Grid load growth by state

How much new electric load utilities and grid operators say is coming, state by state. Each figure is the publisher's own number for its own territory, printed as stated, with the date it was stated and the year it looks out to. Our article on grid load growth tells the national story behind these rows.

Utilities, grid operators, and public agencies publish how much new electric load they expect, mostly driven by data centers, and this page gathers every such figure in our record: 110 figures from 44 publishers, covering 27 states and 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track data center projects. Each figure is printed as its publisher states it, with the date it was stated and the year it looks out to. The figures are never added together: each covers its own territory and its own years, and the territories overlap, so a single total would count the same expected load more than once.

Nebraska

Load figures whose territory sits in Nebraska. The state name links to the state page, with the projects tracked there.

  • Nebraska Power Association (filed with the Nebraska Power Review Board)

    Nebraska statewide (NPPD, OPPD, and LES territories aggregated)

    Figure: 1,100 MW, load requests

    Stated: August 21, 2026

    Looks out to: Not stated

    “Data Centers and Other Computational Load: Contracted Loads from 800 MW to 1100 MW”

  • Nebraska Power Association (filed with the Nebraska Power Review Board)

    Nebraska statewide (NPPD, OPPD, and LES territories aggregated)

    Figure: 1,950 MW, load requests

    Stated: August 21, 2026

    Looks out to: Not stated

    “Data Centers and Other Computational Load: Prospective Loads from 350 MW to 1950 MW”

  • Nebraska Power Association (filed with the Nebraska Power Review Board)

    Nebraska statewide (NPPD, OPPD, and LES territories aggregated)

    Figure: 4,300 MW, load requests

    Stated: August 21, 2026

    Looks out to: Not stated

    “Data Centers and Other Computational Load: Speculative Loads from 1800 MW to 4300 MW”

  • NPPD

    NPPD service territory, Nebraska

    Figure: 176 MW, forecast added load

    Stated: June 10, 2026

    Looks out to: 2027

    “Expected loads and loads going through the new load process: 176 MW expected new load in 2027”

  • NPPD

    NPPD service territory, Nebraska

    Figure: 125 MW, forecast added load

    Stated: June 10, 2026

    Looks out to: 2029

    “Expected loads and loads going through the new load process: 125MW of new load process additions beginning in 2029”

  • NPPD

    NPPD service territory, Nebraska

    Figure: 265 MW, connected load

    Stated: June 10, 2026

    Looks out to: Not stated

    “Expected loads and loads going through the new load process: 265 MW expected new load already online since 2023”

  • OPPD

    OPPD service territory (eastern Nebraska)

    Figure: 2,000 MW, load requests

    Stated: September 2026

    Looks out to: Not stated

    “The utility has nearly 2,000 megawatts of economic development projects actively in its queue through 2031, according to a September presentation.”

  • OPPD

    OPPD service territory (eastern Nebraska)

    Figure: 5,000 MW, load requests

    Stated: September 2026

    Looks out to: Not stated

    “But there are about 5,000 megawatts of other projects on the radar.”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

Nevada

Load figures whose territory sits in Nevada. The state name links to the state page, with the projects tracked there.

  • NV Energy

    Nevada

    Figure: 7,600 MW, load requests

    Stated: 2024

    Looks out to: Not stated

    “In total, these customers have requested approximately 7,600 MW of capacity additions, with nearly 6,500 MW at Sierra and 1,180 MW at Nevada Power.”

  • NV Energy

    Nevada

    Figure: 5,900 MW, load requests

    Stated: 2024

    Looks out to: 2033

    “Twelve of these projects are bundled-service high load factor data centers requesting 5,900 MW of capacity by 2033.”

  • NV Energy

    Nevada

    Figure: 16,930 MW, load requests

    Stated: May 2026

    Looks out to: Not stated

    “Formal requests from 39 prospective customers already total about 16,930 megawatts, most of it in the Northern Nevada.”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

New Mexico

Load figures whose territory sits in New Mexico. The state name links to the state page, with the projects tracked there.

  • PNM

    PNM service territory (New Mexico)

    Figure: 4,197 MW, load requests

    Stated: February 2025

    Looks out to: Not stated

    “In February 2025, PNM reported that it had 4,197 megawatts of interconnection requests by large loads, 87% of which it attributed to data centers.”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

New York

Load figures whose territory sits in New York. The state name links to the state page, with the projects tracked there.

  • NYISO

    New York State

    Figure: 6,055 MW, load requests

    Stated: July 2025

    Looks out to: Not stated

    “As of July 2025, there are 29 large load projects in the queue which would collectively add nearly 6,055 MW of load to the grid.”

  • NYISO

    New York State

    Figure: 4,000 MW, forecast added load

    Stated: July 2025

    Looks out to: 2035

    “Our load forecasters anticipate that as much as roughly 2,500 MW to 4,000 MW of that new demand will be on the system by 2035.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Ohio

Load figures whose territory sits in Ohio. The state name links to the state page, with the projects tracked there.

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 30,000 MW, load requests

    Stated: 2025

    Looks out to: Not stated

    “Prior to the PUCO's approval of AEP Ohio's Data Center Tariff, data centers or developers had submitted requests for 30,000 MW, an unprecedented electricity demand for the state.”

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 13,022.7 MW, load requests

    Stated: February 12, 2026

    Looks out to: Not stated

    “Of the initial 30,000 MW that expressed interest prior to the PUCO's adoption of the Data Center Tariff, 13,022.7 MW asked and paid for a study.”

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 5,642 MW, signed agreements

    Stated: February 12, 2026

    Looks out to: Not stated

    “As of February 12, 2026, data centers or data center developers have signed binding contracts with AEP Ohio for 5,642 megawatts (MW).”

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 17,861 MW, signed agreements

    Stated: February 12, 2026

    Looks out to: 2035

    “In total, AEP Ohio now has 17,861 MW of contracted data center projects. These contracted data center projects are scheduled to come online progressively through 2035.”

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 13,900 MW, forecast added load

    Stated: September 29, 2026

    Looks out to: 2030

    “Summer Peak Forecast Adjustments, Cumulative (MW), AEP Ohio row: 2027: 4,980; 2028: 7,459; 2029: 9,623; 2030: 13,900; 2031: 15,574; Ultimate: 17,116”

  • AEP Ohio

    Ohio (AEP Ohio service territory)

    Figure: 15,574 MW, forecast added load

    Stated: September 29, 2026

    Looks out to: 2031

    “Summer Peak Forecast Adjustments, Cumulative (MW), AEP Ohio row: 2027: 4,980; 2028: 7,459; 2029: 9,623; 2030: 13,900; 2031: 15,574; Ultimate: 17,116”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Oregon

Load figures whose territory sits in Oregon. The state name links to the state page, with the projects tracked there.

  • Portland General Electric

    Portland General Electric service territory (Oregon)

    Figure: 3,000 MW, load requests

    Stated: October 2025

    Looks out to: Not stated

    “PGE has around 3 GW of active data center load requests, more than 400 MW of which could energize by 2029, he added.”

  • Portland General Electric

    Hillsboro, Oregon (PGE service territory)

    Figure: 80 MW, forecast added load

    Stated: October 8, 2025

    Looks out to: 2026

    “This will result in over 80 MW of incremental capacity available for data center load in 2026, part of a total of more than 400 MW that will be energized by 2029.”

  • Portland General Electric

    Hillsboro, Oregon (PGE service territory)

    Figure: 400 MW, forecast added load

    Stated: October 8, 2025

    Looks out to: 2029

    “This will result in over 80 MW of incremental capacity available for data center load in 2026, part of a total of more than 400 MW that will be energized by 2029.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Pennsylvania

Load figures whose territory sits in Pennsylvania. The state name links to the state page, with the projects tracked there.

  • PPL

    PPL Electric Utilities service territory, Pennsylvania

    Figure: 31,800 MW, load requests

    Stated: August 7, 2026

    Looks out to: Not stated

    “PPL Electric Utilities' data center pipeline grew to 31.8 gigawatts (GW) in advanced stages of planning in the second quarter”

  • PPL

    PPL Electric Utilities service territory, Pennsylvania

    Figure: 9,000 MW, load requests

    Stated: April 23, 2025

    Looks out to: Not stated

    “requests in advanced stages in excess of 9 GW of new load”

  • PPL

    PPL Electric Utilities service territory, Pennsylvania

    Figure: 11,000 MW, signed agreements

    Stated: August 7, 2026

    Looks out to: Not stated

    “with over 11 GW under signed electric service agreements and more than 6.5 GW under construction”

South Carolina

Load figures whose territory sits in South Carolina. The state name links to the state page, with the projects tracked there.

  • Santee Cooper

    Santee Cooper service territory, South Carolina

    Figure: 5,800 MW, load requests

    Stated: June 3, 2026

    Looks out to: Not stated

    “the aggregate tracked and modeled megawatts remain broadly similar to prior years (5,800 MW tracked and 3,500 MW modeled stochastically)”

  • Santee Cooper

    Santee Cooper service territory, South Carolina

    Figure: 400 MW, forecast added load

    Stated: June 3, 2026

    Looks out to: Not stated

    “Despite that upward shift in planning percentile, the resulting planned large load figure of approximately 400 MW represents a substantial decrease from previous years, as many formerly prospective customers have since signed contracts and moved into the base forecast, leaving a smaller and less certain residual pool.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Texas

Load figures whose territory sits in Texas. The state name links to the state page, with the projects tracked there.

  • ERCOT

    ERCOT region, Texas

    Figure: 242,999 MW, load requests

    Stated: April 15, 2026

    Looks out to: 2032

    “TSP Large Load RFI submissions total 242,999 MW by 2032 (199,542 MW by 2030)”

  • ERCOT

    ERCOT region, Texas

    Figure: 138,010 MW, forecast peak load

    Stated: December 19, 2025

    Looks out to: 2030

    “ERCOT Adjusted Forecast summer peak load for 2030: 138,010 MW”

  • ERCOT

    ERCOT region, Texas

    Figure: 278,003 MW, forecast peak load

    Stated: April 15, 2026

    Looks out to: 2029

    “ERCOT projects approximately 278,003 MW of total demand in the ERCOT Region by 2029 and 367,790 MW by 2032”

  • ERCOT

    ERCOT region, Texas

    Figure: 367,790 MW, forecast peak load

    Stated: April 15, 2026

    Looks out to: 2032

    “ERCOT projects approximately 278,003 MW of total demand in the ERCOT Region by 2029 and 367,790 MW by 2032”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Utah

Load figures whose territory sits in Utah. The state name links to the state page, with the projects tracked there.

  • PacifiCorp

    Utah

    Figure: 3,000 MW, load requests

    Stated: August 12, 2026

    Looks out to: Not stated

    “Rocky Mountain Power reports that they have evaluated nearly 3GW, or 3000MW, of requests over a six month period from potential large scale power customers.”

  • Utah Legislature, Office of Legislative Research and General Counsel

    Utah

    Figure: 2,600 MW, forecast added load

    Stated: August 12, 2026

    Looks out to: Not stated

    “approximately 2600 megawatts (MW) of additional power will be necessary for the operation of data centers currently under construction”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Virginia

Load figures whose territory sits in Virginia. The state name links to the state page, with the projects tracked there.

  • Dominion Energy Virginia

    Dominion Energy Virginia service territory

    Figure: 25,000 MW, load requests

    Stated: May 2026

    Looks out to: 2031

    “We have assigned energization dates to 25 gigawatts of new data centers between now and 2031 for which we have current or soon-to-be-connected capacity.”

  • Dominion Energy Virginia

    Dominion Energy Virginia service territory

    Figure: 45,000 MW, load requests

    Stated: May 2026

    Looks out to: Not stated

    “For an additional 45 gigawatts of new data center projects, however, we have not yet offered future connection dates.”

  • Dominion Energy Virginia

    Dominion Energy Virginia service territory (DOM LSE)

    Figure: 40,000 MW, load requests

    Stated: December 2024

    Looks out to: Not stated

    “As of December 2024, the Company had in hand approximately 40 GW of data center-related capacity requests, more than twice DOM LSE's 2024 peak demand of 18,408.81 MW.”

  • Dominion Energy Virginia

    Dominion Energy Virginia service territory (DOM LSE)

    Figure: 9,000 MW, signed agreements

    Stated: December 2024

    Looks out to: Not stated

    “Of that 40 GW amount, approximately nine GW already have a meter in place and an executed Electric Service Agreement (ESA).”

  • Dominion Energy Virginia

    Dominion Energy Virginia service territory (DOM LSE)

    Figure: 3,600 MW, connected load

    Stated: December 2024

    Looks out to: Not stated

    “As of December 2024, this industry has an aggregated metered demand for DOM LSE of approximately 3.6 gigawatts (GW).”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Washington

Load figures whose territory sits in Washington. The state name links to the state page, with the projects tracked there.

  • Grant County PUD

    Grant County PUD service territory, Washington

    Figure: 1,568 MW, load requests

    Stated: August 27, 2024

    Looks out to: Not stated

    “Data centers account for the highest interest in growth in the queue with 1,568 MW.”

  • Grant County PUD

    Moses Lake area, Grant County, Washington

    Figure: 1,153 MW, load requests

    Stated: August 27, 2024

    Looks out to: Not stated

    “Quincy is the area with the highest level of interest with 1,578 MW while Moses Lake has 1,153 MW.”

  • Grant County PUD

    Quincy area, Grant County, Washington

    Figure: 1,578 MW, load requests

    Stated: August 27, 2024

    Looks out to: Not stated

    “Quincy is the area with the highest level of interest with 1,578 MW while Moses Lake has 1,153 MW.”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

Wisconsin

Load figures whose territory sits in Wisconsin. The state name links to the state page, with the projects tracked there.

  • WEC Energy Group

    Southeastern Wisconsin (We Energies service territory)

    Figure: 3,900 MW, forecast added load

    Stated: February 5, 2026

    Looks out to: 2030

    “we are now projecting 2.6 gigawatts of growth in the I-94 corridor and 1.3 gigawatts to the north of Milwaukee for a total of 3.9 gigawatts of electric demand growth in our 5-year plan”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

How to read these figures

The five kinds of figure are stages and measures, not one scale. Load requests are what customers have asked a utility to serve; signed agreements are load under contract; connected load is already drawing power. Forecast added load and forecast peak load are the publisher's own projections for a stated year, and a projection is not a result.

No figure here is added to another. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers describing the same territory in different years are not describing two loads. Each row stands on its own, with its publisher, its territory, and its date.

The record covers 27 states with a figure keyed to the state, plus 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track projects. A state with no group here is a state whose utilities and grid operators have published no figure we have found.

Every figure is draft research: traced to the publisher's own testimony, filing, or release by an AI research agent and not yet through verification. Each receipt says so, and names the exact place in the document the figure comes from.

The commitment side of the same record

A request is not a commitment, and a forecast is not an outcome. Of the 110 figures on this page, 16 are signed agreements: load a customer has contracted for, in 9 states and the multi-state territories. The terms those customers sign under are set in commission proceedings: we track 191 proceedings about very large loads, and 108 have been decided or are in effect. The decided terms typically require the customer to sign a minimum contract of 10 to 20 years and pay for at least 70 to 90 percent of its contracted demand every month whether it uses it or not. Each state group above lists the proceedings joined to its publishers; the full list is on the dockets page.

Of the 191 proceedings we track, 108 have been decided or are in effect. The dockets page lists every one, with its status and its terms.

This page sits under What it means for locals. Its sibling page, residential electricity prices, keeps the same kind of record for what households actually paid. The megawatts to homes calculator turns a figure on this page into household terms, and courts and dockets lists the proceedings behind the terms. The projects behind the load are ranked on largest projects by announced capacity, and the record's other rankings sit on lists from the record.

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

    Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

    Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.

Questions people ask

What is the largest load figure in the record?
The largest single request figure in the record is 242,999 MW from ERCOT, stated April 15, 2026. The largest signed agreement figure is 17,861 MW from AEP Ohio, stated February 12, 2026. Each is one publisher's figure for its own territory, printed with its source on its row above.
Why is there no national total?
Because the figures overlap. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers looking at the same territory in different years are not two loads. Adding the figures on this page would count the same expected load several times over, so the page prints each figure on its own row, with its publisher, its territory, and its date, and adds none of them together.
What is the difference between requests, signed agreements, and connected load?
They are stages of the same path. A request is load a customer has asked a utility to serve; most requests never become projects. A signed agreement is load under contract, with the terms a commission proceeding set. Connected load is load already drawing power. A forecast is the publisher's own projection of where its peak or its added load lands in a stated year: a projection, not a result.
Does every state have a figure here?
No. The record holds a figure keyed to 27 states; we track projects in 50 states and the District of Columbia. A state with no group on this page is a state whose utilities and grid operators have published no figure we have found, or one covered only inside a multi-state territory figure, which sits in the last group on this page under the territory's own name.

Sources

  1. 1
    2026 Nebraska Power Association Load and Capability Report (August 21, 2026)
    Nebraska Power Association (filed with the Nebraska Power Review Board)
    Tier 1 · Open the source
  2. 2
    NPPD Board of Directors meeting packet, June 2026 (2027-2032 Rate Outlook, Customer Committee support slides)
    Nebraska Public Power District
    Tier 1 · Open the source
  3. 3
    The Omaha area is running low on power capacity. That could harm Nebraska's ability to grow.
    Flatwater Free Press (with Grist)
    Tier 3 · Open the source
  4. 4
    2024 Joint Integrated Resource Plan, Volume 6, Technical Appendix LF-1 (Load Forecast)
    NV Energy (Nevada Power Company and Sierra Pacific Power Company)
    Tier 1 · Open the source
  5. 5
    Nevadas Data-Center Boom Is Outrunning Its Power Grid
    RCG Economics
    Tier 2 · Open the source
  6. 6
    Data Center Impacts in New Mexico: Policy Solutions for Water and Energy Use (fact sheet)
    Western Resource Advocates
    Tier 2 · Open the source
  7. 7
    Energy-intensive Projects in NYISO's Interconnection Queue
    New York Independent System Operator
    Tier 1 · Open the source
  8. 8
    AEP Ohio Updates PUCO on Data Center Load: Figures Show Tariff is Working
    AEP Ohio
    Tier 1 · Open the source
  9. 9
    2026 Load Forecast Adjustments (AEP)
    PJM Interconnection
    Tier 1 · Open the source
  10. 10
    PGE: Portland General Electric invests in AI-powered flexibility to speed data center connection (Utility Dive reporting)
    Utility Dive via Owler
    Tier 3 · Open the source
  11. 11
    Portland General Electric and GridCARE Accelerate Hundreds of Megawatts of Data Center Power in Leading U.S. Market
    Portland General Electric and GridCARE via PR Newswire
    Tier 4 · Open the source
  12. 12
    PPL Corporation Delivers Solid Second-Quarter 2026 Earnings; Reaffirms Guidance and Long-Term Growth Outlook
    PPL Corporation (via PR Newswire)
    Tier 4 · Open the source
  13. 13
    Testimony of Joseph B. Lookup (PPL Electric Utilities), En Banc Hearing on Interconnection and Tariffs for Large Load Customers, Docket No. M-2025-3054271
    Pennsylvania Public Utility Commission (filed by PPL Electric Utilities Corporation)
    Tier 1 · Open the source
  14. 14
    2026 IRP Stakeholder Working Group Meeting #11, Meeting Summary (June 3, 2026)
    Santee Cooper (South Carolina Public Service Authority)
    Tier 1 · Open the source
  15. 15
    ERCOT Preliminary Long-Term Load Forecast 2026-2032, filed in PUCT Project No. 58777
    ERCOT (filed with the Public Utility Commission of Texas)
    Tier 1 · Open the source
  16. 16
    ERCOT Report on the Capacity, Demand and Reserves, December 2025
    ERCOT
    Tier 1 · Open the source
  17. 17
    Data Centers (overview)
    Utah Legislature, Office of Legislative Research and General Counsel
    Tier 1 · Open the source
  18. 18
    GS-5 Large-Load Rate Class Report
    Dominion Energy Virginia
    Tier 1 · Open the source
  19. 19
    Direct testimony of Stan Blackwell, Dominion Energy Virginia, SCC Case No. PUR-2025-00058
    Virginia State Corporation Commission
    Tier 1 · Open the source
  20. 20
    Commission Recap, August 27, 2024: large-load growth queue
    Grant County Public Utility District
    Tier 1 · Open the source
  21. 21
    WEC Energy's Data Center Bet: 3.9 GW Load Growth Supports a $182 Price Target
    TIKR (summarizing WEC Energy Group's Q4 2025 earnings call, February 5, 2026)
    Tier 3 · Open the source

Back to What it means for locals

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Grid load growth by state." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/grid-load-growth