city Card
Data centers in Wellington, Utah
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Wellington, Utah as of November 2026: 1 proposed and 1 in permitting.
Wellington has 2 tracked data centers. Of those, 1 proposed and 1 in permitting. The projects here are Altigen Energy Jurassic Spark and Valar Atomics Project Beehive. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Wellington
- Altigen Energy Jurassic Spark
In permittingWellington
- Valar Atomics Project Beehive
ProposedWellington
Who serves this place
- Not collected yet.
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Wellington?
- Data Center Fact Check tracks 2 data center projects in Wellington as of November 2026. Of those, 1 proposed and 1 in permitting.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Wellington." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-wellington
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page