Data Center Fact Check tracks 2 data center projects in Iron County, Utah as of November 2026: 1 in permitting and 1 paused, totaling about 1,500 MW announced where a figure is published.
Iron County has 2 tracked data centers. Their announced capacity totals about 1,500 MW where a figure is published. Of those, 1 in permitting and 1 paused. The projects here are Antelope Data Center and Red Butte Energy & Data Center Campus. Every figure comes from the public record linked on this page.
Data center projects in Iron County
- Antelope Data Center
In permitting1,500 MW announced
- Red Butte Energy & Data Center Campus
Paused
Who serves this place
- Not collected yet.
Places in and around Iron County
Iron County is part of Utah.
Nearby places
- Salt Lake County24 data center projects tracked
- Utah County8 data center projects tracked
- Millard County3 data center projects tracked
- Carbon County2 data center projects tracked
- Beaver County1 data center project tracked
- Box Elder County1 data center project tracked
- Tooele County1 data center project tracked
- Washington County1 data center project tracked
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Iron County?
- Data Center Fact Check tracks 2 data center projects in Iron County as of November 2026. Of those, 1 in permitting and 1 paused.
- What is the biggest data center in Iron County?
- By announced capacity, the biggest data center in Iron County is Antelope Data Center, announced at 1,500 MW. It is in permitting.
- How much power do data centers in Iron County use?
- The 2 projects tracked in Iron County have announced about 1,500 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Iron County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-iron
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page