Data center court cases and dockets
A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.
211 dockets, page 4 of 6
Cases and proceedings
Utility commissionDecidedLarge loads
Duke Energy Carolinas, LLC general rate case (Large Load Stipulation)
Public Service Commission of South Carolina · Docket 2025-172-E · Duke Energy Carolinas, LLC · South Carolina
Utility commissionDecidedLarge loads
Georgia Power Company’s Applications for the Certification of Capacity from the 2029-2031 All-Source RFP (Docket 56298) and of Supplemental Resources for 2028-2031 Capacity (Docket 56310)
Georgia Public Service Commission · Docket 56298 and 56310 · Georgia Power Company · Georgia
Utility commissionPending before the commissionLarge loads
Petition of Staff of the Delaware Public Service Commission Regarding a Large Load Tariff to be Promulgated by Delmarva Power & Light Company
Delaware Public Service Commission · Docket 25-0826 · Delmarva Power & Light Company · Delaware
Utility commissionDecidedLarge loads
Application of DTE Electric Company for approval of special contracts with Green Chile Ventures LLC (primary supply agreement and energy storage agreement)
Michigan Public Service Commission · Docket U-21990 · DTE Electric · Michigan
Court casePending
Katherine McIntosh et al. v. Commonwealth of Pennsylvania, Department of Environmental Protection; Homer City Generation, LP, permittee
Pennsylvania Environmental Hearing Board · Docket 2025-136-B · Center Township · Pennsylvania
About: Homer City Energy Campus
Court casePending
Clean Air Council, Citizens for Pennsylvania's Future, and Sierra Club v. Commonwealth of Pennsylvania, Department of Environmental Protection; Homer City Generation, LP, permittee
Pennsylvania Environmental Hearing Board · Docket 2025-135-B · Center Township · Pennsylvania
About: Homer City Energy Campus
Utility commissionDecidedLarge loads
Duke Energy Progress, LLC general rate case (Large Load Stipulation)
Public Service Commission of South Carolina · Docket 2025-154-E · Duke Energy Progress, LLC · South Carolina
Utility commissionDecidedLarge loads
IN THE MATTER OF ENTERGY ARKANSAS, LLC’S APPLICATION FOR APPROVAL TO ENTER INTO A SPECIAL RATE CUSTOMER CONTRACT AND FOR ALL OTHER RELATED APPROVALS
Arkansas Public Service Commission · Docket 25-055-P · Entergy Arkansas LLC · Arkansas
Utility commissionDecidedLarge loads
Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC
Arizona Corporation Commission · Docket E-01933A-25-0187 · Tucson Electric Power Company · Arizona
Utility commissionDecidedLarge loads
IN THE MATTER OF ENTERGY ARKANSAS, LLC’S STRATEGIC INVESTMENT RECOVERY RIDER
Arkansas Public Service Commission · Docket 25-049-TF · Entergy Arkansas LLC · Arkansas
Utility commissionDecidedLarge loads
Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
Virginia State Corporation Commission · Docket PUR-2025-00058 · Dominion Energy Virginia · Virginia
Utility commissionIn effectLarge loads
Registration of Will-Power UT, LLC as a Large-Scale Generation Provider (Project Aquila, Eagle Mountain)
Utah Public Service Commission · Docket 25-2660-01 · Utah
Utility commissionPending before the commissionLarge loads
Regulatory reform for electric utilities: Alaska Power & Telephone comments proposing incremental and marginal cost rates for priority industries, including data centers
Regulatory Commission of Alaska · Docket I-25-008 · Alaska Power & Telephone Company · Alaska
Utility commissionDecidedLarge loads
In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)
Missouri Public Service Commission · Docket EO-2025-0154 · Evergy Missouri West · Missouri
Utility commissionDecidedLarge loads
In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)
Missouri Public Service Commission · Docket EO-2025-0154 · Evergy Metro · Missouri
Utility commissionPending before the commissionLarge loads
Petition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
Virginia State Corporation Commission · Docket PUR-2025-00057 · Appalachian Power Co · Virginia
Court casePending
City of Hilliard v. Ohio Environmental Protection Agency (fuel cell permit appeal)
Ohio Environmental Review Appeals Commission · Franklin County · Ohio
About: Amazon Web Services Hilliard campus
Utility commissionDecidedLarge loads
Application of Consumers Energy Company for approval of amendments to Rate GPD (Data Center Provision)
Michigan Public Service Commission · Docket U-21859 · Consumers Energy · Michigan
Utility commissionDecidedLarge loads
Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)
Kansas Corporation Commission · Docket 25-EKME-315-TAR · Evergy Metro · Kansas
Utility commissionDecidedLarge loads
Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)
Kansas Corporation Commission · Docket 25-EKME-315-TAR · Evergy Kansas Central · Kansas
Utility commissionDecidedLarge loads
Public Service Company of Colorado 2024 Just Transition Solicitation (Electric Resource Plan), Phase 1
Colorado Public Utilities Commission · Docket 24A-0442E · Public Service Co of Colorado · Colorado
Utility commissionIn effectLarge loads
Buy-Through Program
Board of Directors, Salt River Project Agricultural Improvement and Power District · Salt River Project · Arizona
Utility commissionIn effectLarge loads
E-65, Standard Price Plan for Substation Large General Service
Board of Directors, Salt River Project Agricultural Improvement and Power District · Salt River Project · Arizona
Utility commissionIn effectLarge loads
E-66, Standard Price Plan for Substation Large General Service with Instantaneously Interruptible Load
Board of Directors, Salt River Project Agricultural Improvement and Power District · Salt River Project · Arizona
Utility commissionIn effectLarge loads
E-67, Standard Price Plan for Large Load Substation Large General Service
Board of Directors, Salt River Project Agricultural Improvement and Power District · Salt River Project · Arizona
Utility commissionDecidedLarge loads
Electric Rule 2, 15, and 16 Exceptional Case Submittal for Electric Transmission Service Facilities for STACK Infrastructure
California Public Utilities Commission · Docket Resolution E-5420 (Advice Letter 7569-E) · Pacific Gas & Electric Co. · California
Utility commissionIn effectLarge loads
Electronic Tariff Filing of East Kentucky Power Cooperative, Inc. to Establish a New Tariff for Data Center Power (Rate DCP)
Kentucky Public Service Commission · Docket 2025-00140 · East Kentucky Power Cooperative, Inc. · Kentucky
Utility commissionDecidedLarge loads
Electronic Application of Kentucky Utilities Company and Louisville Gas and Electric Company for Certificates of Public Convenience and Necessity and Site Compatibility Certificates
Kentucky Public Service Commission · Docket 2025-00045 · Kentucky Utilities Co · Kentucky
Utility commissionDecidedLarge loads
Verified Petition of NIPSCO Generation LLC for Certain Determinations by the Commission with Respect to Its Jurisdiction Over Petitioner's Activities as a Non-Retail Generator of Electric Power
Indiana Utility Regulatory Commission · Docket Cause No. 46183 · Northern Indiana Public Service Company · Indiana
Utility commissionPending before the commissionLarge loads
Petition of Mecklenburg Electric Cooperative for approval to implement a new Large Power Service Rate Schedule (Schedule LPS-U)
Virginia State Corporation Commission · Docket PUR-2025-00160 · Mecklenburg Electric Cooperative · Virginia
Utility commissionDecidedLarge loads
Application of Entergy Louisiana, LLC for Approval of Generation and Transmission Resources Proposed in Connection with Service to a Significant Customer Project in North Louisiana, Including Proposed Rider, and Request for Timely Treatment
Louisiana Public Service Commission · Docket U-37425 · Entergy Louisiana LLC · Louisiana
Utility commissionDecidedLarge loads
Application of El Paso Electric Company for an Economic Development Rate Rider for a New Data Center to be Located in El Paso, Texas
Public Utility Commission of Texas · Docket Docket No. 56903 · El Paso Electric Co · Texas
Utility commissionDecidedLarge loads
Georgia Power Company’s 2025 Integrated Resource Plan
Georgia Public Service Commission · Docket 56002 · Georgia Power Company · Georgia
Utility commissionDecidedLarge loads
Application of Ohio Power Company for approval of a Data Center Power tariff (Schedule DCT) and a Mobile Data Center tariff
Public Utilities Commission of Ohio · Docket 24-508-EL-ATA · AEP Ohio · Ohio
Utility commissionIn effectLarge loads
Petition of Rappahannock Electric Cooperative For approval to implement a new Large Power Dedicated Facilities Rate Schedule
Virginia State Corporation Commission · Docket PUR-2025-00048 · Rappahannock Electric Cooperative · Virginia
Utility commissionDecidedLarge loads
IN RE: SPECIAL CONTRACT BETWEEN MISSISSIPPI POWER COMPANY AND COMPASS DATACENTERS JAN I, LLC
Mississippi Public Service Commission · Docket 2025-UN-3 · Mississippi Power Co · Mississippi
Utility commissionPending before the commissionLarge loads
Evaluation of Transmission Cost Recovery
Public Utility Commission of Texas · Docket Project No. 58484 · AEP Texas North Company · Texas
Utility commissionPending before the commissionLarge loads
Large Load Demand Management Service
Public Utility Commission of Texas · Docket Project No. 58482 · AEP Texas North Company · Texas
Utility commissionIn effectLarge loads
Rocky Mountain Power Electric Service Schedule No. 400, Special Contracts (Wyoming)
Wyoming Public Service Commission · Docket 20000-671-ER-24 · PacifiCorp · Wyoming
Utility commissionPending before the commissionLarge loads
Application of Union Electric Company d/b/a Ameren Missouri for approval of new or modified tariffs for service to large load customers (Large Load Customer Rate Plan)
Missouri Public Service Commission · Docket ET-2025-0184 · Ameren Missouri · Missouri
Sources on this page
- 1Filing in Docket No. 2025-172-E citing Order No. 2025-769 (December 31, 2025)
Public Service Commission of South CarolinaTier 1 · Draft research, not yet verified · Open the source - 2Order Adopting Stipulation and Granting Certification, Docket Nos. 56298 and 56310
Georgia Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 3Order No. 10816, Docket No. 25-0826 (large load tariff to be promulgated by Delmarva Power & Light Company)
Delaware Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 4Notice of Public Comment Session, Docket No. 25-0826
Delaware Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 5MPSC approves DTE Electric energy contracts for data center with conditions to strengthen protections for other customers (news release)
Michigan Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 6Motion for Consolidation, Homer City Generation, LP, EHB Docket No. 2025-136-B (filed February 26, 2026)
Pennsylvania Environmental Hearing Board (filing by permittee Homer City Generation, LP; republished copy hosted by Our Children's Trust)Tier 4 · Draft research, not yet verified · Open the source - 7Pennsylvania case page: Katherine McIntosh et al. v. Commonwealth of Pennsylvania (Homer City Generation Project appeal)
Our Children's Trust (appellants' counsel)Tier 4 · Draft research, not yet verified · Open the source - 8Notice of Appeal, Clean Air Council, Citizens for Pennsylvania's Future and Sierra Club v. Department of Environmental Protection; Homer City Generation, LP, permittee (appeal of Plan Approval No. 32-00457A)
Pennsylvania Environmental Hearing Board (filing; republished copy hosted by appellant Citizens for Pennsylvania's Future)Tier 4 · Draft research, not yet verified · Open the source - 9Environmental and community groups appeal DEP approval of Homer City gas plant air permit (December 18, 2025)
Clean Air Council (appellant)Tier 4 · Draft research, not yet verified · Open the source - 10Filing in Docket No. 2026-78-E citing Order No. 2025-757 (December 12, 2025), Docket No. 2025-154-E
Public Service Commission of South CarolinaTier 1 · Draft research, not yet verified · Open the source - 11Order No. 9 in Docket No. 25-055-P (Entergy Arkansas special rate customer contract approval)
Arkansas Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 12ACC Approves TEP Energy Supply Agreement, Ensures Customer Protections from Costs Related to Data Center Project
Arizona Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 13Open Meeting Memorandum and Staff Proposed Order, Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC (Docket No. E-01933A-25-0187)
Arizona Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 14
- 15Setting the Record Straight: TEP Reaffirms Transparency, Accountability, and Regulatory Oversight in Project Blue Agreement
Tucson Electric PowerTier 1 · Draft research, not yet verified · Open the source - 16Order No. 14 (Doc. 103), Docket No. 25-049-TF, approving Rate Schedule No. 73, the Generating Arkansas Jobs Act Rider
Arkansas Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 17SCC Issues Order on DEV Biennial Review 2025
Virginia State Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 18Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
Dominion Energy VirginiaTier 1 · Draft research, not yet verified · Open the source - 19Notice of Registration of Will-Power UT, LLC as a Large-Scale Generation Provider, Docket No. 25-2660-01
Utah Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 20Comments of Alaska Power & Telephone Company in Docket I-25-008 (regulatory reform for electric utilities)
Regulatory Commission of Alaska (filing by Alaska Power & Telephone Company)Tier 1 · Draft research, not yet verified · Open the source - 21'Fair Share' or Cross-Subsidy? PSC Staff Broke with Commissioners on Evergy's Data Center Tariff
ACT4MOTier 4 · Draft research, not yet verified · Open the source - 22What Evergy's Large-Load Tariff Means for Your Electric Bill
Brian Curry (research analysis)Tier 3 · Draft research, not yet verified · Open the source - 23Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S., Case PUR-2025-00057
Virginia State Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 24Partial Stipulation, Case PUR-2025-00057 (filed November 10, 2025)
Virginia State Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 25Hilliard to appeal EPA fuel cell permit for Amazon site
City of HilliardTier 1 · Draft research, not yet verified · Open the source - 26MPSC approves terms of service between Consumers Energy and data centers, other very large customers (news release)
Michigan Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 27News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
Kansas Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 28Sierra Club Supports KCC Approved Plan to Protect Customers
Sierra ClubTier 4 · Draft research, not yet verified · Open the source - 292025 JTS Written Order summary, Proceeding No. 24A-0442E
Colorado Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 30Buy-Through Program for large businesses
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 31E-65, Standard Price Plan for Substation Large General Service (November 2025 billing cycle)
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 32E-66, Standard Price Plan for Substation Large General Service with Instantaneously Interruptible Load (November 2025 billing cycle)
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 33E-67, Standard Price Plan for Large Load Substation Large General Service (November 2025 billing cycle)
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 34Resolution E-5420: PG&E Advice Letter 7569-E exceptional case, STACK Infrastructure (SI SVY01PG&E, LLC), San Jose
California Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 35Order, Case No. 2025-00140, East Kentucky Power Cooperative Data Center Power tariff (October 30, 2025)
Kentucky Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 36Case filings index, Case No. 2025-00045 (KU and LG&E CPCN application)
Kentucky Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 37NiSource release: IURC approval of the NIPSCO GenCo declination of jurisdiction (Cause No. 46183)
NiSource Inc. (Business Wire)Tier 4 · Draft research, not yet verified · Open the source - 38Schedule LPS-U, Large Power Service
Mecklenburg Electric CooperativeTier 1 · Draft research, not yet verified · Open the source - 39Order for Notice and Comment, Case No. PUR-2025-00160 (Mecklenburg Electric Cooperative Schedule LPS-U)
Virginia State Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 40Order No. U-37425 (issued August 29, 2025)
Louisiana Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 41PUCT Interchange filing index, Project or Docket No. 56903
Public Utility Commission of TexasTier 1 · Draft research, not yet verified · Open the source - 42Stipulation, Docket Nos. 56002 and 56003, Georgia Power 2025 Integrated Resource Plan
Georgia Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 43Data Center Costs, PUCO Case 24-0508-EL-ATA (case page and update)
Office of the Ohio Consumers' CounselTier 2 · Draft research, not yet verified · Open the source - 44Schedule LP-DF, Large Power Dedicated Facilities Rate Schedule (SCC accepted for filing January 29, 2026; effective July 1, 2025)
Rappahannock Electric CooperativeTier 1 · Draft research, not yet verified · Open the source - 45Mississippi Public Utilities Staff FY2025 Annual Report
Mississippi Public Utilities StaffTier 1 · Draft research, not yet verified · Open the source - 46MS PSC Consent Docket, Regular Meeting February 4, 2025
Mississippi Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 47SB 6 Rulemakings Chart
Public Utility Commission of TexasTier 1 · Draft research, not yet verified · Open the source - 48Senate Bill 6 enrolled bill analysis
Texas Senate Research CenterTier 1 · Draft research, not yet verified · Open the source - 49Rocky Mountain Power Wyoming Electric Service Schedule No. 400, Special Contracts (P.S.C. Wyoming No. 19, Original Sheets 400-1 to 400-3)
Rocky Mountain Power (PacifiCorp)Tier 1 · Draft research, not yet verified · Open the source - 50Public notice of Rocky Mountain Power application to establish Tariff Schedule 400, Special Contracts, Docket No. 20000-602-ET-21 (legal notice as published July 13, 2021)
Wyoming Public Service Commission (notice published in the Kemmerer Gazette)Tier 1 · Draft research, not yet verified · Open the source - 51PacifiCorp Reply Testimony of Craig M. Eller, Oregon Docket No. UE 463, Exhibit PAC/200
PacifiCorpTier 1 · Draft research, not yet verified · Open the source - 52Application and Request for Variance, File No. ET-2025-0184 (Union Electric Company d/b/a Ameren Missouri, Large Load Customer Rate Plan)
Missouri Public Service Commission (EFIS filing)Tier 1 · Draft research, not yet verified · Open the source - 53Staff's Brief Regarding Ameren Missouri's Variance Request, File No. ET-2025-0184
Missouri Public Service Commission (EFIS filing)Tier 1 · Draft research, not yet verified · Open the source