Pennsylvania.
Who operates Amazon data center campus (Falls Township)?
Amazon is named as the operator of Amazon data center campus (Falls Township).
What stage is Amazon data center campus (Falls Township)?
Amazon data center campus (Falls Township) is under construction. It was first public in 2025.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Minor Plan Approval Modification of 09-0261
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Plan Approval 09-0261 (Phase 1), Amazon Data Services Inc, Falls Township
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    Proposed Plan Approval 09-0261A (Phase 2)
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Information Sheet: Amazon Falls Township Data Center
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    NPDES Permit PAD090088 A-3 (Amendment No. 2), Keystone Trade Center-Area 3 Development Part A.3
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Township of Falls Board of Supervisors Meeting Minutes, March 24, 2025
    Falls Township
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Falls OKs Data Centers at Keystone Trade Center
    Falls Township
    Tier 1 · Captured 2026-11-09 · Open the source
  8. 8
    Falls Supervisors Remove Nearly 8 Acres from KOIZ Designation
    Falls Township
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    Meetings, Falls Township (Board of Supervisors agendas and minutes)
    Township of Falls, Pennsylvania
    Tier 1 · Captured 2026-11-09 · Open the source
  10. 10
    Southeast Regional Office, Data Centers: Amazon Data Center - Falls Township
    Pennsylvania Department of Environmental Protection
    Tier 1 · Captured 2026-11-08 · Open the source
  11. 11
    Governor Josh Shapiro Announces Amazon Plans to Invest $20 Billion in Pennsylvania for AI Infrastructure
    Pennsylvania Department of Community and Economic Development
    Tier 1 · Captured 2026-11-08 · Open the source
  12. 12
    ICYMI: Gov Shapiro and Sec Shirley Highlight Administration's Work to Speed Up Permitting (Falls Township visit)
    Office of the Governor, Commonwealth of Pennsylvania
    Tier 1 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page