Utility commission
Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
Where it stands: In effect as of Jan 1, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
The standard Washington large service schedule. It applies to loads that have exceeded 999 kW in more than one month of any consecutive 18-month period, and stays applicable until the customer fails to exceed 999 kW for 36 consecutive months. Monthly billing is basic, load size, demand, energy and reactive power charges, adjusted under Schedule 80. Load size is the average of the two greatest non-zero monthly demands in the 12 months ending with the current month; load sizes up to 3,000 kW are Small and above 3,000 kW are Large. Current basic charges run from $1,176.57 per month (secondary, small) to $3,951.23 (primary dedicated facilities and transmission); on-peak demand charges run $8.92 to $11.05 per kW by delivery level. On-peak demand is the greater of the measured on-peak 15-minute maximum or 500 kW. The monthly minimum charge is the sum of the basic, load size and demand charges, unless a contract specifies a higher minimum. The company may require a written contract with a term of not less than one year. Customers over 30,000 kW served from a dedicated substation they site on their own land take the Primary Dedicated Facilities delivery level. Intermittent, partial requirements or highly fluctuating loads are served only by special contract, and partial requirements loads of 1,000 kW and over go to Schedule 47T.
The facts
- Regulator
- Washington Utilities and Transportation Commission
- Docket number
- UE-250224
- Type
- Large load tariff
- Utility
- PacifiCorp
- State
- Washington
- Status date
- Jan 1, 2026
- Large-load rules
- Yes, for loads of 1 MW or more
Projects served by PacifiCorp
- Aligned Data Centers SLC-01 (West Jordan)
- Aligned Data Centers SLC-02 (West Jordan)
- Aligned Data Centers SLC-03 (West Jordan)
- Aligned Data Centers SLC-04 (West Valley City)
- Aligned Salt Lake City Campus (SLC-01, SLC-02, SLC-03)
- Aligned SLC-04
- DataBank Granite Point Campus
- DataBank SLC1
- DataBank SLC1 (Salt Lake City)
- DataBank SLC2 (Salt Lake City)
- DataBank SLC3 (Salt Lake City)
- DataBank SLC4 (Salt Lake City)
Related cases and proceedings
- Utility commission · Pending before the commissionDivision of Public Utilities' Request for an Investigatory Docket Regarding Rocky Mountain Power's Line Extension Policy for Large Loads
- Utility commission · Pending before the commissionCommission-led workshop series and policy statement on large load interconnections and tariffs
- Utility commission · DecidedApplication of Rocky Mountain Power for Approval of Large-Load Service Contract between PacifiCorp and a Large-Load Customer
- Utility commission · In effectProposed Rulemaking Concerning Utah Code Sections 54-26-101 to -901, Large-Scale Electric Service Requirements
- Utility commission · In effectRocky Mountain Power Electric Service Schedule No. 400, Special Contracts (Wyoming)
- Utility commission · In effectRocky Mountain Power Electric Service Schedule No. 400, Special Contract (Idaho)
- Utility commission · In effectSchedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
- Utility commission · DecidedPacifiCorp Request for a General Rate Revision (2024 general rate case, very large customer charges)
Sources
- 1Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
PacifiCorp d/b/a Pacific Power & Light CompanyTier 1 · Schedule 48T, Fifth Revision of Sheet No. 48T.1 (Applicable, Monthly Billing, Load Size note; issued 2025-12-23, effective 2026-01-01, Docket No. UE-250224) and Sheets No. 48T.2 and 48T.3 (Time Periods, Minimum Charge, Delivery Service including Primary Dedicated Facilities over 30,000 kW, On-Peak Demand 500 kW floor, Term of Contract; effective 2024-04-03, Docket No. UE-230172) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)." Last activity 2026-01-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-pacificorp-wa-sch48t