Utility commission
Nevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Where it stands: Pending before the commission as of Nov 8, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
Companion CIAC gross-up docket for Nevada Power, pending as of the Commission's docket list read on November 8, 2026. As in the Sierra Pacific docket, new large loads would reimburse the tax cost on customer-funded construction contributions.
The facts
- Regulator
- Public Utilities Commission of Nevada
- Docket number
- 26-09006
- Type
- Interconnection rule
- Utility
- Nevada Power Co
- State
- Nevada
- Status date
- Nov 8, 2026
- Large-load rules
- Yes
Projects served by Nevada Power Co
Related cases and proceedings
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
- Utility commission · DecidedSierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commissionJoint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
- Utility commission · Pending before the commissionJoint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
Sources
- 1PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Nevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate." Last activity 2026-11-08. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-nevada-power-ciac-26-09006