What it is
Oregon Rule 13 sets PacifiCorp's line extension allowances. As revised, a customer requiring 25,000 kW or more receives no extension allowance above the cost of the metering equipment needed to measure its usage. Before the revision, an applicant over 1,000 kW taking delivery at secondary or primary voltage received an allowance based on the estimated annual revenue the applicant would generate. The Commission first approved Advice No. 23-016 subject to refund on September 25, 2023, then affirmed it on December 13, 2023 and ended the investigation and refund exposure. The same order directed PacifiCorp to change the long-run incremental cost study in its next general rate case so distribution voltage customers larger than 25,000 kW are not overallocated distribution and substation costs. The order states no minimum demand charge, contract term, collateral or exit fee.
The facts
- Regulator
- Public Utility Commission of Oregon
- Docket number
- UE 424
- Type
- Interconnection rule
- Utility
- PacifiCorp
- State
- Oregon
- Filed
- Aug 17, 2023
- Status date
- Dec 13, 2023
- Large-load rules
- Yes, for loads of 25 MW or more
Projects served by PacifiCorp
- Aligned Data Centers SLC-01 (West Jordan)
- Aligned Data Centers SLC-02 (West Jordan)
- Aligned Data Centers SLC-03 (West Jordan)
- Aligned Data Centers SLC-04 (West Valley City)
- Aligned Salt Lake City Campus (SLC-01, SLC-02, SLC-03)
- Aligned SLC-04
- DataBank Granite Point Campus
- DataBank SLC1
- DataBank SLC1 (Salt Lake City)
- DataBank SLC2 (Salt Lake City)
- DataBank SLC3 (Salt Lake City)
- DataBank SLC4 (Salt Lake City)
Related cases and proceedings
- Utility commission · In effectRocky Mountain Power Electric Service Schedule No. 400, Special Contract (Idaho)
- Utility commission · In effectSchedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
- Utility commission · DecidedPacifiCorp Request for a General Rate Revision (2024 general rate case, very large customer charges)
- Utility commission · In effectPacifiCorp Advice 23-06, Rule 14 Line Extensions, Tariff WN U-76
- Utility commission · DecidedJoint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)
- Court case · SettledCity of The Dalles v. The Oregonian (Google water records)
In the record
- Utility case, Aug 17, 2023. Utility case filed: PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy Public Utility Commission of Oregon, UE 424
Sources
- 1Order No. 23-472, PacifiCorp Revision of Rule 13 Line Extension Policy, Docket UE 424
Public Utility Commission of OregonTier 1 · Order No. 23-472 (entered 2023-12-13), Staff Report section (Advice No. 23-016 filed 2023-08-17, docketed as ADV 1534; 25,000 kW allowance limit; September 25, 2023 interim approval under Order No. 23-344; LRIC study direction) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy." Last activity 2023-12-13. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-pacificorp-or-rule13-ue424