Utility commission

Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)

Where it stands: Pending before the commission as of Oct 6, 2026

Draft research, not yet verified. Open a source to check any detail.

What it is

Same October 6, 2026 Large Load Tariff settlement as the Duke Energy Carolinas case: Large Load Customer at 50 MW or more with an expected load factor of 80 percent or more, or 150 MW or more at any load factor; Schedule HLF billing demand floor of 75 percent of contract demand; CIAC advances for dedicated facilities and a letter of credit for transmission network upgrades; minimum terms of the greater of 10 years or 5 years plus ramp (under 100 MW) or the greater of 15 years or 10 years plus ramp (100 MW or more); 24 to 48 month notice periods; liquidated damages and security as in the Carolinas row; interruptibility of 95 percent of contract load up to 50 hours per year or 50 percent up to 100 hours during the ramp plus one year.

The facts

Regulator
North Carolina Utilities Commission
Docket number
E-2, Sub 1380
Type
Rate case
Utility
Duke Energy Progress, LLC
State
North Carolina
Filed
Nov 20, 2025
Status date
Oct 6, 2026
Large-load rules
Yes, for loads of 50 MW or more

Projects served by Duke Energy Progress, LLC

Related cases and proceedings

In the record

  1. Utility case, Nov 20, 2025. Utility case filed: Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement) North Carolina Utilities Commission, E-2, Sub 1380

Sources

  1. 1
    Agreement and Stipulation of Settlement on Large Load Tariff, Dockets E-7 Sub 1329 and E-2 Sub 1380 (filed October 6, 2026)
    Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (filing parties)
    Tier 2 · Settlement Exhibit 1, Large Load Tariff, pp. 1-3 of the exhibit; Settlement Section II.B.2 · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)." Last activity 2026-10-06. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-duke-progress-nc-large-load-settlement-2026