PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy

Where it stands: In effect as of Dec 13, 2023

Draft research, not yet verified. Open a source to check any detail.

What it is

Oregon Rule 13 sets PacifiCorp's line extension allowances. As revised, a customer requiring 25,000 kW or more receives no extension allowance above the cost of the metering equipment needed to measure its usage. Before the revision, an applicant over 1,000 kW taking delivery at secondary or primary voltage received an allowance based on the estimated annual revenue the applicant would generate. The Commission first approved Advice No. 23-016 subject to refund on September 25, 2023, then affirmed it on December 13, 2023 and ended the investigation and refund exposure. The same order directed PacifiCorp to change the long-run incremental cost study in its next general rate case so distribution voltage customers larger than 25,000 kW are not overallocated distribution and substation costs. The order states no minimum demand charge, contract term, collateral or exit fee.

The facts

Regulator
Public Utility Commission of Oregon
Docket number
UE 424
Type
Interconnection rule
Utility
PacifiCorp
State
Oregon
Filed
Aug 17, 2023
Status date
Dec 13, 2023
Large-load rules
Yes, for loads of 25 MW or more

Projects served by PacifiCorp

Related cases and proceedings

In the record

  1. Utility case, Aug 17, 2023. Utility case filed: PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy Public Utility Commission of Oregon, UE 424

Sources

  1. 1
    Order No. 23-472, PacifiCorp Revision of Rule 13 Line Extension Policy, Docket UE 424
    Public Utility Commission of Oregon
    Tier 1 · Order No. 23-472 (entered 2023-12-13), Staff Report section (Advice No. 23-016 filed 2023-08-17, docketed as ADV 1534; 25,000 kW allowance limit; September 25, 2023 interim approval under Order No. 23-344; LRIC study direction) · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy." Last activity 2023-12-13. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-pacificorp-or-rule13-ue424