What it is

Companion CIAC gross-up docket for Nevada Power, pending as of the Commission's docket list read on November 8, 2026. As in the Sierra Pacific docket, new large loads would reimburse the tax cost on customer-funded construction contributions.

The facts

Regulator
Public Utilities Commission of Nevada
Docket number
26-09006
Type
Interconnection rule
Utility
Nevada Power Co
State
Nevada
Status date
Nov 8, 2026
Large-load rules
Yes

Projects served by Nevada Power Co

Related cases and proceedings

Sources

  1. 1
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Nevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate." Last activity 2026-11-08. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-nevada-power-ciac-26-09006