CDP Card
Data centers in Santa Teresa, New Mexico
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Santa Teresa, New Mexico as of November 2026, totaling about 2,450 MW announced where a figure is published.
Santa Teresa has 1 tracked data center project. Their announced capacity totals about 2,450 MW where a figure is published. The project here is Project Jupiter, under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Santa Teresa
- Project Jupiter
Under constructionSanta Teresa2,450 MW announced
Who serves this place
- Not collected yet.
Court cases and commission dockets in New Mexico (1)
Bills and laws in New Mexico
- HB 27 · Died or failed · Feb 19, 2026Expands a technology jobs tax credit; substitute excludes data centers
- SB 39 · Died or failed · Feb 19, 2026Puts large microgrids under utility commission clean energy oversight
- SB 97 · Died or failed · Feb 19, 2026Expands a technology jobs tax credit tied to data center eligibility
- SB 235 · Died or failed · Feb 14, 2026Puts large microgrids under utility commission clean energy oversight
- HB 93 · In effect · Jul 1, 2025Lets utilities recover grid technology costs and microgrids sell power
- SB 418 · Died or failed · Mar 22, 2025Creates a tax credit for qualified microgrid projects
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Santa Teresa?
- Data Center Fact Check tracks 1 data center project in Santa Teresa as of November 2026.
- What is the biggest data center in Santa Teresa?
- By announced capacity, the biggest data center in Santa Teresa is Project Jupiter, announced at 2,450 MW. It is under construction.
- How much power do data centers in Santa Teresa use?
- The 1 projects tracked in Santa Teresa have announced about 2,450 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Santa Teresa." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-nm-santa-teresa
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page