Monarch Compute Campus

Point Pleasant,Mason County,West VirginiaUnder constructionFirst public 2023Filing entity: Monarch Cloud Campus, LLCLast checked Nov 8, 2026

NscaleDeveloper and operatorAIPCorpDeveloperFidelis New EnergyDeveloperAnthropicEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Monarch Compute Campus is a under-construction data center project in Point Pleasant, Mason County, West Virginia. Nscale is named as operator. It was first public in 2023. It was announced at 2,000 MW.

Monarch Compute Campus is an under-construction data center project in Point Pleasant, Mason County, West Virginia. Nscale is named as operator. It was announced at 2,000 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Point Pleasant, Mason County, West Virginia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2,000 MWAnnounced capacity
2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Mason County, West Virginia.See every project on the map

The land, to scale

One football field
2,250 acres, about 1,702 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Monarch Compute CampusUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026West Virginia HB 2014: Creates a certified microgrid program for large West Virginia data centers

    The act covers high impact data centers, facilities with a critical IT load in the aggregate of 90 megawatts or higher that are placed into service on or after July 1, 2025 and certified by the Secretary of the Department of Commerce; this project has 8,000 MW on record (not stated), but the project's critical IT load, the date it was placed into service, and whether the Secretary has certified it is not on record.

    “"High Impact Data Center" means a facility or group of facilities that: ... (D) Has a critical IT load in the aggregate of 90 megawatts total or higher; and (E) Is placed into service on or after July 1, 2025.” (W. Va. Code Sec. 11-6N-2(6))

    Rule checks: Project is in West Virginia; 8,000 MW on record (not stated), threshold 90 MW (W. Va. Code Sec. 11-6N-2(6)). Still to check: dates: not checked, who it covers: not checked

Bills and laws in West Virginia

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 1,000 MW · Full buildout (2023 announcement)Aug 2023 · what the figure measures is not stated
  • 8,000 MW · Full buildoutMar 2026 · what the figure measures is not stated
  • 2,000 MW · Phase 1Mar 2026 · what the figure measures is not stated
  • 2,000 MW · Phase 1Mar 2026 · generator_capacity
  • 1,350 MW · Microsoft letter of intentMar 2026 · what the figure measures is not stated

Public records

2 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Monarch Compute Campus?
Monarch Compute Campus is a data center project in Point Pleasant, Mason County, West Virginia.
Who operates Monarch Compute Campus?
Nscale is named as the operator of Monarch Compute Campus.
How big is Monarch Compute Campus?
Monarch Compute Campus was announced at 2,000 MW of capacity. The site covers 2,250 acres.
What stage is Monarch Compute Campus?
Monarch Compute Campus is under construction. It was first public in 2023.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Tariff filing with corrected Schedules L.C.P. and I.P. sheets, Case No. 24-0611-E-T-PW (filed April 7, 2025)
    Public Service Commission of West Virginia
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S., Case PUR-2025-00057
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Partial Stipulation, Case PUR-2025-00057 (filed November 10, 2025)
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute
    Nscale
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia
    Nscale
    Tier 4 · Captured 2026-11-08 · Open the source
  6. 6
    Governor Morrisey Announces More Than $8.1 Billion in New Investment at West Virginia Business Summit
    Office of the Governor of West Virginia
    Tier 1 · Captured 2026-11-08 · Open the source
  7. 7
    Fidelis New Energy Selects Mason County West Virginia for Lifecycle Carbon Neutral Hydrogen Project, Data Center Campus, and Greenhouse Complex
    Fidelis New Energy, LLC (PR Newswire release, text as republished by Advanced BioFuels USA)
    Tier 4 · Captured 2026-11-08 · Open the source
  8. 8
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy
  9. 9
    WV data center secrecy and pollution issues loom large amid growing AI risks