Data Center Fact Check tracks 2 data center projects in Shackelford County, Texas as of November 2026: 1 under construction and 1 operating, totaling about 2,800 MW announced where a figure is published.
Shackelford County has 2 tracked data centers. Their announced capacity totals about 2,800 MW where a figure is published. Of those, 1 under construction and 1 operating. The projects here are Vantage Data Centers Shackelford County Campus (Shackelford County) and Vantage Frontier campus (Shackelford County). Every figure comes from the public record linked on this page.
Data center projects in Shackelford County
- Vantage Data Centers Shackelford County Campus (Shackelford County)
Operating1,400 MW announced
- Vantage Frontier campus (Shackelford County)
Under construction1,400 MW announced
Who serves this place
- Not collected yet.
Places in and around Shackelford County
Shackelford County is part of Texas.
Nearby places
- Dallas County36 data center projects tracked
- Bexar County16 data center projects tracked
- Collin County10 data center projects tracked
- Harris County9 data center projects tracked
- Denton County7 data center projects tracked
- Ellis County7 data center projects tracked
- Medina County6 data center projects tracked
- Tarrant County6 data center projects tracked
- Haskell County3 data center projects tracked
- Pecos County3 data center projects tracked
- Reeves County3 data center projects tracked
- Williamson County3 data center projects tracked
Court cases and commission dockets in Texas (18)
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Shackelford County?
- Data Center Fact Check tracks 2 data center projects in Shackelford County as of November 2026. Of those, 1 under construction and 1 operating.
- What is the biggest data center in Shackelford County?
- By announced capacity, the biggest data center in Shackelford County is Vantage Frontier campus (Shackelford County), announced at 1,400 MW. It is under construction.
- How much power do data centers in Shackelford County use?
- The 2 projects tracked in Shackelford County have announced about 2,800 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Shackelford County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tx-shackelford
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page