County Card
Data centers in Carbon County, Utah
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Carbon County, Utah as of November 2026: 1 proposed and 1 in permitting.
Carbon County has 2 tracked data centers. Of those, 1 proposed and 1 in permitting. The projects here are Altigen Energy Jurassic Spark and Valar Atomics Project Beehive. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Carbon County
- Altigen Energy Jurassic Spark
In permittingWellington
- Valar Atomics Project Beehive
ProposedWellington
Who serves this place
- Not collected yet.
A data center is proposed in Carbon County
1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Carbon County
Carbon County is part of Utah.
Cities and towns
- Wellington2 data center projects tracked
Nearby places
- Salt Lake County24 data center projects tracked
- Utah County8 data center projects tracked
- Millard County3 data center projects tracked
- Iron County2 data center projects tracked
- Beaver County1 data center project tracked
- Box Elder County1 data center project tracked
- Tooele County1 data center project tracked
- Washington County1 data center project tracked
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Carbon County?
- Data Center Fact Check tracks 2 data center projects in Carbon County as of November 2026. Of those, 1 proposed and 1 in permitting.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Carbon County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-carbon
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page