Data centers in Laramie County, Wyoming
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Laramie County, Wyoming as of November 2026: 2 under construction, 1 announced and 1 operating, totaling about 1,800 MW announced where a figure is published.
Laramie County has 4 tracked data centers. Their announced capacity totals about 1,800 MW where a figure is published. Of those, 2 under construction, 1 announced and 1 operating. Every figure comes from the public record linked on this page.
Data center projects in Laramie County
- Google Project Tembo
Under construction1,800 MW announced
- Meta Cheyenne Data Center
Under constructionCheyenne
- Microsoft Cheyenne Data Center Campus
OperatingCheyenne
- Microsoft Cheyenne Southeast Expansion
AnnouncedCheyenne
Who serves this place
- Not collected yet.
A data center is proposed in Laramie County
1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Laramie County
Laramie County is part of Wyoming.
Cities and towns
- Cheyenne3 data center projects tracked
Nearby places
- Natrona County1 data center project tracked
- Uinta County1 data center project tracked
Court cases and commission dockets in Wyoming (3)
Bills and laws in Wyoming
- SF 0193 · Died or failed · Mar 3, 2025Would govern electric utility service agreements for large loads
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Laramie County?
- Data Center Fact Check tracks 4 data center projects in Laramie County as of November 2026. Of those, 2 under construction, 1 announced and 1 operating.
- What is the biggest data center in Laramie County?
- By announced capacity, the biggest data center in Laramie County is Google Project Tembo, announced at 1,800 MW. It is under construction.
- How much power do data centers in Laramie County use?
- The 4 projects tracked in Laramie County have announced about 1,800 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Laramie County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-wy-laramie
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page