Google Project Tembo
Laramie County,WyomingUnder constructionFirst public 2025Filing entity: Jupiter Star Holdings LLCLast checked Nov 8, 2026
CrusoeDeveloperRelated DigitalDeveloperGoogleDeveloper and end userTallgrass EnergyElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: City or address
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Google Project Tembo is a under-construction data center project in Laramie County, Wyoming. Crusoe is named as developer. It was first public in 2025. It was announced at 1,800 MW.
Google Project Tembo is an under-construction data center project in Laramie County, Wyoming. Crusoe is named as developer. It was announced at 1,800 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Laramie County, Wyoming. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Google Project TemboUnder construction
Bills and laws in Wyoming
- SF 0193 · Died or failed · Mar 3, 2025Would govern electric utility service agreements for large loads
Who's involved
- DeveloperCrusoe
- DeveloperRelated Digital
- Developer and end userGoogle
- Electric utilityTallgrass Energy
- Electric utilityAmerican Electric Power
- Electric utilityBlack Hills Energy
Power
Capacity, as announced or filed
- 10,000 MW · Design scaleJul 2025 · what the figure measures is not stated
- 1,800 MW · As announced July 2025Jul 2025 · what the figure measures is not stated
- 702 MW · Contracted fuel cell development (AEP)Nov 2026 · generator_capacity
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Google Project Tembo?
- Google Project Tembo is a data center project in Laramie County, Wyoming.
- Who is developing Google Project Tembo?
- Crusoe is named as the developer of Google Project Tembo.
- How big is Google Project Tembo?
- Google Project Tembo was announced at 1,800 MW of capacity. The site covers 716 acres.
- What stage is Google Project Tembo?
- Google Project Tembo is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Crusoe and Tallgrass Announce AI Data Center in Wyoming
Crusoe (via GlobeNewswire)Tier 4 · Captured 2026-11-08 · Open the source - 2
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page