Utility commission
Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)
Where it stands: Decided as of Nov 6, 2025
Draft research, not yet verified. Open a source to check any detail.
What it is
Establishes the Large Load Power Service (LLPS) rate plan for Evergy's Kansas companies under a unanimous settlement of Evergy, Commission Staff, the Citizens' Utility Ratepayer Board, the Data Center Coalition, Google, Sierra Club, NRDC, Kansas Industrial Consumers, and others. The plan applies to any new facility beginning service with a peak load forecast of 75 MW or more, and to existing customers expanding by 75 MW; the settlement lowered the threshold from the 100 MW Evergy proposed. Customers sign for a minimum of 12 years at full contract capacity after an optional ramp of up to five years (17 years in total), with automatic five-year extensions. The minimum monthly bill is 80 percent of contract demand regardless of use, and customers post collateral equal to two years of minimum monthly bills. Customers pay for transmission upgrades needed to serve them, and demand and energy rates are designed to cover Evergy's incremental cost of serving large loads, which Commission staff estimated puts LLPS rates 7 to 10 percent above existing industrial rates. Early termination requires 36 months' notice and an exit fee of the greater of the remaining term's minimum bills or 12 months. Four clean energy options, including a clean energy choice rider, are part of the plan.
The facts
- Regulator
- Kansas Corporation Commission
- Docket number
- 25-EKME-315-TAR
- Type
- Large load tariff
- Utility
- Evergy Metro
- State
- Kansas
- Filed
- Feb 11, 2025
- Status date
- Nov 6, 2025
- Large-load rules
- Yes, for loads of 75 MW or more
Projects served by Evergy Metro
Related cases and proceedings
In the record
- Utility case, Feb 11, 2025. Utility case filed: Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS) Kansas Corporation Commission, 25-EKME-315-TAR
Sources
- 1News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
Kansas Corporation CommissionTier 1 · KCC news release of November 6, 2025 (the order: 75 MW threshold; 12-year term plus five-year ramp; 80 percent minimum bill; two years of collateral; incremental cost rates); Sierra Club release (threshold and term changes from the original proposal) · Open the source - 2Sierra Club Supports KCC Approved Plan to Protect Customers
Sierra ClubTier 4 · KCC news release of November 6, 2025 (the order: 75 MW threshold; 12-year term plus five-year ramp; 80 percent minimum bill; two years of collateral; incremental cost rates); Sierra Club release (threshold and term changes from the original proposal) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)." Last activity 2025-11-06. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-evergy-metro-llps-ks-2025