Data centers in Millard County, Utah
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 3 data center projects in Millard County, Utah as of November 2026: 2 under construction and 1 announced, totaling about 14,000 MW announced where a figure is published.
Millard County has 3 tracked data centers. Their announced capacity totals about 14,000 MW where a figure is published. Of those, 2 under construction and 1 announced. The projects here are BluSky AI Delta Gigasite Facility, Creekstone Energy Delta Gigasite, and Joule Capital Partners Data Center Campus. Every figure comes from the public record linked on this page.
Data center projects in Millard County
- BluSky AI Delta Gigasite Facility
AnnouncedDelta
- Creekstone Energy Delta Gigasite
Under constructionDelta10,000 MW announced
- Joule Capital Partners Data Center Campus
Under constructionHolden4,000 MW announced
Who serves this place
- Not collected yet.
A data center is proposed in Millard County
1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Millard County
Millard County is part of Utah.
Nearby places
- Salt Lake County24 data center projects tracked
- Utah County8 data center projects tracked
- Carbon County2 data center projects tracked
- Iron County2 data center projects tracked
- Beaver County1 data center project tracked
- Box Elder County1 data center project tracked
- Tooele County1 data center project tracked
- Washington County1 data center project tracked
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Millard County?
- Data Center Fact Check tracks 3 data center projects in Millard County as of November 2026. Of those, 2 under construction and 1 announced.
- What is the biggest data center in Millard County?
- By announced capacity, the biggest data center in Millard County is Creekstone Energy Delta Gigasite, announced at 10,000 MW. It is under construction.
- How much power do data centers in Millard County use?
- The 3 projects tracked in Millard County have announced about 14,000 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Millard County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-millard
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page