Core Scientific data center campus, Muskogee (CoreWeave)
Muskogee,Muskogee County,OklahomaExpandingFirst public 2024Filing entity: Core Scientific Muskogee LLCLast checked Nov 8, 2026
Core ScientificDeveloper and operatorOG&EElectric utilityCoreWeaveEnd user
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Core Scientific data center campus, Muskogee (CoreWeave) is an expanding data center project in Muskogee, Muskogee County, Oklahoma. Core Scientific is named as operator. It was first public in 2024. It was announced at 1,500 MW.
Core Scientific data center campus, Muskogee (CoreWeave) is an expanding data center project in Muskogee, Muskogee County, Oklahoma. Core Scientific is named as operator. It was announced at 1,500 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Muskogee, Muskogee County, Oklahoma. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

The land, to scale
Timeline
- · New projectFirst public record of Core Scientific data center campus, Muskogee (CoreWeave)Expanding
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oklahoma SB 259: Restricts groundwater cooling permits for data centers
The act covers data processing facilities and data centers that use groundwater for cooling, whose groundwater permits may issue only for closed-loop, dielectric immersion, or comparably low-consumptive cooling technologies; this project has 1,500 MW on record (not stated), but whether this project uses groundwater for cooling and which cooling technology it uses is not on record.
“Using groundwater for cooling purposes at a data processing facility or data center through open-air evaporative cooling systems or any other cooling technology that consumes groundwater through evaporation or discharge without recirculation. Groundwater permits for such facilities shall only be issued if the applicant demonstrates that the cooling system utilizes closed-loop, dielectric immersion, or other comparably low-consumptive cooling technologies that substantially recirculate groundwater and minimize consumptive loss as determined by the Board” (Enrolled text, amended 82 O.S. Section 1020.15, permitting exclusions list, item 11)
Rule checks: Project is in Oklahoma. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Oklahoma
- HB 2992 · In effect · Jul 1, 2026Requires separate tariffs and long contracts for large load customers
- SB 259 · Signed into law · May 20, 2026Restricts groundwater cooling permits for data centers
- HB 3724 · Died or failed · Feb 17, 2026Bans subsidies and cost shifting for high-demand facilities
- HB 3392 · Died or failed · Feb 11, 2026Orders a state study of large load customer impacts
- HB 3917 · Died or failed · Feb 4, 2026Adds a peak demand surcharge for large data centers
- HB 4194 · Died or failed · Feb 3, 2026Requires financial assurance for data center decommissioning
Who's involved
- Developer and operatorCore Scientific
- Electric utilityOG&E
- End userCoreWeave
Power
Capacity, as announced or filed
- 70 MW · Building 1Apr 2026 · it_load
- 440 MW · Polaris DS acquisition (existing contracted power)May 2026 · what the figure measures is not stated
- 1,500 MW · Campus plan (full expansion)May 2026 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Core Scientific data center campus, Muskogee (CoreWeave)?
- Core Scientific data center campus, Muskogee (CoreWeave) is a data center project in Muskogee, Muskogee County, Oklahoma.
- Who operates Core Scientific data center campus, Muskogee (CoreWeave)?
- Core Scientific is named as the operator of Core Scientific data center campus, Muskogee (CoreWeave).
- How big is Core Scientific data center campus, Muskogee (CoreWeave)?
- Core Scientific data center campus, Muskogee (CoreWeave) was announced at 1,500 MW of capacity. The site covers 64 acres.
- What stage is Core Scientific data center campus, Muskogee (CoreWeave)?
- Core Scientific data center campus, Muskogee (CoreWeave) is expanding. It was first public in 2024.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Core Scientific Form 8-K Exhibit 99.2, Supplemental Information (Muskogee Campus section)
Core Scientific, Inc. (SEC filing)Tier 1 · Captured 2026-11-08 · Open the source - 2Core Scientific acquires cryptomine in Muskogee to expand AI data center campus
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 3U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page