Utility commission
Rate Schedule XHLF, General Service, Extra High Load Factor
Where it stands: In effect as of Mar 8, 2024
Draft research, not yet verified. Open a source to check any detail.
What it is
For monthly maximum demand of 5,000 kW or more with a load factor of 92 percent or more in at least nine of the prior 12 months. Every customer signs an Electric Supply Agreement that sets the contract length, minimum and maximum monthly loads, and a contractual minimum bill; billing kW is the greater of the metered 15-minute maximum or the minimum kW in the agreement. That agreement is APS's take-or-pay protection; no published exit fee exists. Optional sustainability features at 15,000 kW or more require a 50 percent carbon-free energy commitment.
The facts
- Regulator
- Arizona Corporation Commission
- Docket number
- A.C.C. No. 6067
- Type
- Large load tariff
- Utility
- Arizona Public Service Company
- State
- Arizona
- Status date
- Mar 8, 2024
- Large-load rules
- Yes, for loads of 5 MW or more
Projects served by Arizona Public Service Company
- Aligned Data Centers PHX-13 (Glendale)
- Compass Datacenters Goodyear campus
- Digital Realty PHX10 (Phoenix)
- Flexential Phoenix - Deer Valley Data Center
- Iron Mountain Data Centers AZS-1 (Scottsdale)
- Iron Mountain Phoenix campus (AZP-1, AZP-2, AZP-3)
- Microsoft Citrus Road campus (Goodyear)
- Microsoft El Mirage datacenter campus
- Microsoft PHX 10-11 (Goodyear)
- phoenixNAP Phoenix Data Center
- Stream Data Centers Goodyear campus (Phoenix I-V)
- Stream Data Centers Phoenix
Related cases and proceedings
- Utility commission · In effectE-65, Standard Price Plan for Substation Large General Service
- Utility commission · In effectE-66, Standard Price Plan for Substation Large General Service with Instantaneously Interruptible Load
- Utility commission · In effectE-67, Standard Price Plan for Large Load Substation Large General Service
- Utility commission · DecidedProposed Adjustments to SRP's Standard Electric Price Plans Effective with the November 2025 Billing Cycle
Sources
- 1Rate Schedule XHLF, General Service, Extra High Load Factor (A.C.C. No. 6067)
Arizona Public Service CompanyTier 1 · Rate Schedule XHLF (A.C.C. No. 6067), Availability section (5,000 kW and 92 percent; 15,000 kW sustainability features; ESA requirement) and Minimum Bill section · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Rate Schedule XHLF, General Service, Extra High Load Factor." Last activity 2024-03-08. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-aps-xhlf