Utility commission
Application of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
Where it stands: Pending before the commission as of Nov 8, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
Companion Rule 9 (line extension) revisions to the LLESA framework, filed March 5, 2026: customer-specific charges for Rule 9 (contract-required) generation additions, return of unused contract-required generation amounts, and security requirements when the interconnection study begins. The proposed security is a letter of credit or cash equal to the greater of 50 percent of forecasted 24-month bills at full load or $10 million, with a readiness milestone schedule.
The facts
- Regulator
- Public Utilities Commission of Nevada
- Docket number
- 26-03010
- Type
- Interconnection rule
- Utility
- Nevada Power Co
- State
- Nevada
- Filed
- Mar 5, 2026
- Status date
- Nov 8, 2026
- Large-load rules
- Yes
Projects served by Nevada Power Co
Related cases and proceedings
- Utility commission · Pending before the commissionApplication of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Prologis
- Utility commission · Pending before the commissionApplication of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Proton Novva SPV, LLC (Novva)
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
- Utility commission · Pending before the commissionNevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
- Utility commission · DecidedSierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
In the record
- Utility case, Mar 5, 2026. Utility case filed: Application of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests Public Utilities Commission of Nevada, 26-03010
Sources
- 1PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests." Last activity 2026-11-08. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-nevada-power-rule9-26-03010