Skip to content

Project File

Stargate Saline Township data center campus (The Barn)

Washtenaw County,MichiganUnder constructionFirst public 2025Filing entity: Related DigitalLast checked Nov 8, 2026

Related DigitalDeveloperWalbridgeBuilderDTE EnergyElectric utilityOracleEnd user

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Stargate Saline Township data center campus (The Barn) is a under-construction data center project in Washtenaw County, Michigan. Related Digital is named as developer. It was first public in 2025. It was announced at 1,000 MW.

Stargate Saline Township data center campus (The Barn) is an under-construction data center project in Washtenaw County, Michigan. Related Digital is named as developer. It was announced at 1,000 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Washtenaw County, Michigan. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

1,000 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Washtenaw County, Michigan.See every project on the map

The land, to scale

One football field
250 acres, about 189 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Stargate Saline Township data center campus (The Barn)Under construction

Bills and laws in Michigan

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 1,000 MW · Full campus as announcedOct 2025 · what the figure measures is not stated
  • 1,400 MW · DTE power supply agreementDec 2025 · grid connection

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Stargate Saline Township data center campus (The Barn)?
    Stargate Saline Township data center campus (The Barn) is a data center project in Washtenaw County, Michigan.
    Who is developing Stargate Saline Township data center campus (The Barn)?
    Related Digital is named as the developer of Stargate Saline Township data center campus (The Barn).
    How big is Stargate Saline Township data center campus (The Barn)?
    Stargate Saline Township data center campus (The Barn) was announced at 1,000 MW of capacity. The site covers 250 acres.
    What stage is Stargate Saline Township data center campus (The Barn)?
    Stargate Saline Township data center campus (The Barn) is under construction. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan
      Related Digital
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan
      DataCenterDynamics
      Tier 3 · Captured 2026-11-08 · Open the source
    3. 3
      What the Michigan Stargate site says about today's AI market
      Latitude Media
      Tier 3 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page