Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 4 data center projects in Laramie County, Wyoming as of November 2026: 2 under construction, 1 announced and 1 operating, totaling about 1,800 MW announced where a figure is published.

Laramie County has 4 tracked data centers. Their announced capacity totals about 1,800 MW where a figure is published. Of those, 2 under construction, 1 announced and 1 operating. Every figure comes from the public record linked on this page.

4Data center projects we track

Data center projects in Laramie County

Who serves this place

  • Not collected yet.

A data center is proposed in Laramie County

1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.

Open the resident checklist

Places in and around Laramie County

Laramie County is part of Wyoming.

Cities and towns

Nearby places

Court cases and commission dockets in Wyoming (3)

Bills and laws in Wyoming

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Laramie County?
Data Center Fact Check tracks 4 data center projects in Laramie County as of November 2026. Of those, 2 under construction, 1 announced and 1 operating.
What is the biggest data center in Laramie County?
By announced capacity, the biggest data center in Laramie County is Google Project Tembo, announced at 1,800 MW. It is under construction.
How much power do data centers in Laramie County use?
The 4 projects tracked in Laramie County have announced about 1,800 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

    Cite this page

    Copy this citation when you reuse a figure or a finding from this page.

    Data Center Fact Check. "Laramie County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-wy-laramie