Data centers in Shackelford County, Texas

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 2 data center projects in Shackelford County, Texas as of November 2026: 1 under construction and 1 operating, totaling about 2,800 MW announced where a figure is published.

Shackelford County has 2 tracked data centers. Their announced capacity totals about 2,800 MW where a figure is published. Of those, 1 under construction and 1 operating. The projects here are Vantage Data Centers Shackelford County Campus (Shackelford County) and Vantage Frontier campus (Shackelford County). Every figure comes from the public record linked on this page.

2Data center projects we track

Data center projects in Shackelford County

Who serves this place

  • Not collected yet.

Places in and around Shackelford County

Shackelford County is part of Texas.

Nearby places

Court cases and commission dockets in Texas (18)

Bills and laws in Texas

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Shackelford County?
Data Center Fact Check tracks 2 data center projects in Shackelford County as of November 2026. Of those, 1 under construction and 1 operating.
What is the biggest data center in Shackelford County?
By announced capacity, the biggest data center in Shackelford County is Vantage Frontier campus (Shackelford County), announced at 1,400 MW. It is under construction.
How much power do data centers in Shackelford County use?
The 2 projects tracked in Shackelford County have announced about 2,800 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

    Cite this page

    Copy this citation when you reuse a figure or a finding from this page.