Joule Capital Partners Data Center Campus

Holden,Millard County,UtahUnder constructionFirst public 2025Filing entity: Joule Capital PartnersLast checked Nov 8, 2026

JouleDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Joule Capital Partners Data Center Campus is a under-construction data center project in Holden, Millard County, Utah. Joule is named as operator. It was first public in 2025. It was announced at 4,000 MW.

Joule Capital Partners Data Center Campus is an under-construction data center project in Holden, Millard County, Utah. Joule is named as operator. It was announced at 4,000 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Holden, Millard County, Utah. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

4,000 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Millard County, Utah.See every project on the map

The land, to scale

One football field
4,000 acres, about 3,025 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Joule Capital Partners Data Center CampusUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Utah HB 507: Limits local incentives for large data centers outside development zones

    The act covers large load data centers that are not located within a regionally significant development zone, for which a county or municipality may not offer an incentive, except project areas and agreements predating May 6, 2027; this project has 4,000 MW on record (generator capacity), but whether this project is a large load data center, whether it is located within such a zone, and whether a county or municipality offered it an incentive is not on record.

    “Except as provided in Subsection (1)(b), a county or municipality may not offer an incentive for a large load data center that is not located within a zone.” (Utah Code Sec. 63N-3a-402(1)(a))

    Rule checks: Project is in Utah. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Utah HB 76: Requires data centers to report water use before and after building

    The act covers large data centers, facilities with an annual water withdrawal of 75 acre feet per year or more whose buildings total at least 10,000 square feet; this project has 4,000 MW on record (generator capacity), but the project's annual water withdrawal and its building area is not on record.

    “"Large data center" means a facility with an annual water withdrawal of 75 acre feet per year or more that: (i) houses a group of networked server computers in one physical location to disseminate, manage, and store data and information as the primary service of the facility; (ii) consists of one or more buildings that in total equals or exceeds 10,000 square feet;” (Utah Code Sec. 73-5-8.3(1)(d), as enacted by H.B. 76, Section 2)

    Rule checks: Project is in Utah. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Utah SB 132: Sets cost and service rules for electric loads over 100 megawatts

    The act covers large-scale service requests to a qualified electric utility, for new service expected to reach a cumulative demand of 100 megawatts or greater within five years, or added service expected to raise a customer's total by 100 megawatts or greater within five years; this project has 4,000 MW on record (generator capacity), but whether this project has submitted a large-scale service request and its expected demand within five years of the requested start date is not on record.

    “"Large-scale service request" means a request submitted to a qualified electric utility for: (a) new electric service that is expected to reach a cumulative demand of 100 megawatts or greater within five years of the requested initial start date; or (b) additional electric service that is expected to increase a customer's total service level by 100 megawatts or greater within five years of the requested start date for the additional electric service.” (Definitions enacting Utah Code Title 54, Chapter 26, S.B. 132 enrolled text)

    Rule checks: Project is in Utah; 4,000 MW on record (announced), threshold 100 MW (Definitions enacting Utah Code Title 54, Chapter 26, S.B. 132 enrolled text). Still to check: dates: not checked, who it covers: not checked

Bills and laws in Utah

Open Bill Watch

Who's involved

  • Developer and operatorJoule

Power

Capacity, as announced or filed

  • 4,000 MW · Campus generationAug 2025 · generator_capacity

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Joule Capital Partners Data Center Campus?
    Joule Capital Partners Data Center Campus is a data center project in Holden, Millard County, Utah.
    Who operates Joule Capital Partners Data Center Campus?
    Joule is named as the operator of Joule Capital Partners Data Center Campus.
    How big is Joule Capital Partners Data Center Campus?
    Joule Capital Partners Data Center Campus was announced at 4,000 MW of capacity. The site covers 4,000 acres.
    What stage is Joule Capital Partners Data Center Campus?
    Joule Capital Partners Data Center Campus is under construction. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Joule, Caterpillar, and Wheeler Announce an Agreement to Power America's Growing Data Center Energy Needs
      Caterpillar Inc.
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Joule Capital Partners (Millard County campus)
      Joule Capital Partners
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page