Data Center Fact Check tracks 1 data center project in Box Elder County, Utah as of November 2026, totaling about 9,000 MW announced where a figure is published.
Box Elder County has 1 tracked data center project. Their announced capacity totals about 9,000 MW where a figure is published. The project here is Stratos Project, approved. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Box Elder County
- Stratos Project
Approved9,000 MW announced
Who serves this place
- Not collected yet.
Places in and around Box Elder County
Box Elder County is part of Utah.
Nearby places
- Salt Lake County24 data center projects tracked
- Utah County8 data center projects tracked
- Millard County3 data center projects tracked
- Carbon County2 data center projects tracked
- Iron County2 data center projects tracked
- Beaver County1 data center project tracked
- Tooele County1 data center project tracked
- Washington County1 data center project tracked
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Box Elder County?
- Data Center Fact Check tracks 1 data center project in Box Elder County as of November 2026.
- What is the biggest data center in Box Elder County?
- By announced capacity, the biggest data center in Box Elder County is Stratos Project, announced at 9,000 MW. It is approved.
- How much power do data centers in Box Elder County use?
- The 1 projects tracked in Box Elder County have announced about 9,000 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Box Elder County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-box-elder
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page