Utility commission
Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)
Where it stands: Pending before the commission as of Oct 6, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
Same October 6, 2026 Large Load Tariff settlement as the Duke Energy Carolinas case: Large Load Customer at 50 MW or more with an expected load factor of 80 percent or more, or 150 MW or more at any load factor; Schedule HLF billing demand floor of 75 percent of contract demand; CIAC advances for dedicated facilities and a letter of credit for transmission network upgrades; minimum terms of the greater of 10 years or 5 years plus ramp (under 100 MW) or the greater of 15 years or 10 years plus ramp (100 MW or more); 24 to 48 month notice periods; liquidated damages and security as in the Carolinas row; interruptibility of 95 percent of contract load up to 50 hours per year or 50 percent up to 100 hours during the ramp plus one year.
The facts
- Regulator
- North Carolina Utilities Commission
- Docket number
- E-2, Sub 1380
- Type
- Rate case
- Utility
- Duke Energy Progress, LLC
- State
- North Carolina
- Filed
- Nov 20, 2025
- Status date
- Oct 6, 2026
- Large-load rules
- Yes, for loads of 50 MW or more
Projects served by Duke Energy Progress, LLC
Related cases and proceedings
- Utility commission · Pending before the commissionApplication of Duke Energy Carolinas, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)
- Utility commission · DecidedDuke Energy Progress, LLC general rate case (Large Load Stipulation)
In the record
- Utility case, Nov 20, 2025. Utility case filed: Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement) North Carolina Utilities Commission, E-2, Sub 1380
Sources
- 1Agreement and Stipulation of Settlement on Large Load Tariff, Dockets E-7 Sub 1329 and E-2 Sub 1380 (filed October 6, 2026)
Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (filing parties)Tier 2 · Settlement Exhibit 1, Large Load Tariff, pp. 1-3 of the exhibit; Settlement Section II.B.2 · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)." Last activity 2026-10-06. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-duke-progress-nc-large-load-settlement-2026