What it is

Alabama Power's long-term load forecast treats data centers as the driver of new large load growth: 'anticipated additions of large load customers (e.g., data centers) are forecasted to drive an overall increase in Commercial class electricity consumption' over the forecast horizon. The all-load peak forecast grows slowly (average annual summer peak growth about 0.10 percent 2025-2030; winter about 0.19 percent) because data center and other large load additions sit inside a largely flat residential and commercial base. These are system forecast figures, not any project's capacity, and no data-center-only megawatt figure is published in the summary report.

The facts

Regulator
Alabama Public Service Commission
Type
Other
State
Alabama
Filed
Jan 1, 2025
Large-load rules
Yes

Related cases and proceedings

In the record

  1. Utility case, 2025. Utility case filed: Alabama Power 2025 Integrated Resource Plan (summary report filed with the Commission) Alabama Public Service Commission

Sources

  1. 1
    2025 Integrated Resource Plan, Summary Report
    Alabama Power Company
    Tier 2 · 2025 IRP Summary Report, Section IV.B Load Forecast (pp. 16-18): large load / data center passage at p. 16; peak demand forecast discussion and growth rates at pp. 17-18 · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Alabama Power 2025 Integrated Resource Plan (summary report filed with the Commission)." Last activity 2025-01-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-alabama-power-irp-2025