What it is
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
The facts
- Regulator
- Public Utilities Commission of Nevada
- Docket number
- 26-05029
- Type
- Other
- Utility
- Nevada Power Co
- State
- Nevada
- Status date
- Nov 8, 2026
- Large-load rules
- Yes, for loads of 25 MW or more
Projects served by Nevada Power Co
Related cases and proceedings
- Utility commission · Pending before the commissionApplication of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Prologis
- Utility commission · Pending before the commissionApplication of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
- Utility commission · Pending before the commissionApplication of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
- Utility commission · Pending before the commissionNevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
- Utility commission · DecidedSierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Sources
- 1PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Proton Novva SPV, LLC (Novva)." Last activity 2026-11-08. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-nevada-power-llesa-proton-novva-26-05029