Utility commission
Alabama Power contracts for electric service with large load data center customers filed under Rate FCR during the Docket 33709 interim process (Dotier, LLC; Alabama ADC Holdings, LLC; Woostor, LLC and APLD BHM-01 LLC)
Where it stands: Pending before the commission as of Oct 1, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
Alabama Power filed individual large load data center contracts with the Commission under the pre-existing Rate FCR process while the generic Docket 33709 proceeding ran: Dotier, LLC (Meta Montgomery) on June 18, 2026; Alabama ADC Holdings, LLC (Nebius Birmingham) on July 24, 2026, later deemed approved; and Woostor, LLC with APLD BHM-01 LLC (Applied Digital, Tuscaloosa County) on August 14, 2026, under review as of October 2026. Public copies redact contract length, minimum billing, capacity, and pricing; the Commission and the Attorney General receive unredacted copies. These filings are individual contract reviews, not separate numbered dockets; the governing process is Docket 33709 (staged row proc-alabama-power-fcr-lldc-33709).
The facts
- Regulator
- Alabama Public Service Commission
- Type
- Other
- State
- Alabama
- Filed
- Jun 18, 2026
- Status date
- Oct 1, 2026
- Large-load rules
- Yes, for loads of 150 MW or more
Related cases and proceedings
- Utility commission · DecidedGeneric Proceeding to Establish a Process for Consideration of Contracts for Electric Service Between Alabama Power Company and Large Load Data Center Customers
- Utility commission · Pending before the commissionAlabama Power 2025 Integrated Resource Plan (summary report filed with the Commission)
- Court case · PendingJohnson Contractors, Inc. v. Starbelt, LLC et al.
In the record
- Utility case, Jun 18, 2026. Utility case filed: Alabama Power contracts for electric service with large load data center customers filed under Rate FCR during the Docket 33709 interim process (Dotier, LLC; Alabama ADC Holdings, LLC; Woostor, LLC and APLD BHM-01 LLC) Alabama Public Service Commission
Sources
- 1SELC Initial Comments on Large Load Contracts, Docket 33709
Southern Environmental Law Center (filed in Ala. PSC Docket 33709)Tier 2 · SELC initial comments in Docket 33709 (filed Aug 6, 2026): three large-load contracts filed since July 2026 named as ADC Holdings, LLC (deemed approved), Wooster/Woostor, LLC, and APLD BHM-01 LLC; staged project rows carry the Dotier, LLC filing entity for Meta Montgomery (filed June 18, 2026 per the same docket record) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Alabama Power contracts for electric service with large load data center customers filed under Rate FCR during the Docket 33709 interim process (Dotier, LLC; Alabama ADC Holdings, LLC; Woostor, LLC and APLD BHM-01 LLC)." Last activity 2026-10-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-alabama-power-fcr-contracts-2026