Project File

Google Project Tembo

Laramie County,WyomingUnder constructionFirst public 2025Filing entity: Jupiter Star Holdings LLCLast checked Nov 8, 2026

CrusoeDeveloperRelated DigitalDeveloperGoogleDeveloper and end userTallgrass EnergyElectric utility

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Google Project Tembo is a under-construction data center project in Laramie County, Wyoming. Crusoe is named as developer. It was first public in 2025. It was announced at 1,800 MW.

Google Project Tembo is an under-construction data center project in Laramie County, Wyoming. Crusoe is named as developer. It was announced at 1,800 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Laramie County, Wyoming. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1,800 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Laramie County, Wyoming.See every project on the map

The land, to scale

One football field
716 acres, about 541 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Google Project TemboUnder construction

Bills and laws in Wyoming

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 10,000 MW · Design scaleJul 2025 · what the figure measures is not stated
  • 1,800 MW · As announced July 2025Jul 2025 · what the figure measures is not stated
  • 702 MW · Contracted fuel cell development (AEP)Nov 2026 · generator_capacity

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Google Project Tembo?
    Google Project Tembo is a data center project in Laramie County, Wyoming.
    Who is developing Google Project Tembo?
    Crusoe is named as the developer of Google Project Tembo.
    How big is Google Project Tembo?
    Google Project Tembo was announced at 1,800 MW of capacity. The site covers 716 acres.
    What stage is Google Project Tembo?
    Google Project Tembo is under construction. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Crusoe and Tallgrass Announce AI Data Center in Wyoming
      Crusoe (via GlobeNewswire)
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Google’s data center investment in Wyoming
      Google
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page