The standard Oregon large service delivery schedule. It applies to loads that have registered 1,000 kW or more more than once in a preceding 18-month period, and stays applicable until the consumer fails to meet or exceed 1,000 kW for 36 consecutive months. Monthly billing is a Distribution Charge plus a Transmission and Ancillary Services Charge plus a System Usage Charge. Distribution Charge at secondary, primary and transmission voltage: basic charge $800, $1,130 or $1,750 per month for facility capacity up to 4,000 kW, and $2,210, $3,120 or $4,480 above 4,000 kW; facilities charge per kW of facility capacity; on-peak demand charge $6.28, $7.78 or $6.09 per kW. Facility capacity is the average of the two greatest non-zero monthly demands in the 12 months ending with the current month. The minimum monthly charge is the basic charge plus the facilities charge, and a higher minimum may be required by contract. The company may require a written contract with a term of not less than one year. A consumer with a load of 25,000 kW or greater that received only the metering extension allowance gets a customer funded substation credit of $1.43 per kW at primary voltage. Partial requirements loads of 1,000 kW and over are served under Schedule 47, not this schedule.
The facts
- Regulator
- Public Utility Commission of Oregon
- Type
- Large load tariff
- Utility
- PacifiCorp
- State
- Oregon
- Status date
- Jan 1, 2025
- Large-load rules
- Yes, for loads of 1 MW or more
Projects served by PacifiCorp
- Aligned Data Centers SLC-01 (West Jordan)
- Aligned Data Centers SLC-02 (West Jordan)
- Aligned Data Centers SLC-03 (West Jordan)
- Aligned Data Centers SLC-04 (West Valley City)
- Aligned Salt Lake City Campus (SLC-01, SLC-02, SLC-03)
- Aligned SLC-04
- DataBank Granite Point Campus
- DataBank SLC1
- DataBank SLC1 (Salt Lake City)
- DataBank SLC2 (Salt Lake City)
- DataBank SLC3 (Salt Lake City)
- DataBank SLC4 (Salt Lake City)
Related cases and proceedings
- Utility commission · In effectSchedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
- Utility commission · In effectRocky Mountain Power Electric Service Schedule No. 400, Special Contracts (Wyoming)
- Utility commission · In effectInvestigation into New Load Connection Costs (Advice No. 24-38, revisions to Rule C and Rule I)
- Utility commission · In effectRocky Mountain Power Electric Service Schedule No. 400, Special Contract (Idaho)
- Utility commission · DecidedPacifiCorp Request for a General Rate Revision (2024 general rate case, very large customer charges)
- Utility commission · In effectPacifiCorp Advice 23-06, Rule 14 Line Extensions, Tariff WN U-76
- Utility commission · In effectPacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy
- Utility commission · DecidedJoint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)
Sources
- 1Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
PacifiCorp d/b/a Pacific PowerTier 1 · Schedule 48, Sixth Revision of Sheets No. 48-1 and 48-2 (Available, Applicable, Monthly Billing, Facility Capacity, Minimum Charge, Customer Funded Substation, Term of Contract sections; Advice No. 24-024, Docket No. UE 433, effective 2025-01-01) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)." Last activity 2025-01-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-pacificorp-or-sch48