Utility commission
Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC
Where it stands: Decided as of Dec 3, 2025
Draft research, not yet verified. Open a source to check any detail.
What it is
Service is under TEP's Commission-approved Large Power Service Time-of-Use High Voltage rate schedule (TILPSTHV, service at a nominal transmission system voltage of 138,000 volts or higher), with no discounted rate: the customer pays the full Bundled Standard Offer Service under that schedule, including taxes, fees, riders and other cost adjustments, and any future change to that rate needs new Commission approval. The agreement runs 10 years from its commencement date and then extends automatically for successive one-year periods unless either party gives written notice of termination. Minimum billing: the customer is billed even if actual use falls below its monthly capacity commitments, and the ESA deems the customer's contract capacity to be 75 percent of Contract Capacity for the applicable billing period; during the load ramp period the customer may, by mutual written agreement and with the notice the ESA requires, raise contract capacity up to the Maximum Contract Capacity. TEP's published capacity for the site is up to 286 MW, with load ramping over 18 months. Humphrey's Peak pays the total cost of the two new 138 kV lines connecting the site to the future South Houghton substation (the line extension and associated capital investments are about $40 million, paid by the customer directly; TEP owns the lines). The South Houghton Switchyard is treated differently: because it will also serve other customers and nearby development areas, TEP proposed that its cost be recovered through its FERC transmission tariff revenue requirement, with the contract's incremental transmission revenue stated to be sufficient that no costs are shifted to other customers; Commission statements at approval described the customer as covering the line extensions and the switchyard. Exit terms: after the commencement date the customer may terminate only on at least three years' prior written notice; after the development period and before commencement, the termination cost is $40 million; and the filed Termination Plan sets a termination payment based on minimum billing demand over the following 10 years, month by month, backed by the contract's security provisions, alongside credit security requirements and minimum demand payments if the project does not operate as planned.
The facts
- Regulator
- Arizona Corporation Commission
- Docket number
- E-01933A-25-0187
- Type
- Other
- Utility
- Tucson Electric Power Company
- State
- Arizona
- Filed
- Aug 25, 2025
- Status date
- Dec 3, 2025
- Large-load rules
- Yes
Related cases and proceedings
- Utility commission · Pending before the commissionApplication of Tucson Electric Power Company for the Establishment of Just and Reasonable Rates and Charges Designed to Realize a Reasonable Rate of Return on the Fair Value of the Properties of Tucson Electric Power Company
- Utility commission · Pending before the commissionIn the Matter of the Commission's Inquiry and Review of the Existing Rate Classifications and Other Potential Issues Relating to Data Centers
- Utility commission · Pending before the commissionApplication of Arizona Public Service Company for approval of new rates, charges, and schedules
- Utility commission · DecidedTemporary Decrease to SRP's Fuel and Purchased Power Adjustment Mechanism (FPPAM) Prices, May Through October 2026 Billing Cycles
- Utility commission · In effectBuy-Through Program
- Utility commission · In effectE-65, Standard Price Plan for Substation Large General Service
- Utility commission · In effectE-66, Standard Price Plan for Substation Large General Service with Instantaneously Interruptible Load
- Utility commission · In effectE-67, Standard Price Plan for Large Load Substation Large General Service
In the record
- Utility case, Aug 25, 2025. Utility case filed: Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC Arizona Corporation Commission, E-01933A-25-0187
Sources
- 1ACC Approves TEP Energy Supply Agreement, Ensures Customer Protections from Costs Related to Data Center Project
Arizona Corporation CommissionTier 1 · ACC approval release, paragraphs 1 and 5 to 7 (December 3, 2025 vote, 4-1; 10-year agreement; minimum monthly billing; 18-month ramp; customer pays dedicated infrastructure costs) and closing line (Docket No. E-01933A-25-0187); Staff memorandum, November 19, 2025, pages 2 to 4 (TILPSTHV Bundled Standard Offer Service; contract capacity deemed 75 percent of Contract Capacity; 10-year term with one-year extensions; termination on at least three years' notice after commencement; $40 million pre-commencement termination cost; Termination Plan of minimum billing demand over 10 years; customer pays the two 138 kV lines, about $40 million; switchyard cost proposed for the FERC transmission revenue requirement); TEP Data Center ESA page, Customer Protections (up to 286 MW; termination fee; credit security; minimum demand payments) · Open the source - 2Open Meeting Memorandum and Staff Proposed Order, Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC (Docket No. E-01933A-25-0187)
Arizona Corporation CommissionTier 1 · ACC approval release, paragraphs 1 and 5 to 7 (December 3, 2025 vote, 4-1; 10-year agreement; minimum monthly billing; 18-month ramp; customer pays dedicated infrastructure costs) and closing line (Docket No. E-01933A-25-0187); Staff memorandum, November 19, 2025, pages 2 to 4 (TILPSTHV Bundled Standard Offer Service; contract capacity deemed 75 percent of Contract Capacity; 10-year term with one-year extensions; termination on at least three years' notice after commencement; $40 million pre-commencement termination cost; Termination Plan of minimum billing demand over 10 years; customer pays the two 138 kV lines, about $40 million; switchyard cost proposed for the FERC transmission revenue requirement); TEP Data Center ESA page, Customer Protections (up to 286 MW; termination fee; credit security; minimum demand payments) · Open the source - 3Data Center ESA
Tucson Electric PowerTier 1 · ACC approval release, paragraphs 1 and 5 to 7 (December 3, 2025 vote, 4-1; 10-year agreement; minimum monthly billing; 18-month ramp; customer pays dedicated infrastructure costs) and closing line (Docket No. E-01933A-25-0187); Staff memorandum, November 19, 2025, pages 2 to 4 (TILPSTHV Bundled Standard Offer Service; contract capacity deemed 75 percent of Contract Capacity; 10-year term with one-year extensions; termination on at least three years' notice after commencement; $40 million pre-commencement termination cost; Termination Plan of minimum billing demand over 10 years; customer pays the two 138 kV lines, about $40 million; switchyard cost proposed for the FERC transmission revenue requirement); TEP Data Center ESA page, Customer Protections (up to 286 MW; termination fee; credit security; minimum demand payments) · Open the source - 4Setting the Record Straight: TEP Reaffirms Transparency, Accountability, and Regulatory Oversight in Project Blue Agreement
Tucson Electric PowerTier 1 · ACC approval release, paragraphs 1 and 5 to 7 (December 3, 2025 vote, 4-1; 10-year agreement; minimum monthly billing; 18-month ramp; customer pays dedicated infrastructure costs) and closing line (Docket No. E-01933A-25-0187); Staff memorandum, November 19, 2025, pages 2 to 4 (TILPSTHV Bundled Standard Offer Service; contract capacity deemed 75 percent of Contract Capacity; 10-year term with one-year extensions; termination on at least three years' notice after commencement; $40 million pre-commencement termination cost; Termination Plan of minimum billing demand over 10 years; customer pays the two 138 kV lines, about $40 million; switchyard cost proposed for the FERC transmission revenue requirement); TEP Data Center ESA page, Customer Protections (up to 286 MW; termination fee; credit security; minimum demand payments) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC." Last activity 2025-12-03. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-tep-project-blue-esa-2025