Skip to content

Project File

Prometheus Hyperscale Evanston Campus

Evanston,Uinta County,WyomingApprovedFirst public 2026Last checked Nov 8, 2026

Prometheus HyperscaleDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Prometheus Hyperscale Evanston Campus is an approved data center project in Evanston, Uinta County, Wyoming. Prometheus Hyperscale is named as developer. It was first public in 2026. It was announced at 1,250 MW.

Prometheus Hyperscale Evanston Campus is an approved data center project in Evanston, Uinta County, Wyoming. Prometheus Hyperscale is named as developer. It was announced at 1,250 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Evanston, Uinta County, Wyoming. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1,250 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Uinta County, Wyoming.See every project on the map

The land, to scale

One football field
506 acres, about 383 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Prometheus Hyperscale Evanston CampusApproved

Bills and laws in Wyoming

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 1,250 MW · Initial capacityJun 2026 · what the figure measures is not stated
  • 5,000 MW · Development pathJun 2026 · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Prometheus Hyperscale Evanston Campus?
    Prometheus Hyperscale Evanston Campus is a data center project in Evanston, Uinta County, Wyoming.
    Who is developing Prometheus Hyperscale Evanston Campus?
    Prometheus Hyperscale is named as the developer of Prometheus Hyperscale Evanston Campus.
    How big is Prometheus Hyperscale Evanston Campus?
    Prometheus Hyperscale Evanston Campus was announced at 1,250 MW of capacity. The site covers 506 acres.
    What stage is Prometheus Hyperscale Evanston Campus?
    Prometheus Hyperscale Evanston Campus is approved. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Prometheus Hyperscale Secures Unanimous Conditional Use Permit Approval from Uinta County Commissioners
      Prometheus Hyperscale via PR Newswire
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page